Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ADA-Compliant Architectural Finishes and Fixtures

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238350
New
SLED
Copernicus Hall 5th Floor Door Replacement Project
Solicitation # 2027 03
Central Connecticut State University is soliciting bids for the Copernicus Hall 5th Floor Door Replacement Project (Solicitation 2027-03). The scope of work involves the removal and replacement of existing doors and hardware on the fifth floor, primarily utilizing solid core prefinished wood doors and some hollow metal doors. The contractor is responsible for preparing and painting associated door frames, adhering to NFPA 80, NFPA 101, and NFPA 105 fire and life safety standards, and ensuring compliance with ADA and ICC A117.1 accessibility requirements. A critical component of the project includes the specialized removal and plastic-wrapping of asbestos-containing material (ACM) door panels for disposal. The project is targeted for completion during Spring Break 2027, from March 15th to 21st, though work may be scheduled during Winter Break or off-hours. Bids are due by December 10, 2026, and must be submitted as a lump sum and include a 10% bid bond. Awarding will be based on the lowest responsible qualified bidder, with evaluations considering past performance, integrity, and commitment to affirmative action and minority business enterprise goals. Contractors must adhere to Connecticut prevailing wage rates, provide a current certificate of insurance naming CCSU as additionally insured, and ensure all workers are OSHA safety trained. Key logistics include delivering all locksets to the CCSU Locksmith at least two weeks prior to installation and submitting a detailed replacement schedule to ensure rooms remain secure daily.
DAS Procurement

POSTED

1 day ago

DEADLINE

in 28 days

AI Contract Overview

Show more

The contract seeks the installation of ADA-compliant architectural features including doors, ramps, restrooms, signage, and other structural elements to ensure full accessibility in alignment with federal civil rights standards. The work is specifically targeted toward facilities within the Rancho Santiago Community College District, with performance required at a location in Orange, California, ZIP code 92869. This subcontract is classified under NAICS code 238350, which pertains to plumbing, heating, and air-conditioning contractors, indicating the scope involves specialized building systems and finishes that integrate with existing infrastructure. The solicitation was posted on July 29, 2026, with responses due by August 12, 2026, at 9:00 PM Pacific Time, leaving a limited window for qualified subcontractors to submit proposals. While no set-aside designation is specified, the project emphasizes compliance with accessibility laws and requires precise execution to meet regulatory requirements for public educational facilities.

General Info

Install ADA-compliant architectural features at Rancho Santiago Community College District in Orange, CA, by August 12, 2026.

Place of Performance

Orange, CA, 92869, USA

Set-Aside

NONE

Documents

This scope was carved out of 1503.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Science Center Compressor Replacement Project At Santiago Canyon College

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Rancho Santiago Community College District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of ADA-compliant doors, ramps, restrooms, signage, and architectural elements to meet civil rights accessibility standards.

More opportunities from California → Rancho Santiago Community College District

Same awarding agency

NAICS: 238210
SLED
District-Wide Uninterrupted Power Supplies (UPS) Preventative Maintenance Services
Solicitation # 2627-413
The Rancho Santiago Community College District is soliciting proposals under RFQ/RFP #2627-413 for district-wide uninterrupted power supplies (UPS) preventative maintenance and repair services. The selected contractor will be responsible for maintaining the UPS equipment that supports the district's data and communications infrastructure across various data centers, including locations at Santiago Canyon College. The scope of work includes performing maintenance at manufacturer-recommended intervals and adhering to NFPA 70B and NFPA 70E standards. Key deliverables include NFPA 70B Electrical Maintenance Certificates, Battery Health and Conductance Logs, and detailed repair logs provided within three business days of service completion. The contract is structured over a five-year period, beginning with a five-month initial term from February 1, 2027, to June 30, 2027, followed by four full twelve-month annual terms ending June 30, 2031. Maintenance services are invoiced in monthly installments, while repair services are billed separately and must be submitted within sixty days of completion. Award decisions are based on a scoring system by a Selection Committee, with the top three respondents invited for interviews. Compliance requirements are extensive, including the submission of a Labor and Material Payment Bond, prevailing wage certifications under Labor Code §1771, and various certifications regarding drug-free workplaces and background investigations. The district emphasizes socioeconomic goals, targeting 3% participation for Disabled Veterans Business Enterprises (DVBE), 50% for local hires, and 25% for local businesses. Proposals must be submitted in PDF format to [email hidden] by December 1, 2026, at 2:00 PM.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

8 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS