Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on October 6, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

AFDM-10 (Resolute) Floating Dry Dock Request for Information (RFI)

Closed
N00024-22-L-4400Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
IFB 26-07 Ranger Shipyard Repairs
Solicitation # BD-27-1070-MMA01-PURCH-134561
Massachusetts Maritime Academy is soliciting bids under solicitation number BD-27-1070-MMA01-PURCH-134561 for the dry docking, related inspections, and repairs of the Training Vessel Ranger, a U.S.C.G. inspected school ship. The contractor is responsible for providing all necessary equipment, labor, parts, and materials. The project timeline requires the vessel to be available on December 11, 2026, with the haul-out occurring no later than December 18, 2026, and final completion by February 19, 2027. Core requirements include hauling, blocking, shoring, and relaunching the vessel, with the contractor maintaining the ship out of the water until all dry-dock items and the U.S. Coast Guard hull inspection are complete. Specific tasks include hull zinc replacement, painting of ground tackle and cleats, and rudder shaft packing inspection, with optional services available for cooling system coolant replacement, gunnel repairs, and main deck coating using International Interthane 990 deck red. The contract will be awarded to the responsive and responsible bidder providing the greatest overall value based on cost and evaluation criteria. To be considered responsive, bidders must submit a complete package including bidder information, tax compliance, non-collusion certification, debarment and suspension certification, a price proposal, and three institutional references. The vendor must comply with non-discrimination laws, conduct criminal background and sexual offender registry checks on all personnel, and indemnify the Academy against patent infringement and other damages. Records must be maintained for seven years following final payment. The Academy reserves the right to amend or terminate the contract with or without cause, and the vessel shall not be launched until authorized by an Academy representative.
MMA01 - Massachusetts Maritime Academy

POSTED

1 day ago

DEADLINE

in 14 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Everett, WA, 98207, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

10 updates
PhaseClosed
Posted

special-notice

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 8, 2022 to Jun 17, 2022. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Jun 17, 2022 to Jul 15, 2022.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jul 15, 2022 to Sep 30, 2022. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Sep 30, 2022 to Oct 31, 2022. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsea Hq
Contacts2 people available
OfficeWASHINGTON NAVY YARD, DC, 20376-5000, USA
Office AddressWASHINGTON NAVY YARD, DC, 20376-5000, USA
Contacts
Derek Shirley Contract Specialist

Full Description

Show more
Update 5 October 2022 The US Navy is hosting an informational session for industry engagement on the AFDM-10 floating dry-dock. The event will be a Teams based virtual event on 13 OCT, link to be provided from Contracting Officer upon receipt of request to attend. Attendance is recommended for any/all parties interested in the future of AFDM10. The opportunity for a 1on1 session with the Government will be offered after in the weeks following the event. Update 14 September 2022 Further Q&A from the Navy is available upon request. Please send an email to Derek Shirley at derek.s.shirley.civ@us.navy.mil and CC Mike Hammersley at james.m.hammersley.civ@us.navy.mil to request the information. Update 5 July 2022 - Q&A 1. Based upon the Navy's homeport of Everett WA, would the AFDM-10 dry-dock be used to compete with other privately owned and operated dry-docks in the homeport of Everett WA? Government Response: Yes, the offeror's shipyard operating AFDM-10 under lease (Option 1) would be eligible to compete for dry-docking availabilities with other qualified repair yards in the homeport, or coast-wide, depending on the solicitation. 2. Would the Government fund the Government Owned Contractor Operated (GOCO) (Option 2) AFDM-10 dry-dock operations and maintenance on an annual basis as necessary to maintain certifications, permits, as well as routine maintenance and operation? Government Response: No, maintenance (including overhaul) costs are contemplated to be - In-Kind Consideration under the terms of the proposed lease arrangement. Under Option 2, the AFDM-10 GOCO Contractor would be expected to provide all production support for maintenance for Facility and Production Specific Support, including performance of any and all maintenance, preservation, and repair required to ensure that the AFDM-10 is safe Navy certified, and fully operational. 3. How would AFDM-10 non-routine maintenance and overhaul costs be funded? Government Response: Maintenance (including overhaul) costs are contemplated to be - In-Kind Consideration under the terms of the proposed lease arrangement, applicable to Option 2. The awarded Contractor would be required to obtain and maintain NAVSEA Dry-Dock Certification in accordance with MIL-STD-1625(D). 4. Will the previous solicitation/contract be provided as a part of this RFI? Government Response: The requirements are in development and not available for distribution at this time. Prior to issuance of a solicitation, the Navy will post a draft for review and feedback from industry. 5. Under either Options 1 or 2 of the RFI, how does the Government intend to compensate the Contractor when the dry-dock is either not utilized or not fully utilized with a Navy ship? Government Response: No consideration or compensation would be provided if the dry-dock is not fully utilized. Update 8 June 2022 - Update to extend response due date to 17 June 2022. Update 10 May 2022 - Edit to include 75 mile radius in Request for Information paragraph 1. Notice Type: Special Notice - THIS REQUEST FOR INFORMATION (RFI) NOTICE IS FOR MARKET RESEARCH AND PLANNING PURPOSES ONLY. IT IS SUBJECT TO MODIFICAITON AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT TO IMPLEMENT ANY IDEA RESULTING FROM RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY INTERESTED PARTIES IS STRICTLY VOLUNTARY, AND NO MONETARY COMPENSATION WILL BE PROVIDED FOR RESPONSE PREPARATION. Respondents are solely responsible for properly marking and clearly identifying any proprietary information (including trade secrets) contained within their response. The Government will not be liable for, or suffer any consequential damages for any proprietary information that has not been both properly marked and clearly identified. Proprietary information received in response to this RFI will be safeguarded and handled in accordance with applicable Government regulations. To aid the Government in its review, please segregate proprietary information. REQUEST FOR INFORMATION: The objective of this RFI is to identify contractors located within 75 miles or 1.5 hours driving distance from the Naval Station Everett, located in Everett, Washington Naval Station interested in: Option 1 - Leasing the AFDM-10 from the Navy in order to competitively bid on the Naval Sea System Command's (NAVSEA) separately solicited non-nuclear surface ship maintenance, modernization, and repair requirements. Or Option 2 - Enter into a contractual relationship to operate and maintain the AFDM-10 floating dry dock as a government owned, contractor operated facility to support competitive biding by third-party ship repair contractors on NAVSEA's separately solicited non-nuclear surface ship maintenance, modernization, and repair requirements. Date and Duration of Arrangements: The commencement date of both options shall be assumed to be 01 OCT 2025. The exact duration of these arrangements has not been determined. However, for planning purposes both the lease (Option 1) and Government Owned-Contractor Operated (GOCO) (Option 2) durations can be assumed to be a five (5) year base arrangement with an additional 5-year option. Respondents that seek to pursue either option but cannot accommodate these specific dates or durations are requested to describe limiting factors and identify dates/durations that may be supported by their response. The dock would need to be in service and NAVSEA certified for operations not later than 01 APR 2026. Option 1 - Under this option, the lessee would be expected to propose preparation for and accomplishment of the non-nuclear surface ship maintenance, modernization, and repair requirements stated in NAVSEA's solicitations as an independent prime contractor. The lessee would be expected to provide all elements necessary to complete the requirements of NAVSEA's availability solicitations, including, but not limited to: Production labor (including all trade labor requirements); Support Labor (including program management, testing, quality assurance, security, purchasing, safety/environmental and any other support personnel requirements); Material (including consumables and solicitation required contractor furnished material); Support services (electrical, water, sewage, etc.) for the vessel and Ship's Force berthing barges/land-based equivalents while the vessel in dock; and Production and Support Facilities and Equipment, including shops, warehouses, and material laydown spaces, cranes, office facilities, parking lots, plant security infrastructure, etc. Should NAVSEA elect to pursue this path, the awarded contractor would be required to: Tow the AFDM-10 to the contractor's operating basin, moor it therein, and furnish all facilities and accomplish all work required to place the AFDM-10 in operation; Complete all necessary hook up and other arrangements to make the AFDM-10 fully operational and maintain it in that condition; Ensure the depth of the offeror's harbor is dredged to a depth that ensures there is a minimum clearance of thirty-six (36) inches between the bottom of the AFDM-10 and the harbor bottom at Mean Low Water (MLW); Obtain and Maintain NAVSEA Dry Dock Certification in accordance with MIL-STD-1625(D); Perform any and all maintenance, preservation, and repair required to ensure that the AFDM-10 is safe (i.e., meets required safety laws, regulations, and procedures), Navy certified, and fully operational; Obtain and Maintain a NAVSEA Master Ship Repair Agreement (MSRA) holder within 180 days of contract award; Prioritize the use of the AFDM-10 for NAVSEA dry-docking requirements over other government or commercial customers; Make the AFDM-10 and all necessary support infrastructure, including vessel, berthing barge, or barge equivalent temporary services and material laydown, available to any and all ship repair firms holding Master Ship Repair Agreements and/or Agreements for Boat Repair wishing to propose on U. S. Navy dry-docking availabilities; and Provide yearly and emergent maintenance and inspections to support ongoing use of the AFDM-10 throughout the leasing period. Option 2 - Under this option, the contractor would not be expected to complete NAVSEA's maintenance, modernization, and repair requirements themselves. Instead, the contractor would be expected to make the AFDM-10 and all associated supporting infrastructure available for third-party ship repair prime contractors to accomplish the non-nuclear surface ship maintenance, modernization, and repair requirements as independent contractors of the Government. The AFDM-10 GOCO contractor would be expected to provide all elements necessary for a third-party to complete the dry-docking requirements of NAVSEA's availability solicitations, including, but not limited to: Facility Specific Support Labor (including dock masters/engineers, plant security, and safety/environmental personnel); Support services (electrical, water, sewage, etc.) for the vessel and Ship's Force berthing barges/land-based equivalents while the vessel in dock; Limited Production and Support Facilities and Equipment, including material laydown spaces, office facilities (or laydown spaces suitable for temporary office facilities), parking lots, plant security infrastructure, etc.; and Production support for maintenance of the AFDM-10, as required. Should NAVSEA elect to pursue this path, the awarded contractor would be required to: Tow the AFDM-10 to the contractor's operating basin, moor it therein, and furnish all facilities and accomplish all work required to place the AFDM-10 in operation; Complete all necessary hook up and other arrangements to make the AFDM-10 fully operational and maintain it in that condition; Ensure the depth of the offeror's harbor is dredged to a depth to ensure there is a minimum clearance of thirty-six (36) inches between the bottom of the ADFDM-10 and the harbor bottom at Mean Low Water (MLW); Obtain and Maintain NAVSEA Dry Dock Certification in accordance with MIL-STD-1625(D); Perform any and all maintenance, preservation, and repair required to ensure that the AFDM-10 is safe (i.e, meets required safety laws, regulations, and procedures), Navy certified, and fully operational; Prioritize the use of the AFDM-10 for NAVSEA dry-docking requirements over other government or commercial customers; Make the AFDM-10 and all necessary support infrastructure, including vessel, berthing barge, or barge equivalent temporary services and material laydown, office space (or laydown spaces suitable for temporary office facilities), parking lots, etc. available to any and all ship repair firms holding Master Ship Repair Agreements and/or Agreements for Boat Repair wishing to propose on U. S. Navy dry-docking availabilities; and Provide yearly and emergent maintenance and inspections to support ongoing use of the AFDM-10 throughout the leasing period. AFDM-10 General Description (Note: All figures are approximate) Lifting Capacity 18,000 LTs at 7 inch freeboard - currently Navy certified to 10,000 LT 552 feet 0 inch without outriggers - 622 feet with outriggers Width overall 124 Feet Width clear inside 93 feet 0 inches Draft over 4 foot blocks 33 feet 3 inches Max draft submerged 54 feet 1 inches Draft requirements for base 635 feet 0 inches long by 60 feet 0 inches deep and 126 feet 0 inches wide Depth and width of channel Depends on size of vessel to be docked A copy of the latest material inspection report and the dry dock (technical) manuals are onboard the AFDM-10 and, at minimum, will be made available for prospective offerors review at the time of solicitation. The AFDM-10 is presently located at the Vigor Marine's Seattle, Washington location under the control and custodial care of the Vigor Marine. Based on NAVSEA 04X6 Dry-Docking Matrix, the AFDM-10 is certified to dock the following classes of ships, in accordance with MIL-STD-1625(D). Note: The following is developed using an average docking displacement/draft for each ship class. Actual docking conditions may affect whether a ship class will or will not fit into the facility. U.S. Navy ship classes are listed in the Naval Vessel Register and currently in service. The AS-39 class, operated by MSC, also is included due to the nuclear function of the ships. Ship Class Characterization CG-47, DDG-51, LCS-1, LSD41/49, MCM-1, and PC-1 The ship class will dimensionally fit in the AFDM-10 at practical docking drafts and the ship class's displacement/ship loads are within the AFDM-10's certified rated capacity. The ship class may have been docked in the facility previously, but required special practices to accomplish the docking. AS-39 (MSC) and LCC-19 Ship class fits in dock, but exceeds the certified rated capacity of the facility. DDG-1000 and EDD-964 Use of special techniques to increase available water depth or special blocking arrangement to decrease ship loads may be required. SSN-688 (including MTS) and SSN-774 Ship class will fit in the AFDM-10, but facility is not nuclear capable. CVB-68, CVN-76, LCS-2, LHA-1, LHA-6, LHD-1, LPD-17, SSBN-726, SSN-21, SSN-23 and SSN-23 (Tray Removed) Ship class will not dimensionally fit in the facility or the ship class/dock combination is unsuitable for other reasons. SUBMISSION DETAILS: Please provide a narrative explanation of how your company would intend to implement either Option 1 or Option 2 for the AFDM-10 floating dry-dock: Association or business name, address, CAGE code, and point of contact, including name, phone number, and email address of the individual(s) responsible for submission. Describe your company's desired approach (Option 1 or Option 2) for the AFDM-10. Describe the potential location(s) where the dock could be situated (City, State) and, if possible, provide a pictorial view of the potential mooring location. Describe any preparations that would need to be made to support relocating the dock to the location (e.g., dredging, environmental actions, etc.). Describethe temporary services that could be made available at the potential locations to include volumes, pressures, rates as available (e.g., electrical power, potable and non-potable water, steam, connectivity etc.). Describe of the support services that could be made available at the potential locations (Parking, material laydown spaces, office spaces/trailers, etc.) Rough order magnitude (ROM) cost estimates to operate and maintain the facilities, dock maintenance, and temporary services on a yearly basis. ROM schedule estimates to provide the facilities, dock maintenance, and temporary services on a yearly basis. If the notional dates and durations of the contemplated options are insufficient to facilitate an economical business model, describe the specific limiting factors and the terms, dates, and durations necessary do so. Please describe any factors or contracting considerations that would improve or adversely impact elements 2-8 above. Not responding to this RFI does not preclude participation in any future competitive solicitation, if one is issued. If a solicitation is issued, it will be announced later via sam.gov, and all interested parties must respond to that solicitation announcement separately from the responses to this RFI. A small business set-aside may be involved, but a determination can be made only when any future competitive solicitation is initiated. Responses to this notice should not exceed ten (10) pages and should include a cover letter, not counted towards the 10-page limit. Submissions shall be in Microsoft Word or Adobe Acrobat (5MB limit) and shall be sent electronically to james.m.hammersley.civ@us.navy.mil and derek.s.shirley.civ@us.navy.mil. Submissions are due no later than 1700 Eastern Time on Wednesday, 8 June 2022.

More opportunities from Department Of Defense → Navsea Hq

Same awarding agency

NAICS: 334511
New
Federal
AN/BYG-1 Applications Re-Architecture
Solicitation # N0002426R6222
Solicitation N0002426R6222, issued by the Naval Sea Systems Command (Navsea HQ), seeks a contractor for the AN/BYG-1 Applications Re-Architecture. This effort involves the re-architecting of applications associated with the AN/BYG-1 system. The solicitation was posted on October 7, 2026, with a response deadline of November 5, 2026. The primary point of contact for the effort is Michael Ravnitzky, with Matthew C. Hedrick serving as the Contracting Officer. Due to the sensitive nature of the work, strict security and data handling requirements are in place. Offerors must possess a SECRET security clearance and provide a verified DD Form 2345 Military Critical Technical Data Agreement and a signed Terms of Use Agreement to access Government Furnished Information, source code, and technical documents. All data must be handled in accordance with NISPOM standards, and the transmission of information to foreign nationals or outside the United States is prohibited without a valid export license. Furthermore, the use of public cloud repositories or external AI tools for processing technical data is strictly forbidden. Contractors are required to destroy all provided data within 180 days of the RFP closing and maintain destruction records for five years.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 334511
New
Federal
Navy Electronic Chart Display and Information System (ECDIS) Hardware and Software Production
Solicitation # N00025-26-R-5246
The U.S. Navy, through the Portfolio Acquisition Executive Mission Systems and Program Manager Warfighting / Applications (PMW/A 520), is soliciting proposals for the development, production, integration, testing, fielding, and lifecycle sustainment of the Electronic Chart Display and Information System (ECDIS) hardware and software. This full and open competition supports both surface and subsurface platforms, specifically focusing on the manufacture and assembly of AN/SYN-1 and Scalable IBS (S-IBS) hardware, alongside the maintenance and modification of software using Government Furnished Information. The contract is structured with one base year and four one-year option periods beginning in FY27, with award anticipated in Q4 FY27. The procurement utilizes a best-value tradeoff process, prioritizing technical approach and management approach over total evaluated cost and price, while past performance is rated on an acceptable or unacceptable basis. Hardware deliverables are priced via a stepladder structure, while software and hardware engineering support are provided as cost-plus-fixed-fee level-of-effort tasks. Key requirements include a Secret facility and personnel clearance, compliance with ANSI/ASQ/ISO9001:2015 quality standards, and strict adherence to cybersecurity and CUI protection frameworks. Deliveries are generally FOB Destination, with specific timelines ranging from 60 days to 18 months after award or option exercise.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 3 months
View Details
NAICS: 336611
New
Federal
USS MAKIN ISLAND (LHD 8) FY28 Docking Selected Restricted Availability (DSRA) Request for Proposal(s)
Solicitation # N0002426R4421
The Naval Sea Systems Command (NAVSEA) is soliciting proposals for the USS MAKIN ISLAND (LHD 8) Fiscal Year 2028 Docking Selected Restricted Availability (DSRA). This Signature Availability is a comprehensive effort combining maintenance, modernization, and repair, requiring a contractor with substantial West Coast facilities, including a capable pier and dry-dock. The scope of work is extensive, with estimated man-days of approximately 284,631 for maintenance and 38,416 for modernization, covering areas such as hull structure, propulsion and electric plants, auxiliary systems, and structural welding. The government anticipates making a single Firm Fixed-Price award in or before March 2027, with performance beginning in November 2027 and an expected completion date of October 30, 2029. The procurement is not set aside for small businesses due to the complexity and magnitude of the requirements. Proposals will be evaluated based on Best Value using trade-off procedures, focusing on technical eligibility, physical resource capacity, past performance, manpower, small business participation, and the proposed schedule and execution approach. Key deliverables include an integrated production schedule and an initial duration analysis due 60 days post-award. The contract includes specific provisions for growth work, including an estimated 211,989 direct labor hours and over 9.5 million dollars in materials, as well as a Small Dollar Value Growth incentive program. Offerors must be registered in the System for Award Management and submit proposals via the PIEE Solicitation Module by November 9, 2026.
Ship Building and Repairing

POSTED

5 days ago

DEADLINE

in 20 days
View Details
NAICS: 333415
Federal
Shipboard Air Conditioning Plant System Sustainment Plan (SSP)
Solicitation # N0002427R4452
Navsea HQ is conducting market research under solicitation N0002427R4452 to identify capable sources for the Shipboard Air Conditioning Plant System Sustainment Plan (SSP). This initiative aims to standardize and scale the sustainment of centrifugal, reciprocating, and rotary air conditioning plants for U.S. Navy surface ships worldwide. The government is evaluating various acquisition strategies, including a single-award Indefinite Delivery, Indefinite Quantity (IDIQ) contract or multiple-source arrangements, to improve materiel condition and operational availability across diverse ship classes and geographic locations. The contemplated scope of work encompasses six primary capability areas: executing Major AC Plant Pit Stops and overseeing Minor Pit Stops, both of which must be completed within a mandatory six-week window; providing embedded AC&R technical expertise at Shore Intermediate Maintenance Activities (SIMAs) for Sailor training and oversight; supplying OEM AC plant materiel and repair parts; managing a global warehouse and rotable pool for Overhaul Parts Packages (OPPs); providing configuration-specific engineering, technical data, and integrated product support; and delivering global unplanned and emergent field services. Interested respondents must submit a response by October 28, 2026, including a completed Capability Certification Matrix and supporting evidence of their ability to perform these requirements organically or through teaming arrangements.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

7 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS