This Solicitation opportunity from Georgia was posted on June 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Advertisement for Bid
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the comprehensive construction of various water and sewer infrastructure components, including 4,700 linear feet of 16-inch ductile iron pipe water main, 940 linear feet of 16-inch steel water main to be installed on a bridge, and 1,180 linear feet of 12-inch HDPE sanitary sewer force main. Additionally, it covers the installation of 1,040 linear feet of 16-inch HDPE casing for the force main, 266 linear feet of 24-inch steel casing with a 0.250-inch wall thickness through open cut methods, and 40 linear feet of 24-inch steel casing with a 0.375-inch wall thickness using jack and bore techniques. The project requires all necessary materials, labor, tools, equipment, and incidentals to complete these installations, emphasizing both open cut and trenchless methods such as jack and bore. The solicitation for this project was posted by the Cherokee County Water and Sewerage Authority in Georgia, with a response deadline of July 11, 2025. The project’s estimated value ranges from 1.5 million to 3 million dollars. Interested contractors can contact PE Robert Bartlett via email or phone for further details. The project aims to enhance water and sewer infrastructure, ensuring reliable service and accommodating future growth within the county.
General Info
Place of Performance
GA, USASet-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
4,700 LF of 16¿ DIP Water Main 940 LF of 16¿ Steel Water Main (To Be Hung on Bridge) 1,180 LF of 12¿ HDPE Sanitary Sewer Force Main 1,040 LF of 16¿ HDPE Casing for 12¿ FM (To Be Hung On Bridge) 266 LF of 24¿ Steel Casing (0.250¿ WT) (Open Cut Installation) 40 LF of 24¿ Steel Casing (0.375¿ WT) (Jack and Bore Installation)
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
