Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 2, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

AERIAL VEGETATION CONTROL SPRAYING BY HELICOPTER

Awarded
W9128F20R0057Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115112
New
SLED
AS27-123 Central Utah Aerial Seeding Project Phase 1 - 2026
Solicitation # AS27-123
The State of Utah Division of Purchasing and the Division of Wildlife Resources are seeking a single contract award for the Central Utah Aerial Seeding Project Phase 1 - 2026. This Invitation for Bids aims to secure a responsive and responsible vendor to perform aerial seeding across three specific project areas: the Widemouth 2 Fire Rehab Project Phase I (3,964 acres), the Watts Mtn Phase II Project (2,210 acres), and the Tower Fire Aerial Seeding Project (206 acres), totaling 6,380 acres. The performance period is strictly scheduled from November 4, 2026, through November 16, 2026. Bids must be submitted on a cost-per-acre basis, and the award will be granted to the lowest total cost responsive and responsible vendor. Technical requirements mandate that aircraft be equipped with GPS for 100% coverage and maintain a maximum 80-foot seeding swath width to prevent stripping. The use of drones is strictly prohibited, and operations must be postponed if wind speeds exceed 10 miles per hour. Upon completion, the contractor must provide electronic coverage documentation in UTM projection North America Datum 1983. The contractor is responsible for securing flight operations from airports in Redmond, Fillmore, or Richfield, Utah. Administrative requirements include maintaining Commercial General Liability insurance with limits of $1 million per occurrence and $3 million aggregate, as well as statutory Workers' Compensation. Vendors must certify compliance with E-Verify, anti-boycott laws regarding the State of Israel, and various non-discrimination statutes. Invoices must be submitted within 30 days of delivery and will be paid within 30 days of receipt of a correct invoice. The State Entity reserves the right to inspect deliverables within 30 days of delivery to ensure conformity with the specified standards before final acceptance.
Utah

POSTED

5 days ago

DEADLINE

in 5 days
NAICS: 115112
New
SLED
Cherry Fire Aerial Seeding
Solicitation # CS27-114
The State of Utah Division of Purchasing, on behalf of the Division of Wildlife Resources, is soliciting quotes for aerial seeding services for the Cherry Fire project in Tooele County. The scope of work involves the application of a seed mix consisting of grasses, shrubs, and forbs across 4,651 total acres at elevations between 5,700 and 6,700 feet. Specifically, the contractor must apply seed at a rate of 12 lbs/acre over 704 acres of TLA lands and 18 lbs/acre over 3,947 acres of private lands. All work must be completed by November 11, 2026. Technical requirements include the use of GPS technology to ensure 100% coverage and a requirement to begin seeding by 8:00 a.m. to minimize drift, with the government reserving the right to postpone operations if wind speeds exceed 10 miles per hour. The contract will be awarded to the responsive and responsible vendor submitting the lowest cost, with bids required on a cost-per-acre basis. Selected vendors must maintain Commercial General Liability insurance of at least $1 million per occurrence and $3 million aggregate, as well as statutory Workers' Compensation insurance. Administrative terms specify that deliveries are F.O.B. Destination Freight Prepaid and Allowed, with a 30-day window for the state to accept or reject deliverables. Invoices must be submitted within 30 days of delivery, and payments are due within 30 days of invoice execution. Contractors must also comply with the Utah Government Data Privacy Act and certify compliance regarding anti-boycott actions, forced labor restrictions, and E-Verify registration for personnel employed in Utah.
Utah

POSTED

6 days ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Fort Randall Generator Step-Up Transformer Install project involves the installation of four supplied GSU transformers, consisting of one three-phase 13.8/115 kV unit and three three-phase 13.8/230 kV units, at the Fort Randall Dam in South Dakota. The scope of work includes redesigning the 15kV bus and bus structures, replacing high voltage takeoff towers to transition from a three single-phase to a single three-phase transformer configuration, and modifying associated power, control, and protection systems. Additionally, the contractor must implement appropriate fire protection and oil containment measures. The project is expected to be completed within 985 days after the Notice to Proceed, with work scheduled across two specified outage periods. Managed by the Department of Defense through the US Army Corps of Engineers, the project is identified under solicitation number W9128F21R0004 and primary NAICS code 237130 for Power and Communication Line and Related Structures Construction. The procurement process included a virtual Industry Day on April 27, 2020, to gather technical feedback on project specifications and bus duct enclosure roof repairs. Technical requirements are detailed through comprehensive contract drawings and specifications covering concrete, metals, electrical work, earthwork, and utilities, including specific cable schedules and underground control conduit layouts.

General Info

Contract Value

$0

NAICS

115112 - Soil Preparation, Planting, and Cultivating

Place of Performance

NE, USA

Set-Aside

SBA

Award Issued Date

Documents

8

Fort Randall GSU Transformer Install Contract Drawings

PDF, High priority: read this firstspecifications
High

Ft Randall GSU Transformer Install Contract Drawings

PDF, High priority: read this firstspecifications
High

Ft Randall GSU Transformer Install Reference Drawings

PDF, High priority: read this firstspecifications
High

GSU Transformer Install (FY21) Ft Randall Dam, SD - Specifications

PDF, High priority: read this firstspecifications
High

Fort Randall GSU Install Industry Day Questions

DOCX, Low priorityindustry-day
Low

Fort Randall Industry Day Sign-In Sheet - GSU Transformer Install Project

PDF, Low priorityindustry-day
Low

20200423+Ft+Randall+GSU+Industry+Day+Presentation+27+Apr+20.pptx

ZIP

Ft+Randall+GSU+Transformer+Install+Reference+Drawings+2of2+-+Industry+Day+20200420.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

special-notice

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts2 people available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA

Full Description

Show more
SPECIAL NOTICE INDUSTRY DAY FOR GENERATOR STEP-UP (GSU) TRANSFORMER INSTALL AT FORT RANDALL DAM, SD On 27 April 2020, from 10:00 - 11:30 CST, the Government will conduct a VIRTUAL Industry Day for the Ft Randall Generator Step-Up (GSU) Transformer Install project. This notice does not constitute a solicitation. This announcement and the Industry Day event are for planning purposes only. Response to this notice is strictly voluntary. The Government will not reimburse any participating party for costs incurred for participation in or marketing efforts for this event. The intent of this Industry Day is twofold. First, to introduce the Fort Randall GSU Transformer Install project to industry. Second, to allow Industry the opportunity to provide feedback relating to the project specification package. In an effort to protect contractors and Government personnel, this Industry Day will be VIRTUAL and conducted via WebEx and phone in accordance with the instructions below. Industry Day agenda and presentation will be posted No Later Than 17 Apr 2020. DRAFT project specifications will be posted NLT 17 Apr 2020. Industry Day Information: VIRTUAL Industry Day will be hosted by Ron Beyer Monday, 27 April 2020 at 10:00 a.m. - 11:30 a.m. Central Daylight Time (US & Canada) ***Contractors shall contact Ron Beyer at contact@example.gov by 3:00pm CST on 24 April 2020 to confirm attendance to the Virtual Industry Day. *** To access the WebEx meeting room, from an Internet browser: https://usace.webex.com/meet/ronald.s.beyer Contractors must enter first and last name and email address, then select the Join Meeting button. For audio, join by phone: +1 (555) 000-0000 Access Code: 4600292 (followed by #) Security Code: 1234 (followed by #) Please use the - Call Me function if there are problems accessing the audio portion of the virtual site visit. Industry Questions and Comments: ALL inquiries and questions related to this Industry Day are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) three (3) days prior to the Industry Day. Project ID / Name: (461738) / Fort Randall GSU Transformer Install Solicitation Number: W9128F20R0057 Bidder Inquiry Key: RYQI76-7RB7P5 ***Bidder Inquiry Key has been updated.*** Project Description: Summary of Work: The work to be completed per this project is the installation of the supplied GSU transformers (one three-phase 13.8 / 115 kV, and three three-phase 13.8 / 230 kV), including modifications to the associated power, control and protection systems to accommodate the new GSUs. The GSU transformer 15kV bus and bus structures will also be redesigned and high voltage takeoff towers replaced to accommodate the single three-phase transformer versus the three single-phase transformer configuration. In addition, appropriate fire protection and oil containment measures will be incorporated in the transformer installation. The Contractor will be required to commence work upon receipt of contract award and complete the work in 985 days after receipt of Notice to Proceed. Work will take place over the two (2) outage periods specified in the solicitation. This information is subject to change and the final information will be listed within the solicitation. NAICS Code: The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 237130, Power and Communication Line and Related Structures Construction. Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via beta SAM (www.beta.sam.gov). Registration is required to access solicitation documents. Beta SAM provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments. ***Reference Solicitation Number is updated from W9128F20R0057 to W9128F21R0004**** *************************** Industry Day Call-in Information Ref: Industry Day Presentation 23 Apr 2020 Updated Presentation (Updated) Conference line: +1 (555) 000-0000 (Toll-Free) +1 (555) 000-0000 (US) Access Code: 4600292 Security Code: 1234 If there is an issue with a calling in, please use "call me" function within Webex or email contact@example.gov if you continue to have problems connecting. ****************************** *******Bidder Inquiry Key: RYQI76-7RB7P5 ***Bidder Inquiry Key has been updated.***

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

3 days ago

DEADLINE

in 16 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 23 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS