Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Air Release Valve Replacement Program 2024/2025

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Juan Water District is undertaking a project to replace up to 45 existing 1-inch, 2-inch, and 3-inch air release valves within its Retail Service Area in Granite Bay, Placer County, California. The replacement effort is focused on installing new valves that vent above ground to comply with California Code of Regulations, Title 22, Section 64576, ensuring alignment with state public health and safety standards. All work will occur within existing public rights-of-way and easements, with no expansion of infrastructure or additional surface disturbance. The project is categorized as a routine maintenance activity under CEQA categorical exemptions, specifically sections 15301(d) and 15302(c), due to its minimal environmental impact and limited scope. The performance period spans calendar years 2024 and 2025, with all installations to be completed on-site at the current valve locations. The San Juan Water District serves as both the lead agency and the entity responsible for executing the project, with Mark Hargrove, Senior Engineer, designated as the primary point of contact. No formal contract type, pricing details, or federal acquisition regulation clauses are specified in the available documentation, indicating this is an internally managed infrastructure update rather than a competitively bid federal procurement. There are no identified subcontracting requirements, socioeconomic set-asides, payment office details, or formal inspection protocols beyond compliance with the above-ground venting regulation. Environmental compliance is confirmed through a Notice of Exemption filed with the Office of Planning & Research and a $50 fee paid to the Placer County Clerk. The project does not involve federal contract administration elements such as a contracting officer, COR/COTR, invoicing systems, or federal representations, and all documentation is centered on state regulatory adherence and local implementation.

General Info

San Juan Water District replaces 45 air valves above ground in Granite Bay to meet California health standards, 2024–2025.

Agency

California → San Juan Water District

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

NOE - Air Release Valve Replacement Program 2024-2025

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Juan Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Juan Water District
Office AddressN/A
Contacts
Mark HargroveSenior Engineer

Full Description

Show more
Project includes replacing up to 45 existing 1-inch, 2inch. and 3-inch air release valves (ARV's) at various locations within San Juan Water District's (SJWD) Retail Service area with similar size ARV's. More specifically the project will include replacing the existing ARV's with ARV's that vent above ground as required by California Code of Regulations, Title 22, Section 64576. The Project benefits SJWD's water customers.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
Perimeter Intrusion Detection System (PIDS) Phase IIIThe Port of Seattle’s Aviation Project Management Group is forecasting the Perimeter Intrusion Detection System (PIDS) Phase III project, which will establish the foundational power and communication infrastructure necessary to support advanced PIDS components including Lidar, Radar, and camera systems. This initiative aims to enhance security across airport perimeters by enabling reliable, real-time monitoring and detection capabilities through integrated sensor technology. The project is currently in a pre-solicitation phase with no formal solicitation number assigned, and no set-aside type or NAICS code has been specified. All work is expected to occur at Port of Seattle facilities, though the exact location details are not yet defined. Primary point of contact for the project is Yanet Maldonado, reachable via phone or email, with Michelle Carioto serving as the Project Manager for technical coordination. Interested parties should monitor the official Port of Seattle SOPS portal for future solicitation releases, as no formal deadline or bid submission window has been established. The forecasting notice indicates a planned deployment timeline, with the posting date listed as August 1, 2026, suggesting the project will be formally solicited in the near future. Bidders should prepare for requirements related to robust, secure, and weather-resistant infrastructure capable of supporting continuous operation of high-performance sensing devices in an airport environment.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237130
New
Federal
Nez Perce - Clearwater National Forest - Kelly Forks Work Center Emergency Electrical Repairs
Solicitation # 1240LU26Q0105
The U.S. Department of Agriculture, through the Csa Intermountain 9 Usda-Fs office in Ogden, Utah, is soliciting quotations for Emergency Electrical System Repairs at the Kelly Forks Work Center in North Fork, Idaho, under solicitation number 1240LU26Q0105. This is a combined synopsis and solicitation issued under FAR Part 12 for commercial items, with no separate written solicitation to follow. The requirement is exclusively set aside for small business concerns, classified under NAICS code 237130 with a size standard of $45 million in annual receipts, and is structured as a Total Small Business Set-Aside, allowing all responsible small business sources to submit quotations. The opportunity was posted on July 16, 2026, and responses are due by August 3, 2026, at 11:00 PM Eastern Time. The place of performance is located in North Fork, Idaho, with the contract award expected to be managed from the agency’s office in Ogden, Utah. Primary point of contact for questions is Wes Dudley, Contracting Officer, reachable via email at wesley.dudley@usda.gov, with secondary support available from Ethan Hoctor at 208-702-3785. All proposed quotations must demonstrate the ability to perform emergency electrical repairs promptly and effectively in accordance with the scope of work, and submissions must be made through the SAM.gov platform using the provided UI link. Only small businesses meeting the size standard and deemed responsible will be considered for award.
Csa Intermountain 9 Usda-Fs

POSTED

1 day ago

DEADLINE

in 4 days
View Details
NAICS: 237130
New
Federal
Solar Construction on New Building
Solicitation # 1232SA26Q0880
This contract solicitation, identified as 1232SA26Q0880, is a combined synopsis and solicitation issued under FAR Part 12 for the installation of a new solar array on the rooftop of an existing building at the Southwest Watershed Research Center in Tucson, Arizona. The acquisition is structured as a Total Small Business Set-Aside under NAICS code 237130, with a small business size standard of $45 million, and is open only to responsible small business concerns. The solicitation is an RFQ and no separate written solicitation will be issued; all quotations must be submitted by the deadline of August 7, 2026. The work includes electrical installations for a 12.47 kV primary and 208V/120V secondary system, final connections to the existing transformer, patching and repair of the roof membrane, and full project management. The performance period is set at 200 calendar days from the Notice to Proceed. All proposals must comply with numerous mandatory contract clauses, including labor standards under the Davis-Bacon Act, whistleblower protections, anti-trafficking requirements, and security protocols for information systems. Offerors must submit a fully completed SF 1442, a summary cover letter with SAM UEI and Tax ID, an acknowledgement of all amendments, and all specified attachments, including the Statement of Work, project specifications, PV drawings, pricing schedule, and wage determination. Failure to provide any required document renders the offer non-responsive. The award will be made using a Lowest Priced Technically Acceptable methodology, where technical acceptability and past performance serve as pass/fail gates. Acceptability depends on meeting all specifications, safety standards including EM 385-1-1, material handling and labeling requirements, and submission of a Site Specific Safety Plan approved by the Government. Contractors must provide an on-site superintendent with five years of relevant experience and a certified Site Safety and Health Officer, maintain workforce integrity, adhere to Buy American requirements, and comply with prevailing wage rates as specified. Performance and Payment Bonds are required, along with specific insurance coverage. Invoices must include detailed information including TIN, SAM UEI, contract number, and deliverables, and submission must follow a dual process: an original and copy to the Contracting Officer and COR, followed by electronic submission through the Treasury’s IPP portal. Inspection and acceptance follow a multi-stage process with formal notifications, required attendance by contractor representatives
USDA Ars Afm Apd

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 237130
New
SLED
Central Utility Plant Expansion Bid Package 03a – Site Electrical Infrastructure Extension (Design Build)
Solicitation # 9557660
This contract pertains to Bid Package 03a of the Central Utility Plant Expansion at UC Davis Health in Sacramento, California, focusing on the design-build extension of site electrical infrastructure to support a new 40,000 square foot CUP Annex and 9,000 square feet of renovations to the existing CUP. The scope includes establishing a redundant normal power feed from SMUD’s East City feed to the CUP and Annex Building, ensuring reliable electrical service for the upcoming California Tower replacement hospital and other campus utility upgrades. The project intersects both HCAI and Non-HCAI regulatory scopes and requires extensive coordination with SMUD, CUPx, university stakeholders, and multiple Authorities Having Jurisdiction, involving a series of integrated design packages and permits. Only three prequalified electric contractors—AMS ELECTRIC LLC, SCHETTER ELECTRIC LLC, and SPRIG ELECTRIC CO (ARCHKEY SOLUTIONS)—are eligible to submit proposals, and participation in a mandatory job walk on July 29, 2026, is required for bid eligibility. Proposals must be submitted in two formats: a hard-copy price proposal delivered to Rudolph and Sletten’s office in Roseville and a technical proposal uploaded via Building Connected by the August 14, 2026 deadline. A bid bond equal to 10% of the $12.5 million target cost, issued by an admitted surety insurer under California law, is mandatory. Contractors must comply with UC Fair Wage and prevailing wage standards under California Labor Code §§1725.5 and 1771.1, register with the Department of Industrial Relations, adhere to equal employment opportunity policies, and demonstrate best efforts to include Small Business Enterprises and Disabled Veteran Business Enterprises in subcontracting. The place of performance is located at 4800 2nd Avenue, Sacramento, CA 95817, with project execution expected to align with broader campus infrastructure expansions. No specific contract administration details, such as payment office, COR/COTR/PCO designations, invoicing systems, or formal clause citations, are provided in the documentation, and the evaluation criteria for award are not disclosed.
University of California Davis Health

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 237130
New
SLED
High Voltage Streetlight Conversion (Phase 4) Project
Solicitation # 460040-04
The City of San Mateo, California, is soliciting bids for the High Voltage Streetlight Conversion (Phase 4) Project, a fixed-price infrastructure initiative with an estimated contract value of $3,025,940. The work involves replacing existing streetlight infrastructure with energy-efficient LED luminaires, including the removal of over 120 old fixtures and the installation of 122 new ones comprising post-top, tear-drop, and cobrahead models. Associated tasks include asphalt grinding, hot mix asphalt overlay, new conduit installation totaling over 24,000 linear feet, trenching, conductor placement, thermoplastic roadway striping, traffic control, and landscape restoration. All work must comply with Caltrans Revised Standard Specifications, CA-MUTCD, and City-specific standards, with special provisions overriding any conflicting requirements. Performance is strictly limited to the project site in San Mateo, with work to begin within five days of the Notice to Proceed and completion constrained by the contract time, though no final date is specified. Bids must be submitted as a sealed paper package to the City Clerk’s office by 2:00 p.m. on August 27, 2026, and electronic submissions are prohibited except for the bidder’s bond through an approved electronic registry. The contract imposes stringent compliance obligations including mandatory adherence to California prevailing wage rates under Senate Bill 854, requiring all laborers and subcontractors to be registered with the Department of Industrial Relations and to submit certified weekly payroll reports. Contractors must also maintain insurance coverage as outlined in Exhibit A for the life of the project plus five additional years, carry workers’ compensation insurance, and certify compliance with non-discrimination and non-collusion statutes. A 5% retention of contract payments will be held until 35 days after recording the Notice of Completion, with options to substitute securities or use an escrow agent at the contractor’s expense. Legal workdays are capped at eight hours or 40 hours per week, and violations trigger penalties of $25 per laborer per day. The City holds the right to accept or reject work based on compliance with quality standards, including asphalt density thresholds, soil contaminant limits, and as-built drawing accuracy, and reserves broad indemnification rights, including protection against claims arising from its passive negligence. All bids must include completed certifications for site verification, experience, prevailing wage, and diesel vehicle use, with failure to submit any required document rendering the bid nonresponsive. The contractor is expected
CITY OF SAN MATEO, CALIFORNIA

POSTED

2 days ago

DEADLINE

in 26 days
View Details
NAICS: 237130
New
Federal
Z2DA--519-20-200 VABS Replace Boiler Plant Solicitation 36C25726B0006
Solicitation # 36C25726B0006
The solicitation for the Z2DA--519-20-200 VABS Replace Boiler Plant, identified by number 36C25726B0006, was posted on April 21, 2026, with six amendments issued through July 30, 2026, and a response deadline of August 17, 2026. This is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under FAR 19.14, with NAICS code 237130, managed by the Department of Veterans Affairs’ Network Contracting Office 17 in San Antonio, Texas, and performance required at Big Spring, Texas. Offerors are solely responsible for monitoring SAM.gov for all amendments, clarifications, and updates; failure to do so will render a proposal non-responsive without recourse. The solicitation operates under a Lowest Price Technically Acceptable (LPTA) evaluation model, with award based strictly on conformance, responsiveness, and lowest price, with no considerations for technical approach, past performance, or management plan. The scope of work involves the installation, commissioning, and testing of boiler plant systems, including steam generation, controls, instrumentation, and safety interlocks, with deliverables requiring manufacturer literature, operating manuals, as-built drawings, test reports, and compliance documentation per ASME, ANSI, NFPA, IPC, and VA-specific standards. Inspection and acceptance occur at the job site, governed by FAR 52.246-12 and other standards including NEC and NFPA 99, with testing requirements such as insulation-resistance checks, thermographic surveys, and functional performance validation. Invoicing must be submitted electronically via VA’s EIPP system through the Tungsten Network; no WAWF or other alternatives are permitted. Contract administration is overseen by COR Horacio Fernandez. Special requirements under the VA Veterans First Contracting Program mandate that no more than 85% of non-material payments be made to non-SDVOSB subcontractors in general construction and 75% in special trade construction, with all SDVOSB subcontractors required to be SBA-certified and a certificate of compliance submitted. Joint ventures are permitted but must comply with 13 CFR §128.402, and VAAR 819.70 supersedes any conflicting SBA rules. Proposals must
257-NETWORK Contract Office 17 (36C257)

POSTED

2 days ago

DEADLINE

in 16 days
View Details