Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 16, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

94--RipRap for LD5A

Awarded
W912ES-15-T-0023Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract, issued by the Department of Defense through the W07V Endist St Paul, requires the supply and delivery of Class 5, B-2 Bedding, and riprap to Lock and Dam 5A. The materials must be durable quarried stone suitable for the Upper Mississippi River environment, meeting specific gravity requirements between 2.55 and 2.75 and adhering to strict gradation and shape standards. Class 5 materials must specifically conform to MNDOT specifications. Payment is based on the ton of acceptable material delivered, with strict measurement protocols requiring the use of approved, tested scales. The contractor is responsible for providing certified delivery tickets for every load and must use tandem dump trucks with a minimum 18 ton capacity for on-site stockpiling. Coordination with the Acting Chief of Maintenance and Repair is required to ensure loading docks and access routes remain unobstructed during execution.

General Info

Contract Value

$11,370.28

NAICS

212312 - Crushed and Broken Limestone Mining and Quarrying

Place of Performance

MN, USA

Set-Aside

NONE

Award Issued Date

Documents

4

15-T-0023.pdf

PDF

B2_Bedding.pdf

PDF

R45_Rip_Rap_.pdf

PDF

R80Rip_Rap_.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline time changed from 5:00 AM UTC to 4:00 PM UTC on Dec 11, 2014. The point of contact changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts2 people available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA
Contacts

Full Description

Show more
TABLE OF CONTENTS PARAGRAPH DESCRIPTION PART 1 GENERAL 1.1 SCOPE 1.2 RELATED WORK OF OTHER SECTIONS (Not Applicable) 1.3 APPLICABLE PUBLICATIONS 1.4 MEASUREMENT AND PAYMENT PART 2 PRODUCTS 2.1 MATERIALS PART 3 EXECUTION 3.1 COORDINATION 3.2 DELIVERY 3.3 QUALITY CONTROL LOCKS AND DAMS ROCK SUPPLY CONTRACT SCOPE OF WORK 1. GENERAL. 1.1 SCOPE. This project involves the work necessary to supply and deliver Class 5, B-2 Bedding, and riprap to Lock and Dam 5A. 1.2 RELATED WORK OF OTHER SECTIONS (Not Applicable). 1.3 MEASUREMENT AND PAYMENT. 1.3.1 Measurement. Riprap shall be weighed on accurate, approved scales furnished or made available by the Contractor. Before being approved for use, the scales shall have been tested by the Department of Weights and Measures or by a reliable scale servicing company so as to operate within a degree of error not greater than 1 percent and to be sensitive to a change in load of 1/5 of 1 percent, both percentages being based on the total required weight of material normally weighed as a unit on the scale. Scales shall be spot checked for accuracy and sensitivity as often as directed by the Contracting Officer during stone delivery. When materials are weighed in hauling vehicles, gross weights shall be checked and the vehicle tare weight determined as often as the Contracting Officer directs. The Contractor shall furnish such weights, accessories, and assistance as the Contracting Officer may require for conducting weighing equipment tests. 1.3.1.1 Weighing operations shall be performed, as approved, in the presence of a representative of the Contracting Officer, unless waived. Each load shall be accompanied by duplicate copies of delivery tickets certified by the weighmaster. As a minimum, each ticket shall contain the following information: (1) Date and time. (2) Vehicle Number. (3) Gross Weight. (4) Vehicle tare weight. (5) Net weight of riprap. (6) Material weighed (description of load contents). (7) Signature of weighmaster. Delivery tickets shall be collected by the Contractor, and one copy thereof shall be furnished to the Contracting Officer at the close of each day's operations. 1.3.2. Payment. All material shall be measured and paid for by the ton (2,000 pound avoirdupois) of acceptable material delivered as specified to the designated delivery sites. 2. PRODUCTS. 2.1 MATERIALS. 2.1.1 Riprap/B-2 material shall be durable quarried stone of suitable quality to ensure permanence in the Upper Mississippi River environment. Stone shall be free from cracks, seams and other defects that would unduly increase its deterioration from natural causes. 2.1.2 Specific gravity. All stone shall have a specific gravity of not less than 2.55 and not more than 2.75. 2.1.3 Riprap Shape. Neither the breadth nor thickness of any individual stone shall be less than one third its length. 2.1.4 Gradations. Riprap and B-2 bedding shall be reasonably well graded within the specified limits shown on the gradation curves. Inclusion of objectionable quantities of dirt, sand, clay, rock fines or other deleterious materials will not be allowed. Class 5 shall conform to MNDOT Class 5 specifications. 3. EXECUTION. 3.1 COORDINATION. The Contractor shall not block access to the loading docks or access routes at the on-land delivery sites for extended periods of time and shall coordinate loading access routes and dock use with the following: Acting Chief Maintenance & Repair: Mr. Scott Uhl Fountain City, WI Phone number: +1 (555) 000-0000 3.2 DELIVERY AND BARGE LOADING. Delivery of riprap by the Contractor shall include placing material directly from trucks into a stockpile area on site. The Contractor shall provide all other equipment and personnel needed to place the stone into stockpiles on site, except that no secondary loading/movement of riprap will be required after the riprap has been dumped from the trucks. A representative of the Contracting Officer will direct the Contractor where to unload materials. 3.2.1 Loading Riprap. Trucks used by the Contractor for loading riprap onto stockpiles shall be tandem dump trucks with a minimum 18 ton capacity; use of end-dump trailers or belly-dump trailers will not be allowed. 3.3 QUALITY CONTROL. The Contractor shall establish and maintain quality control and shall maintain records of the quality control for work under this section to ensure compliance with contract requirements. * * * * *

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

about 18 hours ago

DEADLINE

in 11 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

about 18 hours ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS