Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from California was posted on May 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Airport Electrical & Lighting Systems Engineering

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 12 hours ago

DEADLINE

in 17 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 12 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

This contract involves the engineering and design of critical airport electrical systems, including airfield lighting, navigational aids, terminal electrical infrastructure, emergency power solutions, and lighting circuits that comply with FAA standards. It is categorized as a subcontract under the NAICS code 541330, indicating engineering services. The project is managed by an airport agency based in California, with work focused on enhancing operational safety and reliability through advanced electrical and lighting system designs. The solicitation was posted in late May 2026, with a response deadline set for early July 2026. Although specific location details and point of contact information are not provided, the contract aims to support airport infrastructure improvements by integrating federally compliant lighting and power systems that meet stringent regulatory requirements. This work is essential for maintaining safe and efficient airport operations, particularly under varying emergency and operational conditions.

General Info

Engineering design of FAA-compliant airport electrical, lighting, and emergency power systems in California.

Agency

California → AirportsView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 2026-WW-02.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Request for Proposals - On-Call Architectural and Engineering Services

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Airports
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Airports
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design of airfield lighting, navigational aids, terminal electrical systems, emergency power, and FAA-compliant lighting circuits.

More opportunities from California → Airports

Same awarding agency

NAICS: 236220
New
SLED
Construction Manager at Risk Services for Sacramento International Airport Airfield Maintenance Facility Project
Solicitation # 4722
The County of Sacramento is seeking a qualified Construction Manager at Risk (CMAR) to lead the Airfield Maintenance (AFMX) Facility project at Sacramento International Airport. The project involves the construction of a new 20,000 square foot pre-engineered steel structure designed to centralize maintenance equipment, vehicles, materials, and administrative functions. With an estimated construction budget of 18 million dollars, the selected CMAR will be responsible for all labor, materials, and management through a two-phase process consisting of a preconstruction phase and a construction phase governed by a Guaranteed Maximum Price (GMP). Eligible firms must hold a current Class B or higher California Contractors License, be registered with the California Department of Industrial Relations, and possess the ability to provide necessary performance and payment bonds. The selection process is based on a two-step evaluation involving a Statement of Qualifications (SOQ) review and interviews for the top-ranked respondents. Key requirements include adherence to California prevailing wage laws, compliance with the Americans with Disabilities Act, and the ability to operate within a secure, active airport environment. Statements of Qualifications must be submitted electronically by December 1, 2026.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 3 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS