ADA Ramp
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This project involves the removal of an existing ramp and handrail and the installation of a new ADA-compliant ramp at a 1,800-square-foot pier and beam frame home. The new structure will be approximately 26 feet long and must be constructed using ground contact treated lumber and treated deck screws, with all framing, supports, and decking utilizing 2x6 materials. The design requires handrails on both sides with spindles spaced 4 inches apart, and the ramp will transition from a concrete porch to a new 4-inch thick concrete pad at the base. Due to potential clearance issues under a covered porch, the ramp may need to run along the side of the house before turning toward a flat landing. All work must meet or exceed 2019 IRC standards, and the contractor is responsible for obtaining all necessary permits, performing line locates, and managing the removal of all waste to return the yard to a mowable condition. Prospective contractors are strictly required to visit the project site in McAlester before submitting a bid, as change orders for conditions identifiable during a site visit will not be approved. The selected contractor will be responsible for all final measurements and material counts, while the homeowner or property manager will select all colors used for the project.
General Info
Agency
NAICS
Place of Performance
McAlester, OK, 74501, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Special Instructions: Home is a 3-bed, 2 bath pier and beam frame home approx. 1800 sq. ft. All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. Any questions please contact (Case Manager) Andrea Strawn at 580-642-6369 or (Inspector) Kevin Mings at 580-317-3244
Rough Carpentry: Remove existing ramp and handrail and install a new ADA ramp to ADA Specs with handrails on each side, part of the ramp will sit on the concrete porch, anchor the post to the concrete, the other post will be concreted in the ground a min. of 2' deep, the post will be 5' OC, the framing, supports, and deck material will be 2"x6", handrails are to have spindles 4" OC, the end of the ramp is to set on a concrete pad the width of the ramp and 3' out in front of the ramp, the concrete is to be a min. of 4" thick with all needed steel and finished at ground level. Use only treated deck screws and ground contact treated lumber for the construction of the ramp. Ramp will be APPROX. 26' long. Ramp may have to run along the side of the house underneath the covered porch for a little way to a flat landing then turn out because of the head clearance of the porch.
Special Instructions: All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed.