Airport Taxiway "F" Realignment Phase 1

Closed
State & Local
Submission Closed
Solicitation #
3-04-0030-066-2026

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
FY27 Euclid Creek Fishway Construction
Solicitation # W912P427BA001
The U.S. Army Corps of Engineers, Buffalo District, is soliciting bids for the FY27 Euclid Creek Fishway Construction project located at the Euclid Creek Spillway in Cleveland, Ohio. The project scope includes the construction of a fishway within the existing spillway, necessary spillway modifications, and the construction of an access road, retaining wall, railing, and road gate. Additional requirements involve tieback design and installation for the retaining wall, site restoration, concrete removal, excavation, and dewatering. While tree felling is no longer a project requirement, the contractor remains responsible for removing felled trees from the site. The estimated magnitude of construction is between $5,000,000 and $10,000,000, and the procurement is a Small Business Set Aside - Total. The government intends to award a firm-fixed-price contract to the lowest priced responsive and responsible bidder. Bids must be submitted electronically via the PIEE suite by December 17, 2026, at 10:00 AM EST. The period of performance is expected to begin with a Notice to Proceed around January 26, 2027, with a total completion timeline of 600 calendar days. Notably, in-water work is generally prohibited from September 15 through June 30 annually, though specific waivers for 2026 and 2027 allow work during May-June and September-December. The project is subject to the Davis-Bacon Act and requires strict adherence to EM 385-1-1 safety standards and NIST SP 800-171 cybersecurity requirements.
W072 Endist Buffalo

POSTED

about 22 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The Airport Taxiway F Realignment Phase 1 project, solicited by the City of Prescott, involves the reconstruction of Taxiway F and Connector F3 at the Prescott Regional Airport to meet Airplane Design Group (ADG) 2 geometric standards. This first phase of a two-phase project aims to improve operational safety by correcting misalignments that have previously caused runway incursions. The scope of work includes civil works such as grading, drainage improvements, unclassified excavation, and asphalt concrete pavement removal, as well as the installation of airfield lighting, signage, utility adjustments, and pavement markings. The project is estimated at 2,175,000 dollars and is funded via an FAA Grant under AIP No. 3-04-0030-066-2026. The contract is governed by FAA design standards, the City of Prescott Standard Specifications, and the Maricopa Association of Governments (MAG) Uniform Standard Specifications. Key requirements include a mandatory pre-bid conference on September 3, 2026, with a bid submission deadline of September 24, 2026, via the OpenGov Procurement Portal. Performance is subject to the Davis-Bacon Act for wage determinations and the Buy American Preference. The contractor must adhere to a strict Construction Safety and Phasing Plan in accordance with FAA AC 150/5370-2G to ensure operational continuity. Work must commence within ten calendar days of the Notice to Proceed and be completed within a 45-calendar day window. Quality control is managed through a required Contractor Quality Control Program (CQCP) and independent geotechnical testing.

General Info

City of Prescott taxiway reconstruction project costing 2,175,000 dollars with 45-day completion window.

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

26
PDF, High priority: read this first1 page · checklist-nib
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this first21 pages · ifb
High
PDF, High priority: read this first21 pages · ifb
High
PDF, High priority: read this first46 pages · special-provisions
High
PDF, High priority: read this first6 pages · wage-determination
High
PDF, High priority: read this first6 pages · wage-determination
High
XLSX, High priority: read this first28 pages · bid-schedule
High
XLSX, High priority: read this first28 pages · bid-schedule
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this first15 pages · contract-document
High
PDF, High priority: read this first132 pages · specifications
High
PDF, High priority: read this first46 pages · special-provisions
High
PDF, High priority: read this first34 pages · contract-document
High
PDF, High priority: read this first54 pages · contract-document
High
PDF, High priority: read this first54 pages · contract-document
High
PDF, High priority: read this first174 pages · specifications
High
PDF, High priority: read this first174 pages · specifications
High
PDF, High priority: read this first28 pages · sow
High
PDF, High priority: read this firstplans
High
PDF, High priority: read this firstplans
High
PDF, High priority: read this first34 pages · contract-provisions
High
PDF, High priority: read this first3 pages · engineers-opinion-of-probable-cost
High
PDF, High priority: read this first28 pages · construction-safety-and-phasing-plan
High
PDF, Low priorityother
Low
PDF, Low priorityother
Low

Read all 26 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

91 mandatory

93 requirements in 10 areas

  • Compliance24 · 24 must
    020

    Contract Binding Condition

    Airport Taxiway _F_ Realignment Phase 1.pdf
  • Quality Assurance17 · 16 must
    067

    Quality Control Inspection Documentation

  • Submission13 · 13 must
    001

    Bid Validity Period

    Airport Taxiway _F_ Realignment Phase 1.pdf
  • 90 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 93 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Imperial Irrigation District – East Highline ReservoirOpen now, due in 10 days
  • Imperial Irrigation District – East Highline ReservoirOpen now, due in 10 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Airport
Contacts2 people available
OfficePrescott, AZ, 86301, USA

Interested Companies (50)

Advanced Drainage SystemsDenver, Colorado
Airside SolutionsAuburn, WA

See All 50 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Taxiway "F" is mis-aligned and has caused runway incursions with aircraft and ground vehicles. The project is the first phase of a two phase project to realign Taxiway "F" for improved operational safety.

More opportunities from Arizona → Airport

Same awarding agency

NAICS: 541620
SLED
IGM ON CALL PLANNING AND ENVIROMENTAL SERVICES
Solicitation # 2026-RFQ-021
The City of Kingman is seeking a qualified aviation consultant to provide on-call airport environmental and planning services for the Kingman Municipal Airport (IGM) and Industrial Park under solicitation 2026-RFQ-021. The scope of work includes master plan updates, environmental studies, feasibility studies, and the provision of Airport Layout Plan updates and environmental services for projects listed in the five-year Airport Capital Improvement Plan (ACIP). The selected firm will also assist the City in coordinating with the Federal Aviation Administration (FAA) and the Arizona Department of Transportation (ADOT) Aeronautics Group. The contract term is five years from the date of execution, with no set-aside status specified. Proposals must be submitted electronically via the OpenGov portal by December 8, 2026, and are limited to 40 pages of text. Evaluation is based on several factors, including the firm's ability to perform proposed projects, experience with airport and industrial park developments, key personnel qualifications, and knowledge of FAA and ADOT regulations. Required submission documents include a proposer signature page, a new vendor application, an IRS W-9 form, and evidence of an implemented Affirmative Action and Disadvantaged Business Enterprise (DBE) Outreach Plan. The City may conduct interviews as part of the evaluation process and will negotiate final terms and pricing following the Notice of Intent to Award.
Environmental Consulting Services

POSTED

26 days ago

DEADLINE

in 10 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS