Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Albion River Bridge Project

Forecast
2015042016State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Albion River Bridge Project, managed by Caltrans District 1 in Eureka, involves the replacement of the existing Albion River Bridge No. 10-0136. The project is located on State Route 1 between post miles 43.3 and 44.2 in the community of Albion, Mendocino County, California. This infrastructure project is classified under NAICS code 237310 and is overseen by key personnel including Associate Deputy Director Cherry Zamora and Senior Environmental Scientist Rachelle Estrada. The project has completed critical regulatory milestones in compliance with the California Environmental Quality Act and the Public Resources Code. A comprehensive Environmental Impact Report was prepared, which determined that the project would have a significant environmental effect. Consequently, the California Transportation Commission adopted specific mitigation measures, a monitoring plan, and a Statement of Overriding Considerations to proceed with the project. Administrative requirements included the payment of a 4,123.50 dollar environmental document filing fee to the California Department of Fish and Wildlife.

General Info

Caltrans District 1 will replace the Albion River Bridge on State Route 1.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 1 - Eureka
Contacts2 people available
OfficeN/A

Full Description

Show more
Replace the existing Albion River Bridge No. 10-0136, which is located in the community of Albion, California, with a new bridge.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 23 days
View Details

More opportunities from California → Caltrans, District 1 - Eureka

Same awarding agency

NAICS: 237310
SLED
Wilson Creek Restoration and SPGA Wall ProjectThe Wilson Creek Restoration and SPGA Wall Project, managed by Caltrans District 1, focuses on restoring US Highway 101 in Del Norte County to pre-storm conditions between post miles 12.6 and 13.2. The primary scope of work involves stabilizing the roadway through a modified alignment and the construction of two significant retaining walls: a 695-foot-long by 55-foot-high soldier pile ground anchor wall on the western shoulder and a 595-foot-long by 19-foot-high soil nail wall on the eastern shoulder. Additional technical requirements include the excavation of approximately 44,000 cubic yards of roadway, drainage replacement and realignment, the installation of rumble strips, and the application of Hot Mix Asphalt Type A over a Class 2 Aggregate Base. The final infrastructure will feature a 4-foot-wide median, an 8-foot-wide southbound shoulder, and a 10-foot-wide northbound shoulder, with aesthetic treatments such as tribal patterns applied to guardrails and walls. From a regulatory and environmental standpoint, the project has been issued a Negative Declaration under CEQA, determining that it will not have a significant effect on the environment. Key compliance measures include adhering to a Stormwater Pollution Prevention Plan, following Caltrans Temporary Pedestrian Access Routes Handbook guidelines, and implementing a Revegetation Plan. Strict biological constraints are in place to protect migratory birds, limiting vegetation removal to the period between September 16 and January 31, or requiring qualified biologist surveys if work occurs during breeding seasons. The project is also subject to Title VI non-discrimination policies and requires all equipment to be inspected for invasive species in accordance with Executive Order 13112. Terra McAuliffe serves as the primary lead agency contact for the project.
Highway, Street, and Bridge Construction

POSTED

4 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS