This Solicitation opportunity from Colorado was posted on July 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this firstwage-determination
HighAI Summary for 7 CCR 1103-6 Prevailing Wage and Residency (PWR) Rules: Adopted November 9, 2023, and effective January 1, 2024, these rules from the Colorado Department of Labor and Employment (Division of Labor Standards and Statistics) administer and enforce the Keep Jobs in Colorado Act and the Prevailing Wage Act. The document defines key terms such as 'Contracting Agency', 'Colorado labor', and 'Fringe benefit', and establishes the jurisdiction and purpose of the PWR rules in alignment with the federal Davis-Bacon Act.
DOCX
DOCX, High priority: read this firstifb
HighAI Summary for AHEC-24708-B: Tivoli HVAC Repairs – Replace Make Up Air Units (MAU): Advertisement for Bids (Design/Bid/Build) for the State of Colorado, Auraria Higher Education Center (AHEC). The project involves the replacement of existing Make-up Air Units (MAU) and Condensing Units (CU) at the Tivoli Building. The scope includes mechanical and electrical demolition and installation of new equipment, with an estimated construction cost of $500,000.00. The document details base bid and alternate bid items for specific units (MAU-1 through MAU-7) and specifies that the facility will remain occupied during construction.
DOCX
DOCX, High priority: read this firstamendment
HighAI Summary for AHEC-24708-B Tivoli HVAC Repairs – Replace MAUs: Amended Advertisement for Bids (dated 7/10/2024) for Project No: P1002936 at the Auraria Higher Education Center. The project involves the replacement of Make-up Air Units (MAU) and Condensing Units (CU) at the Tivoli Building, with an estimated construction cost of $500,000.00. The document details the scope of services, including mechanical and electrical demolition and installation for a base bid and five alternates.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for AHEC-24708-B: Tivoli HVAC Repairs - Replace MAUs: Amended advertisement for bids (dated 7/10/2024) for the Auraria Higher Education Center (AHEC) project P1002936. The project involves the replacement of Make-up Air Units (MAU) and Condensing Units (CU) at the Tivoli Building, with an estimated cost of $500,000. The document details the scope of services, including mechanical and electrical demolition and installation for a base bid and five alternates.
PDF
PDF, High priority: read this firstifb
HighAI Summary for AHEC-24708-B: Tivoli HVAC Repairs - Replace MAUs: An Advertisement for Bids (Notice Number AHEC-24708-B) for the Auraria Higher Education Center (AHEC) regarding the replacement of Make Up Air Units (MAU) and Condensing Units (CU) at the Tivoli Building. The project has an estimated construction cost of $500,000.00 and includes a base bid and two alternate bid line items. The document details the mechanical and electrical demolition and removal scope of work based on BG Buildingworks designs dated October 27, 2023.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for CO20230020 - Wage Determination for Tivoli Replace MAU's: General Decision Number CO20230020 (dated 12/22/2023) specifying prevailing wage rates and fringe benefits for building construction projects in Denver County, Colorado. The document includes specific labor rates for various trades (e.g., Electricians, Plumbers, Carpenters) and outlines compliance requirements for Executive Orders 14026 and 13658 regarding minimum wage and paid sick leave.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for IFC Drawings: The document consists of Issued For Construction (IFC) drawings. As technical specifications and construction blueprints, these are critical for bid accuracy and project execution.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for P1002936 Tivoli HVAC Repairs - Bid Alternates Form: A bid alternates form for Project #P1002936 (Tivoli HVAC Repairs - Replace Make Up Air Units) at the Auraria Higher Education Center. The document provides a structured format for bidders to submit pricing for additive alternates (specifically MAU-2 through MAU-6) and deductive alternates to modify the base bid.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for P1002936 Tivoli HVAC Repairs - Bid Alternates Form: A bid alternates form for Project #P1002936, Tivoli HVAC Repairs – Replace Make Up Air Units (MAU) at the Auraria Higher Education Center. The document provides a structured format for bidders to submit pricing for additive and deductive alternates, specifically listing MAU units 2 through 6 as additive alternates.
DOCX
DOCX, High priority: read this firstspecifications
HighAI Summary for Project #P1002936 - Appendix C Labor Burden Form: A State of Colorado Office of the State Architect form for direct labor burden calculations regarding the Tivoli HVAC Repairs – Replace Make Up Air Units (MAU) project at Auraria Higher Education. This document is required for review prior to the execution of the construction agreement to establish labor burden percentages for the contractor and major sub-contractors, which will be used for future Change Order Proposals.
PDF
PDF, High priority: read this firstbid-bond
HighAI Summary for Project #P1002936 Tivoli HVAC Repairs - Appendix B2 Bid Bond: This document is a Bid Bond template for Project #P1002936 (Tivoli HVAC Repairs - Replace Make Up Air Units) for the Auraria Higher Education Center. It requires the Principal to provide a guaranty of 5% of the total bid price to the State of Colorado, ensuring the execution of the agreement and provision of required bonds and insurance if awarded. Failure to provide a properly executed bond with a Power of Attorney will result in the proposal being deemed non-responsive.
DOCX
DOCX, High priority: read this firstbid-bond
HighAI Summary for Project #P1002936 Tivoli HVAC Repairs - Bid Bond Form: A formal Bid Bond template for the Auraria Higher Education Center project #P1002936 (Tivoli HVAC Repairs – Replace Make Up Air Units). It requires a guaranty of 5% of the total bid price and specifies that failure to provide a properly executed bond and Power of Attorney will result in the proposal being deemed non-responsive.
DOCX
DOCX, High priority: read this firstrfb
HighAI Summary for Project #P1002936 - Tivoli HVAC Repairs Bid Form: This is a formal Bid Form for the State of Colorado, Office of the State Architect, regarding Project #P1002936: Tivoli HVAC Repairs – Replace Make Up Air Units (MAU) at the Auraria Higher Education Center. The document outlines the base bid amount, completion timelines, and certifications regarding Colorado labor laws, SDVOSB status, and bid guarantees. It requires the bidder to acknowledge receipt of addenda and adhere to state prevailing wage and apprenticeship requirements.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Project #P1002936 - Tivoli HVAC Repairs Replace MAUs Bid Form: This document is the official Bid Form (Appendix B) for Project #P1002936, titled 'Tivoli HVAC Repairs - Replace Make Up Air Units (MAU)' for the Auraria Higher Education Center. It includes requirements for bidder acknowledgments, time of completion, bid guarantees, and compliance with Colorado labor and wage laws. The document serves as the formal proposal submission form where bidders commit to the scope of work, pricing, and contractual terms.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Project #P1002936 Tivoli HVAC Repairs - Replace MAUs Information for Bidders: Instructional document for bidders regarding Project #P1002936 for the replacement of Make Up Air Units (MAU) at the Auraria Higher Education Center. It outlines bid submission requirements, bid security (5% for bids over $50,000), compliance with Colorado state laws and prevailing wages, and the 'lowest responsible bidder' award method involving additive and deductible alternates.
DOCX
DOCX, High priority: read this firstrfb
HighAI Summary for Project #P1002936 - Tivoli HVAC Repairs (Replace MAUs) Information for Bidders: This document provides critical bidding instructions for Project #P1002936, involving the replacement of Make Up Air Units (MAU) at the Auraria Higher Education Center. It outlines requirements for the bid form, submission procedures to Procurement Services, bid security (5% for bids over $50,000), and the 'lowest responsible bidder' award method involving additive and deductible alternates. It also specifies compliance with Colorado state laws, prevailing wages, and environmental product declarations.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for State Form SC-6.21 Contractor's Design/Bid/Build Agreement: A template for a Design/Bid/Build (D/B/B) agreement issued by the State of Colorado Office of the State Architect. The document outlines the legal agreement between a state agency and a contractor, including articles on performance of work, time of completion, contract sum, and required exhibits such as performance bonds and prevailing wage determinations.
DOCX
DOCX, High priority: read this firstcontract-document
HighAI Summary for State Form SC-6.21 Contractor's Design/Bid/Build Agreement: A standard State of Colorado Office of the State Architect agreement (Form SC-6.21) for Design/Bid/Build (D/B/B) projects. The document outlines the legal framework for the contractor's agreement, including performance of work, time of completion, contract sum, and required exhibits such as bonds, insurance, and prevailing wage determinations.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for State Form SC-6.23: General Conditions of the Contractor's Design/Bid/Build Agreement: This document contains the General Conditions (State Form SC-6.23) for Design/Bid/Build agreements issued by the State of Colorado Office of the State Architect, State Buildings Program. It establishes the legal and operational framework for construction contracts, covering 54 articles including definitions, insurance requirements, payment processes, change orders, claims, termination procedures, and Colorado-specific legal provisions.
DOCX
DOCX, High priority: read this firstcontract-document
HighAI Summary for State Form SC-6.23: General Conditions of the Contractor’s Design/Bid/Build Agreement: This document establishes the General Conditions for Design/Bid/Build (D/B/B) agreements for the State of Colorado Office of the State Architect, State Buildings Program. It outlines comprehensive contractual terms including definitions, insurance requirements, payment processes, change orders, dispute resolution, and termination procedures.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.