Air Force Utilities Privatization Effort for Robins AFB Wastewater Distribution System

Active
FA3002-09-R-0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Air Force is seeking competitive offers for the privatization of the wastewater collection and treatment system at Robins Air Force Base, Georgia, with the anticipated release of the Request for Proposal around March 20, 2009. This effort involves conveying the wastewater utility system to a non-federal entity such as a municipal or private utility company under the authority of 10 U.S.C. 2688, with a contract term projected to be 50 years. The privatization covers the domestic wastewater system, including collection piping, lift stations, and the Domestic Wastewater Treatment Plant No. 1 (SWTP 1), but excludes the industrial wastewater treatment plants, groundwater treatment plant (GWTP), and associated infrastructure. The system discharges treated effluent into the Ocmulgee River under specific National Pollutant Discharge Elimination System (NPDES) permits, maintaining multiple compliance monitoring points. The domestic wastewater system, originally constructed in 1942 and upgraded in 1971 and 1978, features a combination of vitrified clay, concrete, and various piping materials, with ongoing improvements such as slip-lining and repair of approximately 50 miles of collection pipes. The system includes about 50 lift stations equipped with submersible pumps, although SCADA monitoring equipment is excluded from the privatization scope. The facility also handles occasional discharges of Aqueous Film Forming Foam (AFFF) with treatment adjustments such as de-foaming agents. There are noted contamination and excavation restrictions in certain industrial areas of the base, with protective measures required during any soil disturbance. The government has indicated this solicitation does not guarantee contract award nor authorize incurring costs prior to award. Robert C. Gable serves as the Contracting Officer and the primary point of contact for this procurement.

General Info

Air Force seeks 50-year privatization contract for wastewater system at Robins AFB, excluding industrial plants.

Agency

N/A

NAICS

221320 - Sewage Treatment Facilities

Place of Performance

Robins AFB, GA, 31098, Robins AFB, GA, 31098, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Robert C. GableContracting Officer

Full Description

Show more
POC information: Robert C. Gable, Contracting Officer (email is preferred method of communication) contact@example.gov; COMM +1 (555) 000-0000; FAX +1 (555) 000-0000 AETC CONS/LGCT, AFCESA Support Flight, 136 Barnes Avenue, Building 856 Annex, Tyndall AFB, FL 32403 is soliciting competitive offers for Air Force Utilties Privatization - Robins AFB, GA Wastewater Distribution System. Anticipated release of RFP for this effort is on/around 20 Mar 2009. Privatization is defined as the conveyance of a utility system to a municipal, private, regional, district, or cooperative utility company or other entity. The conveyance may consist of all right, title, and interest of the United States in the utility system. Utility Privatization (UP) will be accomplished in accordance with 10 U.S.C. 2688 Utility Systems: Conveyance Authority. Contract term is anticipated at 50 years. The following is a description of the system to be privatized: The wastewater collection and treatment system at Robins AFB includes the domestic (sanitary) system. The industrial wastewater collection system and associated treatment plants are not included with the system to be privatized. Each system has its own set of collection piping and treatment facilities. The industrial system is made of up two treatment plants ? IWTPs 1 and 2. IWTP 1 discharges directly into the domestic treatment plant for final polishing. The POD from IWTP 1 is a buried valve at the north end of the Biological Treatment plant aeration basins. The treated effluent from IWTP 2 is combined with the treated effluent from the Domestic Wastewater Treatment Plant in the effluent pump station. The point of demarcation is where the effluent from IWTP 2 enters the wet well at Building 8369. There is also an on-Base GWTP, whose treated effluent is also combined in the effluent pump station. In addition, the backwash from the carbon columns at the GWTP is discharged into the line from IWTP 1 to SWTP 1, upstream of the Biological Treatment plant aeration basins. The GWTP, and its associated infrastructure, is not included with the wastewater system being privatized. The POD for GWTP discharge is where effluent from the GWTP enters the pipe between the chlorine contact chamber and Parshall flume. The POD for the backwash is the buried valve at the north end of the Biological Treatment plant aeration basins. Treated wastewater from the Domestic Wastewater Treatment Plant, IWTP 2, and the GWTP are combined in the effluent pump station prior to discharge offsite into the Ocmulgee River. Robins AFB?s treated wastewater is discharged into the Ocmulgee River under national pollutant discharge elimination system (NPDES) Permit No. GA 0002852. There are three compliance points (outfalls) with permit limits for wastewater discharge, one each, from the Domestic Wastewater Treatment Plant, GWTP, and IWTP 2. Outfall No. 008 is the monitoring point for the IWTP 2. Outfall, No. 009 is the monitoring point for the Domestic Wastewater Treatment Plant, Outfall No. 010 is the monitoring point for the GWTP. The original construction of the domestic system infrastructure began in 1942. The domestic system consists of collection piping, manholes, lift stations, and a treatment plant. The original domestic wastewater treatment plant is not currently operational. In 1971, the original 1942 treatment plant was replaced with a more modern facility, which was designated as Domestic Wastewater Treatment Plant No. 1 (SWTP 1). SWTP 1 was originally designed to provide preliminary, primary, secondary, and tertiary treatment prior to discharge into the Ocmulgee River. The POD is where the discharge pipeline terminates at the Ocmulgee River. The original treatment facility consisted of a plant headworks, grit chamber, grinder, influent Parshall flume, primary sedimentation tanks, trickling filters, secondary clarifiers, centrifuge, and disinfection with chlorine. Solids handling consisted of anaerobic digestion. The treatment facility was expanded in 1978 to include additional primary sedimentation tanks, aeration tanks (nitrification tanks), new secondary clarifiers, tertiary filters, and chlorination and dechlorination facilities. Aerobic digesters and drying beds were added to the solids-handling facilities to replace the anaerobic digesters. Except for the former digesters of the original biological treatment facilities, these facilities are currently not in use. One of the former aeration basins has been converted to an aerobic digester to increase the capacity of SWTP 1. The second aeration basin has been converted into a holding tank for temporary storage of IWTP 1 discharge. Temporary storage of IWTP 1 discharge is required periodically to prevent SWTP 1 plant upsets. Occasionally discharge from IWTP 1 contains constituents harmful to the biological treatment processes of SWTP 1 and requires reduced blending rates through SWTP 1. The holding tank is used to achieve the required blending rates to prevent upsets at SWTP 1. Further modifications made to SWTP 1 treatment facilities include the addition of an ultraviolet disinfection facility and the installation a plant-effluent pumping station. Chlorine disinfection is currently the primary treatment as the ultraviolet disinfection facility is inefficient for final polishing due to the iron content in the wastewater. Sludge generated from the aerobic and anaerobic (following stabilization) digesters is transferred for de-watering to a centrifuge at SWTP 1. The de-watered solids are then disposed of offsite at an approved facility. In the 1960s, a treatment plant was constructed in the Building 800 area, near housing, to handle the increased load from the housing areas. This facility was referred to as Domestic Wastewater Treatment Plant No. 2 (SWTP 2). Currently, treatment equipment has been removed from SWTP 2 and replaced with a lift station located at the former headworks, which is used to transfer wastewater to SWTP 1. This lift station and the drying beds, which are still in service, are referred to as SWTP 2. There are 50 domestic wastewater lift stations located throughout the Base that are used to transfer wastewater to other lift stations or manholes. All the sanitary wastewater is transferred to SWTP 1 for processing. Most of the lift stations are equipped with two submersible-type pumps. Pumps and controls at the lift stations have been upgraded or replaced since 1991. SCADA monitoring equipment has been added, or is in the process of being added, to the lift stations. The SCADA system is not included with the system to be privatized. Original materials of construction for the collection system consisted primarily of vitrified clay and concrete pipe with brick manholes. New construction is generally polyvinyl chloride (PVC) pipe, and concrete manholes. Standard installation practices are to install tracer wire or tape with plastic piping; however, it is not known if all plastic piping was installed with tracer wire or tape. The Contractor should not include any projects to install tracer wire on piping in their proposal. Any requirements for tracer wire will be addressed after contract award. Most of the pipe is 4 to 15 inches in diameter. The domestic collection system is comprised of several different piping materials, including cast iron, asbestos cement, reinforced concrete, vitrified clay, ductile iron, and PVC. Approximately 70 percent of the collection piping material is vitrified clay or concrete, of which approximately 90 percent has been slip-lined. The average burial depth of the piping is approximately 8 feet below ground surface. Approximately 25 percent of the collection system is installed beneath paved surfaces. Robins AFB has completed a five-year collection pipe improvement program to clean, inspect, and repair the sanitary sewer lines. Approximately 50 miles of pipe were cleaned and inspected through this program. Approximately 180 point repairs have been completed along these sections of pipe. The repairs were noted as point repairs and also include some repairs made for pipe breaks, which were independent of the program. In some cases, the point repairs were instead full segment repairs. Generally, lines are being repaired by slip lining with high-density polyethylene (HDPE) pipe or with an in-situ liner. Air Force operations include occasional, unscheduled, discharges of Aqueous Film Forming Foam (AFFF) to the wastewater treatment system. Current treatment plant operations include the addition of de-foaming agents. Robins AFB has excavation restrictions in portions of the Industrial Area due to contamination of subsurface soils and groundwater from spills, leaks, and other releases that predate regulatory restrictions. This restricted excavation area houses machine shops, metal finishing, industrial waste treatments plant and associated underground piping, industrial materials storage, and drummed waste storage facilities. Implementation of the remedy selected in the Excavation Plan for the Industrial Area is required in order to ensure the protection of personnel coming into contact with the site and to eliminate or minimize risk associated with the contamination. This area of the Base is 84 percent paved, behind security fencing, under building foundations, or beneath streets. There is very limited potential for exposure to workers or visitors in the area. The most likely scenario in which exposure to contaminated soils might occur is in the event of maintenance or construction activities requiring excavation of affected soil. Maps of the area and a copy of the Excavation Plan for the Industrial Area will be supplied in the technical library. This synopsis shall not be construed as a commitment or authorization to incur costs in anticipation of an award. The Government is not bound to make any awards under this notice.

Similar Contracts

Same NAICS industry code

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Dsc Contracting Services Division

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 221320
New
SLED
RFB-758-2700000186-1 | Water and Wastewater Operations, Maintenance, Monitoring
Solicitation # RFB-758-2700000186-1
Solicitation RFB-758-2700000186-1 is a request for bids issued by the Kentucky Department of Military Affairs to secure a contractor for comprehensive water and wastewater operations, maintenance, monitoring, and repair services at Bluegrass Station. The scope of work encompasses the wastewater treatment and collection systems, the stormwater system, and the drinking water distribution system. The selected contractor will be responsible for providing all management, labor, equipment, and administrative support, including specialized electrical services for pumps and motors, laboratory coordination, and emergency response. The contract is structured with an initial one-year term and includes the option for four additional two-year extensions. The award will be determined using a Best Value Ranking Approach, where price accounts for 90 points and business experience accounts for 10 points, with a minimum requirement of three years in business. Bidders must provide documentation of their business history and hold current Kentucky Class II certifications for both Wastewater Operator and Collection System Operator roles. Mandatory requirements include minimum insurance coverage of 1,000,000 dollars for both automobile and professional liability, compliance with the Equal Employment Opportunity Act of 1978, and adherence to Section 504 of the Rehabilitation Act of 1973. All bids must be submitted electronically via the Vendor Self Service portal by November 16, 2026.
Department of Military Affairs

POSTED

1 day ago

DEADLINE

in 18 days
View Details
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

9 days ago

DEADLINE

in 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS