Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on August 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ADA Accessibility Specialist

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP #27-035 Hydraulic Modeling & system Analysis Program
Solicitation # 27-035
The City of Albany, Georgia, is soliciting competitive sealed proposals under RFP #27-035 for a qualified firm to develop and implement a comprehensive hydraulic modeling and system analysis program for its water distribution system. The primary objective is to create a fully functional model that the City can maintain internally for operations, planning, and emergency response without ongoing consultant reliance. The scope includes system analysis for pressures, fire flow, storage, pumping, outages, future growth, and capital improvement planning. To ensure platform independence, the final model must be delivered in its native software format as well as an EPANET-compatible format. Proposals must be submitted by 5:00 PM on November 23, 2026, to the Procurement Division in Albany, Georgia. Submissions must include one original and six copies on company letterhead, signed by an authorized official, and accompanied by a Certificate of Non-Collusion, a Governing Law and Venue form, and an Addendum Acknowledgement Form. Award will be based on a weighted evaluation of experience and qualifications (35%), project approach and understanding (30%), references and portfolio (25%), and a detailed fee proposal (10%). The selected contractor must maintain liability insurance of at least $1,000,000 per occurrence and $2,000,000 annual aggregate, as well as workers compensation and employers liability of at least $1,000,000. Compliance with the Georgia Security and Immigration Compliance Act and the Federal Work Authorization Program is required. Payment terms are Net 30, and the contract is subject to multi-year contract clauses pursuant to OCGA 36-60-13. All equipment provided must be the latest model and composed of new parts, with the City reserving the right to reject any materials that do not meet specifications.
City of Albany

POSTED

about 5 hours ago

DEADLINE

in 26 days
NAICS: 541330
New
SLED
ON-CALL STRUCTURAL ENGINEERING SERVICES
Solicitation # 26/27-15
The Town of Manchester, Connecticut, is soliciting proposals for on-call structural engineering services to support the review, analysis, inspection, and design of municipal infrastructure on an as-needed basis. The scope of work includes preparing structural calculations for traffic control signals and light-pole loading, designing foundations and retaining walls, and performing inspections of mast arms and span poles. All work must be supervised by a Professional Engineer licensed in the State of Connecticut. The contract is expected to begin in November 2026 and run through December 31, 2027, with options for three additional one-year extensions. Annual price adjustments will be based on the U.S. Bureau of Labor Statistics Consumer Price Index. Proposals are due by November 5, 2026, and will be evaluated using a points-based system focusing on demonstrated experience (30%), hourly pricing (30%), the quality and thoroughness of the proposal (20%), and the qualifications of key personnel (20%). The Town reserves the right to shortlist firms for interviews and negotiate final terms. Required submission documents include a current IRS Form W-9, FEIN/EIN, SAM number, and a Living Wage Certification. Under the Manchester Living Wage Ordinance, covered employers with contracts valued at $25,000 or more per fiscal year must pay eligible employees either $18.25 per hour with health benefits or $26.70 per hour without. Additionally, contractors must maintain insurance from an A.M. Best rated A-/VIII company, naming the Town as an additional insured.
Engineering

POSTED

about 5 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The ADA Accessibility Specialist subcontract involves performing accessibility audits for prime contractors on tenant improvement projects for the Santa Fe Irrigation District in Solana Beach, California. The selected specialist will be responsible for reviewing design documents for ADA compliance and conducting physical inspections of installed improvements using specialized measurement tools to ensure all accessibility requirements are satisfied. A mandatory requirement for this role is the Certified Access Specialist (CASp) certification. The contractor is expected to deliver comprehensive ADA compliance reports and formal certifications of accessibility. This opportunity was posted on August 25, 2026, with a response deadline of September 18, 2026, under NAICS code 541330.

General Info

CASp certified specialist to perform ADA audits and inspections for Santa Fe Irrigation.

Place of Performance

Solana Beach, CA, 92075, USA

Set-Aside

NONE

Documents

This scope was carved out of J-2600.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Bridging Documents And Owner's Representative Services Design-Build Tenant Improvement Project For 140 Marine View Ave., Solana Beach CA

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Fe Irrigation District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs accessibility audits for prime contractors on Santa Fe Irrigation District tenant improvement projects. Reviews design documents for ADA compliance and inspects installed improvements using ADA measurement tools to ensure accessibility requirements are met. Requires CASp (Certified Access Specialist) certification. Delivers ADA compliance reports and certification of accessibility.

More opportunities from California → Santa Fe Irrigation District

Same awarding agency

NAICS: 541330
New
SLED
Replacement/Refurbishment Of Two Above Ground Pipeline Bridge Crossings Project
Solicitation # J-2700
The Santa Fe Irrigation District (SFID) is soliciting professional engineering design services for Project J-2700, which involves the replacement or refurbishment of two above-ground pipeline bridge crossings in Rancho Santa Fe, California. The project focuses on a 12-inch diameter pipeline installed in 1977 and an 18-inch diameter pipeline installed in 1982. The primary objectives are to assess structural and seismic adequacy according to current standards, estimate the remaining useful life of the infrastructure, determine necessary improvements for seismic reliability, and identify all permitting requirements, including CEQA compliance. Key deliverables include a Determination of Required Improvements Memorandum and a Preliminary Design Report featuring technical specifications, cost estimates, and construction schedules. This is a time-and-materials contract with an expected performance duration of approximately 20 weeks. Selection is based on a most-qualified process, where SFID will rank firms and negotiate a fair and reasonable compensation package. Proposals must be submitted as a searchable PDF and are limited to 40 pages, excluding resumes, references, and fee proposals. Technical requirements specify that all welding must be coated with electrolytic resin and steel casing or exposed ductile iron pipe must be painted purple per WAS specifications. Additionally, the selected consultant must comply with California Prevailing Wage Laws and adhere to NCTD safety requirements for any personnel entering the railroad right-of-way. Invoicing occurs on a monthly cycle and must be accompanied by detailed progress reports.
Engineering Services

POSTED

5 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS