Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

838999_Petro-Lud_OG

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Petro-Lud, Inc. is undertaking a project in the Jacalitos oil field in Coalinga, California, to perform a plugback and sidetrack of existing production well 53, identified by API number 0401905216. The primary objective is to restore economic production rates by replacing a depleted completion and perforating the same Temblor zone. The project involves creating a new wellbore with a total depth similar to the current one, with a bottom-hole location situated 200 feet from the existing wellbore. The operation will be executed by a drilling rig operating 24 hours a day over approximately four days. To minimize environmental impact, all equipment, including pumps, tanks, and cementing trucks, will be confined to existing access roads and the current well pad to avoid expanding the footprint. The project will utilize approximately 1,000 barrels of fresh water sourced from agricultural water wells. The California Department of Conservation, Geologic Energy Management Division (CalGEM) has issued a Notice of Exemption for this project, determining it is exempt from CEQA environmental review under categorical exemptions for existing facilities, replacement or reconstruction, and minor alterations to land.

General Info

Petro-Lud will plugback and sidetrack well 53 in Coalinga to restore oil production.

Agency

California Conservation, Department of

Place of Performance

Coalinga, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Catherine CalantasData Tech

Full Description

Show more
Petro-Lud, Inc. proposes to plugback and sidetrack of existing production well to restore economic rates in same zone. The well site is accessible by existing roads and will not expand the footprint of the well pad. The project will be executed by a drilling rig with 24-hour operation over approximately a 4-day period. The purpose is to replace the existing function of the oil & gas production as the current completion has been depleted. The well will be perforated (completed) in the same Temblor zone as the current wellbore. The new wellbore’s total depth will be similar the current wellbore. The bottomhole location of the new wellbore will be 200’ from the current wellbore. The rig and associated equipment including pump, tanks, and cementing trucks and will only be situated on the existing well pad and access roads. Approximately 1000 bbl of fresh water will be used sourced from ag water wells. The proposed project consists of the California Department of Conservation, Geologic Energy Management Division (CalGEM) approving a permit for Petro-Lud, Inc. to perform work on the well listed below, in the Jacalitos oil field. API # Well Name 0401905216 53

Similar Contracts

Same NAICS industry code

NAICS: 213111
New
SLED
ODNR, Division of Oil & Gas – OWP – Federal Project –Scioto 3F - 2 Wells
Solicitation # SRC0000042633
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for the Scioto 3F Project to plug and plate two orphan wells, Oertels Corner #1 and Romanello #1, located in Jefferson Township, Scioto County. The scope of work encompasses mobilization, well site development, drilling or cleaning out and plugging of the wells, decommissioning and disposal of all casing and production equipment, and full restoration of disturbed areas. Key technical deliverables include the installation of cement plugs from 210 feet to within 30 inches of ground level and the maintenance of strict well control throughout the process. Work must be performed in accordance with Ohio Revised Code 1509 and Ohio Administrative Code Chapters 1501:9-11 and 1501:9-12. As a federally funded project, contractors must comply with Davis-Bacon prevailing wage requirements and Buy America sourcing mandates for iron, steel, and manufactured construction materials. Eligible bidders must be active on CSP900922 (DAS Index No. MAC110), attend the mandatory pre-bid meeting on November 4, 2026, and be in good standing with the agency. The contract will be awarded to the lowest responsive and responsible bidder based on submissions via OhioBuys. Performance must begin within three months of the contract end date and be completed by May 1, 2027, or five months after the effective date, whichever is sooner. Invoicing is managed through the Orphan Well Project Management Contractor Portal and requires supporting documentation, including payroll reports for federal compliance.
Dnr900200 Oil And Gas Dnrfra

POSTED

7 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS