Edenhurst Ave On-Ramp Interchange Guy Power Pole Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Los Angeles Department of Water and Power is undertaking the Edenhurst Ave On-Ramp Interchange Guy Power Pole Replacement project in Los Angeles, California. The project involves replacing a guy power pole that was struck and downed within the Caltrans Right-of-Way at the Edenhurst Ave/Colorado St. freeway exit. This replacement is necessary to provide essential structural support for the existing power distribution infrastructure in the area. The project is classified as a forecast under NAICS code 237130 and is managed by Environmental Specialist James R. Howe. The scope of work includes excavating a hole approximately 6.5 feet deep and 13 inches in diameter to install a new 45-foot tall pole. LADWP will utilize a digger derrick, bucket truck, and foreman truck to complete the installation. All equipment will be staged on sparsely vegetated areas within the right-of-way, and the project requires no vegetation removal. The project has been granted a categorical exemption under the California Environmental Quality Act CEQA Section 15301, Class 1 and Section 15302, Class 2, as it involves minor alterations and the replacement of existing structures without expanding the current use.

General Info

LADWP will replace a damaged guy power pole at Edenhurst Ave, Los Angeles.

Agency

California Los Angeles Department of Water and Power

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Edenhurst Ave / Colorado St. Fwy Exit, Los Angeles, CA, 90039

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Pole Replacement Edenhurst Ave On-Ramp

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Los Angeles Department of Water and Power
Contacts1 person available
OfficeN/A
Organization / Agency
California Los Angeles Department of Water and Power
Office AddressN/A
Contacts
James R HoweEnvironmental Specialist

Full Description

Show more
Notice of Exemption pursuant to CEQA Section 15301, Class 1 and Section 15302, Class 2. The Los Angeles Department of Water and Power (LADWP) is proposing to replace a guy power pole that was struck and downed in the Caltrans Right-of-Way at the on-ramp interchange at the Edenhurst Ave./Colorado St. freeway exit. LADWP will use a digger derrick, bucket truck, and foreman truck to dig an approximately 6.5 feet deep and 13-inch diameter hole, and set the new 45-foot tall pole. The guy power pole is required to provide structural support for existing power distribution infrastructure in the area. All equipment will be staged on sparsely vegetated areas within the right-of-way, and will not require vegetation removal.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237130
New
Federal
Sources Sought for the Recapitalization of the Navy’s High Voltage (230kV) Transmission Loop and all Ancillary Equipment at Naval Submarine Base Kings Bay, GA
Solicitation # N69450-26-R-PW20
This sources sought notice seeks to identify qualified offerors for the wholesale recapitalization and cybersecurity hardening of the 230kV high voltage transmission loop and all ancillary equipment at Naval Submarine Base Kings Bay, Georgia. The project is envisioned as a design-build effort with an estimated magnitude between $100 million and $250 million and an anticipated period of performance of approximately 900 calendar days. Key technical requirements include the relocation of the high power loop and crossing tower, replacement of conductors, installation of smart motor-operated disconnects and vacuum/SF6 circuit breakers, and the modernization of substation digital protective relays. All telemetry and relay configurations must comply with NERC CIP standards and DoD Unified Facilities Criteria 4-010-06 for Industrial Control Systems. Due to the critical nature of the nuclear deterrent mission and the requirement for seamless integration with the Georgia Power Company (GPC) macro-grid, the government is considering this procurement under other than full and open competition. Potential sources must demonstrate significant financial capability, including a single project bonding capacity of $200 million, and possess specialized experience in 230kV live cutovers and cryptographic SCADA telemetry interconnection. Security requirements are stringent, requiring U.S. citizenship and at least Tier 3/Secret clearance for key personnel, including project managers and cybersecurity leads, to access restricted areas such as nuclear-support zones and the Defensive Ordnance Support Facility. Responses are due by 2:00 PM EDT on October 6, 2026, under NAICS codes 237130 or 221122.
Navfacsyscom Southeast

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS