Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Wisconsin was posted on April 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

9780 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2026

Closed
State & Local
Submission Closed
Solicitation #
9780

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Federal
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. has issued an invitation to bid for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A (Contract K-27-2470-DBB-3-C) for the City of San Diego. This project is funded by CASRF and the EPA and is subject to a Project Labor Agreement. The scope of work encompasses a wide range of civil and infrastructure services, including aggregate and pipe supply, asphalt paving, electrical work, fencing, geotextile supply, hydroseding, landscape and irrigation, minor concrete, QC testing, ready mix concrete supply, street sweeping, striping, survey, and water truck services. The contract is set aside for SBA certified Women-Owned Small Businesses (WOSB) and Disadvantaged Business Enterprises (DBE) through the Department of Transportation. Subcontractors must possess a valid California contractor license and be registered with the California Department of Industrial Relations per Public Contract Code Section I725.5. Bids must remain valid for 120 days from the submission date. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100% of the contract value, with bond premium reimbursement capped at 3%. Interested parties should submit quotes via email to Veronica Garcia at [email hidden] or via fax. The response deadline is December 3, 2026.
Flatiron Dragados Constructors, Inc.

POSTED

35 minutes ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The contract involves the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines with diameters ranging from 8 to 10 inches. The rehabilitation process will utilize an Ultraviolet light cure Cured-In-Place Pipe (CIPP) system, which provides a trenchless method for pipe repair, minimizing surface disruption. This work is identified as Phase 1 of the CIPP UV Lining Rehabilitation of Sewers project, scheduled for 2026. Issued by the City of Madison, Wisconsin, the solicitation was posted on April 3, 2026, with a response deadline of April 23, 2026. The contract falls under the State, Local, and Education (SLED) organizational category and does not specify any set-aside types or NAICS codes. The project emphasizes efficient sewer pipeline rehabilitation through advanced UV curing technology, supporting infrastructure integrity while reducing excavation impacts.

General Info

Trenchless UV CIPP rehabilitation of 11,859 feet sewer pipelines, Phase 1, by City of Madison 2026.

Documents

9
DOC, High priority: read this firstbidder-acknowledgement
High
PDF, High priority: read this firstrfb
High
DOC, High priority: read this firstinstructions
High
DOC, High priority: read this firstcontract-document
High
DOC, High priority: read this firstsbe-compliance-report
High
PDF, Low priorityplan-holder-list
Low
DOC, Low prioritysbe-contact-report
Low
PDF
PDF

Read all 9 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 8 days
  • Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 18 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWisconsin → City of Madison
ContactsNo contacts available
OfficeN/A
Organization / AgencyWisconsin → City of Madison
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This contract shall include the trenchless rehabilitation of approximately 11,859 linear feet of sanitary sewer pipelines ranging in size from 8” to 10” diameter. The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system.

More opportunities from Wisconsin → City of Madison

Same awarding agency

NAICS: 238210
SLED
9885 - Central Library Book Stack Lighting Retrofit
Solicitation # 9885
Contract 9885 is a solicitation issued by the City of Madison, Wisconsin, for the Central Library Book Stack Lighting Retrofit. The project involves replacing existing lighting systems in the book stack areas with LED lighting and Athena network lighting controls to improve illumination, reduce energy consumption, and lower maintenance costs. The scope includes all labor, materials, and equipment, as well as the management of construction and demolition waste in accordance with local ordinances. The contract is awarded as a lump sum to a single responsible bidder whose bid is below the City's established Construction Budget Dollar Value. The project requires an electrical contractor with at least five years of experience and the employment of a Master electrician. Performance timelines specify that work must be completed within three months of starting on site, with a final construction closeout required no later than eight months after the start work letter is issued. Bidders must provide a bid bond of 5% of the total bid and comply with Small Business Enterprise (SBE) goals or demonstrate a good faith effort to meet them. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination clauses. There is no specified set-aside status for this contract.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

14 days ago

DEADLINE

in 21 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS