Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Aerospace Material and Long-Lead Parts Supply

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423840
New
SLED
Type 2 Safety Helmets and Accessories
Solicitation # 121597
Solicitation 121597 is issued by the Washington Suburban Sanitary Commission (WSSC Water) for the procurement of Type 2 Safety Helmets and accessories to support employee safety on construction and related job sites. The scope includes the supply of Type 2 Protective Helmets, XL Protective Helmets, MSA Visor Frames, and clear half-face spectacle goggles on an as-needed basis. All helmets must comply with ANSI/ISEA Z89.1 and EN 12492 standards, featuring a dielectric strength of 20,000 volts and an expiration date no sooner than five years from the date of receipt. The contract consists of a one-year base term with four optional one-year extensions, with deliveries required within 30 calendar days of an order. WSSC Water intends to make a single award to the lowest responsive and responsible bidder who meets all minimum qualifications, including being a manufacturer or authorized distributor. Evaluation may also consider prompt payment discounts of 15 days or more. Deliveries are F.O.B. destination to Commission facilities and must adhere to strict packaging and labeling requirements, including specific pallet dimensions and stock number markings. The contract includes a 12-month warranty from the date of acceptance, with payments processed via ACH or procurement credit card within 30 days of acceptance. Bidders must submit all required certifications, including non-discrimination and insurance forms, via the eProcurement portal by the November 19, 2026, deadline.
General Services Department

POSTED

1 day ago

DEADLINE

in 23 days

AI Contract Overview

Show more

This subcontract for Aerospace Material and Long-Lead Parts Supply supports prime contractors on DLA aircraft component contracts through the provision of certified raw materials and specialized components. The scope of work includes material forecasting and the procurement of precision-cast components, specialty seals, and certified aerospace alloys. The contract is managed by the Department of Defense under DLA Aviation At Huntsville and falls under NAICS code 423840. To ensure compliance and quality, the provider must adhere to AS9100 quality management standards and provide all necessary Mill Certs for the delivered materials. The response deadline for this opportunity is September 16, 2026.

General Info

DLA subcontract for aerospace materials and components, requiring AS9100 compliance by September 2026.

NAICS

423840 - Industrial Supplies Merchant Wholesalers

Place of Performance

0, OK, USA

Set-Aside

NONE

Documents

This scope was carved out of SPRRA126QA003.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

INDICATOR, CYLINDER

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Al DLA Aviation At Huntsville
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies raw materials and specialized long-lead components for prime contractors on DLA aircraft component contracts. Performs material forecasting and procurement of certified aerospace alloys, specialty seals, and precision-cast components. Requires AS9100 quality management standards and provision of Mill Certs. Delivers certified raw materials and long-lead components.

More opportunities from Department Of Defense → Al DLA Aviation At Huntsville

Same awarding agency

New
Federal
Multiple NSNs
Solicitation # SPRRA2-27-R-0800
The Defense Logistics Agency, based at Redstone Arsenal, Alabama, is conducting market research through a Sources Sought Synopsis to identify qualified manufacturing and supply sources for multiple items supporting the Patriot Weapons System. This effort, categorized under NAICS code 334412, specifically seeks sources for components such as refrigerator accumulators and circuit card assemblies. The acquisition is currently being processed under FAR 6.302-1(a)(2) due to a limited number of responsible sources, though the government is open to interest from various small business categories, including 8(a), Hubzone, Service-Disabled Veteran-Owned, and Women-Owned concerns. Prospective contractors must meet strict prequalification requirements, as the U.S. Army Combat Capabilities Development Command Aviation and Missile Center serves as the engineering source authority for approvals. Under AMRC Code 3C, parts must be acquired directly from the actual manufacturer to maintain quality. Awarded contractors will be responsible for all aspects of production, including supply chain management, material forecasting, obsolescence management, and both recurring and nonrecurring engineering services. This acquisition may involve classified requirements and technical data restricted by the Arms Export Control Act. This notice is for informational and planning purposes only and does not constitute a formal solicitation or a commitment to award a contract.

POSTED

about 13 hours ago

DEADLINE

in 15 days
View Details
NAICS: 336414
New
Federal
Sole Source to Raytheon | Ukraine PATRIOT Depot Test Equipment (DTE)
Solicitation # SPRRA2-27-R-SP03
The Defense Logistics Agency is conducting market research via a Sources Sought Synopsis to identify qualified manufacturers and suppliers to support the operational readiness of the Ukraine Phased Array Tracking Radar for Intercept on Target (PATRIOT) System. The requirement involves providing Depot Test Equipment (DTE), including PAT243 Oil Processing Stations, PAT24X High Voltage Power Supply Test Stations, CLET TS Cooler Liquid Electron Tube/Transmitter Pumping Unit Test Stations, CDU Testers, Raytheon Test Automatic Continuity Stations (RTACS), and PAO Processors. Additionally, the scope includes site surveys, installation, on-the-job training, installation kit electronic equipment, gold units or emulators, and a five-year supply of test station spares. The government intends to award this contract to Raytheon as the sole responsible source under FAR 6.302-1(a)(1). The selected contractor will be responsible for all recurring and nonrecurring engineering, supply chain management, logistics, and the procurement of long-lead parts. Performance timelines are measured in months after contract award, with site surveys due at 26 months and various hardware deliveries ranging from 31 to 50 months. Essential government furnished property, including a compliant facility and specific fluids such as PAO and EGW, will be provided to support installation and acceptance testing.
Guided Missile and Space Vehicle Manufacturing

POSTED

6 days ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS