7860 Mission Center Court WCF / PR]-1132809
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves the installation of a new wireless communication facility at 7860 Mission Center Court in San Diego, California, within the public right-of-way. The facility includes a single Alpha PN-4 power node system enclosure measuring 52 inches in height, 26 inches in width, and 24 inches in depth, mounted on a four-inch precast concrete pad and equipped with six 12-volt batteries. This enclosure will be electrically connected via wires and conduits to an existing telecommunications cabinet on-site. The site is zoned Employment Mixed-Use EMX-2 and designated Mixed Use – High Density under the Mission Valley Community Plan, and falls within multiple overlay areas including the Airport Land Use Compatibility Overlay Zone for both San Diego International Airport and Montgomery Field, the Transit Priority Area, and the FAA Part 77 Noticing Area, requiring compliance with aviation safety regulations. The project is classified as ministerial and exempt from environmental review under CEQA Section 15303 as a small structure with no significant environmental impacts. The City of San Diego is the approving agency, with Jeff Szymanski, Senior Planner, listed as the primary point of contact, and Karla Hernandez of Charter Communications identified as the project proponent. There is no formal contract value, pricing, or payment information provided, as the documentation pertains to a permitting and environmental exemption process rather than a procurement contract. No FAR clauses, evaluation factors, special contract requirements, or federal acquisition elements such as COR/COTR designations, invoicing methods, or accounting codes are applicable or included, since this is a local permitting action under CEQA and municipal code, not a federal contract. The submission is processed through county clerk channels with no specified deadline, and the project is presented as a forecasted permitting activity with no solicitation or award mechanism in place. The only formal deliverable is the installation of the equipment in accordance with approved specifications and regulatory clearances, with acceptance occurring at the site upon successful permitting and compliance verification.
General Info
Agency
NAICS
Place of Performance
San Diego, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
