12KV Extension Laguna Springs-Sirroco Project

Forecast
30192208State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sacramento Municipal Utility District is implementing the 12KV Extension Laguna Springs-Sirroco Project, identified by solicitation number 30192208. Located in a commercial area near the intersection of Laguna Springs Drive and Longleaf Drive in Elk Grove, California, the project involves the installation of approximately 350 feet of new 12kV utility cable. To minimize environmental impact and avoid surface disturbance in sensitive habitats, the project will utilize Horizontal Directional Drilling to install two 6-inch and two 4-inch conduits. The process includes drilling a pilot hole and enlarging it to a 16-inch diameter, with all activities maintained at a minimum depth of 60 inches below the ground surface and at least 10 feet below the bed, bank, and channel of Laguna Creek. Additionally, a 6 by 8 foot pull box will be installed in one of the bore pits for future maintenance. The project is categorized as a forecast with a NAICS code of 237130 and is expected to be completed by June 2026. All equipment and staging will be restricted to urban upland habitats to prevent encroachment upon the creek banks. Execution of the work is contingent upon obtaining a Streambed Alteration Agreement from the California Department of Fish and Wildlife, and the actual construction phase is anticipated to take no longer than five days. The project has been filed with a Notice of Exemption under CEQA Guidelines for small utility extensions and minor land alterations. Ranie Shreckengost serves as the primary environmental specialist and point of contact for the agency.

General Info

SMUD will install 350 feet of 12kV utility cable in Elk Grove by 2026.

Agency

California → Sacramento Municipal Utility District

Place of Performance

Laguna Springs Drive and Longleaf Drive, Elk Grove, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento Municipal Utility District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sacramento Municipal Utility District
Office AddressN/A

Full Description

Show more
SMUD is proposing to install approximately 350 feet of new 12kV utility cable within conduit below Elk Grove Creek / Laguna Creek (Laguna Creek). The project would employ the use of Horizontal Directional Drilling (HDD), a method intended to reduce environmental impacts through the avoidance of surface disturbance in sensitive habitats. The sending and receiving bore pits for the HDD bore under Laguna Creek will be located within upland habitats that are categorized urban land use. The southwestern pit is more than 200 feet from the water’s edge, and the northeastern pit is more than 40 feet from the water’s edge. A total of four conduits - two 6-inch and two 4-inch - will be pulled through the bore path under Laguna Creek, completing the installation. All HDD activities will occur at a minimum depth of approximately 60 inches below the ground surface level and at least 10 feet below the bed, bank, and channel of the creek. Project equipment and staging will be restricted to urban, upland habitats and will not encroach upon the banks of Laguna Creek. The Laguna Creek HDD activity is anticipated to be completed by June 2026, after the California Department of Fish and Wildlife Streambed Alteration Agreement is obtained. The work is anticipated to take no longer than five days.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
This contract, titled ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction, is for Davis Bacon construction services at the William J. Hughes Technical Center in Atlantic City, NJ. The project supports the Federal Aviation Administration's Airport Technology Research & Development branch by providing controlled demolition of existing runway test pavement and the construction of new concrete test slabs and pavement structures. The scope includes providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing material characterization tests such as California Bearing Ratio and Plate Load tests. The subcontractor is responsible for procuring materials, managing waste removal, and coordinating with testing laboratories and geotechnical engineering services. The project is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Work is generally scheduled during normal business hours from Monday through Friday, 6:00 a.m. to 6:00 p.m., with potential for after-hours or weekend work as needed. The solicitation is managed by Parsons Corporation under NAICS code 237130.
Parsons Corporation

POSTED

about 7 hours ago

DEADLINE

in 2 months
View Details
NAICS: 237130
New
SLED
Design and Construction of Power Distribution Center at the County Solid Waste Disposal Complex - Design Build (Rebid)
Solicitation # 27-0075-RFQ-DB
Pinellas County is seeking a design-build team for the design and construction of a centralized microgrid at the County Solid Waste Disposal Complex. The project aims to consolidate and modernize electrical infrastructure by replacing existing Duke Energy services with a new system that integrates distributed energy resources, including a Waste-to-Energy facility and a floating photovoltaic array with an estimated 5 MW capacity. Key deliverables include the construction of a new switchgear building elevated above the 500-year floodplain, the installation of PV inverter systems and transformers, and the development of advanced overhead and underground distribution infrastructure. All work must comply with the Florida Building Code, NEC, NESC, and IEEE 1547 cybersecurity requirements. The project is structured in two phases: Phase 1 focuses on design and pre-construction services with a duration of 274 to 365 days, and Phase 2 covers construction with a duration of 390 to 480 days. Phase 2 will be executed as a Guaranteed Maximum Price (GMP) contract. Evaluation of proposals is based on a 100-point scale considering firm experience, Pinellas County SBE status, minority business status, and location, with potential additional points for oral presentations. Required bonds include a 5% bid bond for the Phase 2 base bid and 100% performance and payment bonds for the final lump sum price. There is no specific set-aside status for this solicitation.
SOLID WASTE

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 237130
New
SLED
Maryland National Electric Vehicle Infrastructure (NEVI) Round 3
Solicitation # AZ3405386
The Maryland State Highway Administration (SHA) is soliciting Design-Build contracts for the Maryland National Electric Vehicle Infrastructure (NEVI) Round 3 program. The scope of work requires contractors to design, construct, operate, and maintain electric vehicle charging stations, including securing rights to site locations on private property, in accordance with Federal Highway Administration (FHWA) standards. The procurement will be conducted using the Competitive Sealed Proposals method, with the SHA intending to make multiple best-value awards based on a fully integrated trade-off analysis of technical and financial proposals. Technical evaluation factors, particularly the Project Site Technical Proposal, carry higher relative importance than the financial proposals. Key regulatory requirements include strict adherence to the Build America, Buy America Act and Title 23 Buy America clauses, though a phased waiver has been provided by the FHWA. Contractors must comply with nondiscrimination policies, ADA requirements, and prevailing wage instructions. Additionally, personnel must hold appropriate licenses and certifications per 23 CFR 680.106 (j), and contractors are responsible for cybersecurity and privacy impact assessments. Proposals must be submitted in three separate volumes (General Technical, Project Site Technical, and Project Site Financial) via physical sealed packages and flash drives. This solicitation is not designated as a Small Business Reserve procurement.

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
SLED
Cedar Avenue and Santa Ana Avenue Streetlight Project
Solicitation # SPD127-SPDAD-6610
The Cedar Avenue and Santa Ana Avenue Streetlight Project is a construction solicitation issued by the San Bernardino County Department of Public Works - Special Districts for County Service Area SL-1. The project scope requires the contractor to provide all supervision, labor, equipment, and materials to install 1,220 linear feet of 3-inch conduit to serve four streetlights at the intersection of Cedar Avenue and Santa Ana Avenue in Bloomington, California. The work includes backfilling, repaving of asphalt or concrete, and the management of permitting and traffic control. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid, with responsiveness requiring the submission of at least three projects of similar size and scope completed within the last five years. Bidders must possess a California Class A Contractor's License and be registered with the Department of Industrial Relations. The project mandates compliance with California Labor Code sections 1770 and 1773 regarding prevailing wages, as well as OSHA and California State Construction Safety Orders. Key requirements include the provision of a bid bond of at least 10% of the total bid price, and performance and payment bonds equal to 100% of the contract sum. Technical standards are governed by SCE's MC 860 and Underground Structures Standards, with specific quality criteria for precast vaults and manholes. The contractor must also adhere to the Americans with Disabilities Act and various federal and state non-discrimination executive orders. There is no specified set-aside status for this solicitation.
Administration

POSTED

2 days ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS