Aera San Ardo Two (2) Wells Administrative Grouping

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Aera San Ardo Two Wells Administrative Grouping project involves the sidetracking of two existing wells, Orradre 1614-12 and Orradre 1528H-12, located in the San Ardo Oil Field in Monterey County, California. Managed by the California Department of Conservation, Geologic Energy Management Division, the primary objective is to support continued oil and gas resource development by drilling new wellbores from existing ones to restore functionality or access remaining hydrocarbons. The project is classified under NAICS code 213111 and is exempt from full environmental review under the California Environmental Quality Act, citing categorical exemptions for existing facilities, replacement or reconstruction, and minor land alterations. The scope of work is limited to existing areas of disturbance, with no expansion of well pads, roads, staging areas, or pipelines, and no changes to surface topography or drainage patterns. Each well is expected to take approximately 17 operational days to complete all construction phases. Site activities are restricted to the existing 20,000 square foot well pads per well, with routine maintenance consisting of weed and ruderal vegetation removal for fire control and road upkeep. The project was certified on July 20, 2026, with primary coordination handled by the Associate Oil and Gas Engineer from the Department of Conservation and representatives from Aera Energy LLC.

General Info

Aera Energy to sidetrack two wells in San Ardo Field within existing pad footprints, no new grading or expansion, 17 days per well.

Agency

California Conservation, Department of

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Michael CannonAssociate Oil & Gas Engineer

Full Description

Show more
The primary work objective is to sidetrack two (2) existing wells. This work is designed to support continuation of oil and gas resource development in the area. The wells are not being sidetracked (i) for abandonment purposes only or (ii) in connection with an enforcement order to mitigate or prevent environmental damage or surface expression. Sidetracking is the process of drilling a new wellbore from an existing wellbore. This is typically done when the original wellbore encounters a problem, when accessing remaining hydrocarbons within portions of the same reservoir, or when obstructions in the wellbore need to be bypassed. This process allows drilling a new section in an existing wellbore in the same rock formation restoring the well’s original functionality. The potential disturbance footprint would encompass an existing 20,000 square foot (100 ft x 200 ft) well pad per well. The entirety of this work would be located in an area of existing disturbance and no change in the surface topography (such as drainage patterns) would result. There will be no expansion of the existing well pads, roads, staging areas, or pipelines. No new grading would occur in any undisturbed areas. No new road construction or expansions would be required for the proposed project. Routine maintenance activities at the site would include removal of weeds and other ruderal vegetation for fire control and road maintenance. For a single well, it is expected to take approximately 17 operational days to complete all construction phases. The proposed project consists of the California Department of Conservation, Geologic Energy Management Division (CalGEM) approving 2 permit(s) for Aera Energy LLC to sidetrack the well(s) listed below, in the San Ardo Oil Field. (0405322272: Orradre 1614-12 & 0405322013: Orradre 1528H-12)

Similar Contracts

Same NAICS industry code

NAICS: 213111
New
SLED
ODNR, Division of Oil & Gas – OWP – Federal Project –Scioto 3F - 2 Wells
Solicitation # SRC0000042633
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for the Scioto 3F Project to plug and plate two orphan wells, Oertels Corner #1 and Romanello #1, located in Jefferson Township, Scioto County. The scope of work encompasses mobilization, well site development, drilling or cleaning out and plugging of the wells, decommissioning and disposal of all casing and production equipment, and full restoration of disturbed areas. Key technical deliverables include the installation of cement plugs from 210 feet to within 30 inches of ground level and the maintenance of strict well control throughout the process. Work must be performed in accordance with Ohio Revised Code 1509 and Ohio Administrative Code Chapters 1501:9-11 and 1501:9-12. As a federally funded project, contractors must comply with Davis-Bacon prevailing wage requirements and Buy America sourcing mandates for iron, steel, and manufactured construction materials. Eligible bidders must be active on CSP900922 (DAS Index No. MAC110), attend the mandatory pre-bid meeting on November 4, 2026, and be in good standing with the agency. The contract will be awarded to the lowest responsive and responsible bidder based on submissions via OhioBuys. Performance must begin within three months of the contract end date and be completed by May 1, 2027, or five months after the effective date, whichever is sooner. Invoicing is managed through the Orphan Well Project Management Contractor Portal and requires supporting documentation, including payroll reports for federal compliance.
Dnr900200 Oil And Gas Dnrfra

POSTED

5 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS