Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Wisconsin was posted on April 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

8827 - Annual Horizontal Sawcutting Concrete Sidewalk and Incidental Work (Districts 2 and 6)

Closed
State & Local
Submission Closed
Solicitation #
8827

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
International
EN27NAN619 South Island Forest District Road & Bridge Maintenance
Solicitation # EN27NAN619
The EN27NAN619 contract is a general works agreement issued by the Ministry of Forests for the South Island Forest District in British Columbia, Canada. The scope of work involves routine maintenance, road reactivation, and repairs of Forest Service roads, bridges, and culverts, including the installation of major culverts and bridges and a 24-hour emergency response requirement for storm damage. The contractor is responsible for providing all necessary manpower, equipment, accommodations, and transportation, with specific work assignments managed by a Ministry Representative. The agreement is dated for reference January 11, 2027, and contracts are awarded on an annual basis. The contract is awarded to the lowest compliant bidder, with ties resolved via a draw using Random.org. Bidders must be eligible to work in Canada and must be certified in the BC Forest Safety Council SAFE Company program. Evaluation factors include total bid price, compliance, and a review of business organization, qualifications, and experience. Financial security requirements include a performance bond and a labour and material payment bond, each valued at at least 50% of the total contract price. Payment is processed through monthly applications certified by the Ministry Representative. There is no specified set-aside status for this solicitation.
Ministry of Forests

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT
Solicitation # MCP 2026-07
The MCP 2026-07 Cascade Canyon Trail Bridge Project is a construction solicitation issued by the Marin County Open Space District for improvements at the Cascade Canyon Open Space Preserve in Fairfax, CA. The scope of work involves the installation of two clear-span steel bridges above the 100-year flood elevation of San Anselmo Creek, featuring a primary 90-foot long, 6-foot wide prefabricated weathered steel connector style truss bridge with a redwood deck and a second 60-foot bridge located approximately 1,000 feet upstream. Additional requirements include the construction of concrete spread footings, installation of engineered fill, repair of rock riprap slope protection, and the creation of compacted road and trail surfaces. The engineer's estimate for the project is $900,000, with a required completion date for all on-site construction by October 15, 2027. Bids are due by December 3, 2026, at 2:00 PM PST and must be submitted electronically via Bid Express or as sealed paper bids. To be considered responsible, bidders must demonstrate financial strength, provide a list of at least three similar or larger bridge projects, and have successfully completed at least five similar projects in the San Francisco Bay Area. The contract requires a bid bond of 10% of the total bid, as well as performance and payment bonds. Insurance requirements include $2,000,000 in Commercial General Liability and $1,000,000 in Automobile Liability. Contractors must adhere to California prevailing wage rates and submit a Subcontractor Debarment and Suspension Certification. There is no set-aside status for this solicitation.
County of Marin

POSTED

about 13 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract involves performing repair work primarily focused on horizontal sawcutting and grinding of concrete sidewalks in the 2nd and 6th Aldermanic Districts of Madison, Wisconsin. The contractor is tasked with eliminating trip hazards by sawcutting designated sidewalk locations marked in the field with specific identifiers. While an initial list of approved repair sites and area maps is provided, these locations are subject to change as additional sites may be added upon direction from the Common Council and the project engineer. This solicitation, titled "Annual Horizontal Sawcutting Concrete Sidewalk and Incidental Work (Districts 2 and 6)," was issued by the City of Madison and is open until the response deadline on April 23, 2026. The scope centers on ensuring pedestrian safety through targeted sidewalk maintenance, with work directed by city officials. The contract does not indicate any set-asides or specific certifications required, and the work is to be performed within the state of Wisconsin.

General Info

Perform horizontal sawcutting and grinding to remove sidewalk trip hazards in Madison Districts 2 and 6.

Place of Performance

WI, USA

Set-Aside

small_business

Documents

8
PDF, High priority: read this firstbid-bond
High
DOC, High priority: read this firstbidder-acknowledgement
High
PDF, High priority: read this firstrfb
High
DOC, High priority: read this firstinstructions
High
DOC, High priority: read this firstcontract-document
High
DOC, High priority: read this firstsbe-compliance-report
High
PDF, Low priorityplan-holder-list
Low
DOC, Low prioritysbe-contact-report
Low

Read all 8 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 3 days
  • North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 18 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWisconsin → City of Madison
ContactsNo contacts available
OfficeN/A
Organization / AgencyWisconsin → City of Madison
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Contractor shall perform repair work primarily throughout the 2nd and 6th Aldermanic Districts. A list of approved repair locations and an area map of Aldermanic District 2 and 6 has been provided within these Special Provisions for reference. The list, however, is not a final list. Additional locations may be added. Horizontal sawcut/grind locations have been marked in the field with a pink line and a white “C”. The Contractor shall horizontally sawcut/grind sidewalk to eliminate trip hazards at those locations designated by the Common Council, and as directed by the Engineer.

More opportunities from Wisconsin → City of Madison

Same awarding agency

NAICS: 238210
SLED
9885 - Central Library Book Stack Lighting Retrofit
Solicitation # 9885
Contract 9885 is a solicitation issued by the City of Madison, Wisconsin, for the Central Library Book Stack Lighting Retrofit. The project involves replacing existing lighting systems in the book stack areas with LED lighting and Athena network lighting controls to improve illumination, reduce energy consumption, and lower maintenance costs. The scope includes all labor, materials, and equipment, as well as the management of construction and demolition waste in accordance with local ordinances. The contract is awarded as a lump sum to a single responsible bidder whose bid is below the City's established Construction Budget Dollar Value. The project requires an electrical contractor with at least five years of experience and the employment of a Master electrician. Performance timelines specify that work must be completed within three months of starting on site, with a final construction closeout required no later than eight months after the start work letter is issued. Bidders must provide a bid bond of 5% of the total bid and comply with Small Business Enterprise (SBE) goals or demonstrate a good faith effort to meet them. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination clauses. There is no specified set-aside status for this contract.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

16 days ago

DEADLINE

in 19 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS