Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on August 4, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Alder Ridge Trail Restoration

Awarded
Ag-05GG-S-08-0041Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Construction of The Recharge Master Plan Update (RMPU) Basin Improvements Project - Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-rmpu-basin-improvements-project-montclair-basin-0
The Recharge Master Plan Update Basin Improvements Project, managed by Granite Construction Company, involves the construction of two drop inlet diversion structures within the San Antonio Creek Channel in Montclair, California. The scope of work includes excavating 8 to 10 feet below the channel floor across a 25-foot width, installing steel debris grates, and fitting wall-mounted steel gates on the east sides of the structures. Additionally, the project requires the installation of 4-foot-diameter discharge pipelines leading to Montclair Basins 2 and 3, which will be covered by 3 feet of soil and terminate in concrete outlet structures designed for flow dissipation. Technical requirements include the implementation of complete electrical, instrumentation, and SCADA integration to manage gate actuation. Programming for these systems is strictly limited to approved integrators, specifically Technical Systems, Inc. or E Technologies Group. This solicitation is categorized under NAICS code 237990 and includes a set-aside for Disadvantaged Business Enterprises. Interested parties must coordinate with the primary point of contact, Andrew Burk, regarding the submission process.
Granite Construction Company

POSTED

about 1 hour ago

DEADLINE

in 1 day
NAICS: 237990
New
SLED
6893
Solicitation # 49749
Solicitation 49749, titled Taxiway Light Bases and Extensions at Logan International Airport, is a procurement opportunity issued by the Massachusetts Port Authority for construction and equipment acquisition. The project is funded under Airport Improvement Program Project Number 3-25-0010-XX and requires the delivery of materials to the Massport warehouse at the Central Stockroom in East Boston, Massachusetts. Bidders must provide at least seven calendar days of advance notice before shipping materials, which should be delivered in the fewest bulk shipments possible. The award will be based on the best interest of the Authority rather than the lowest cost. Compliance requirements are extensive, including adherence to the Davis-Bacon Act for labor wages, the Occupational Safety and Health Act of 1970, and Clean Air and Water Pollution Control requirements for contracts exceeding 100,000 dollars. Bidders must submit specific Buy American certifications via Appendix IIC-1 or IIC-2 to be considered responsive. Additionally, the contract mandates compliance with Civil Rights Title VI, Section 504 of the Rehabilitation Act, and various federal prohibitions regarding foreign-owned entities, specific telecommunications equipment, and unmanned aircraft systems. Preference in hiring will be given to qualified veterans and disabled veteran-owned small businesses.
Massachusetts Port Authority - Goods & Services

POSTED

about 1 hour ago

DEADLINE

in 7 days
NAICS: 237990
New
SLED
9585 - Castle Creek Channel Improvements at Warner Park
Solicitation # 9585
The City of Madison is soliciting bids for Contract 9585, Project 13863, to perform channel improvements at Castle Creek in Warner Park, Wisconsin. The scope of work involves reconstructing an existing concrete lined channel by lowering and widening it from Sherman Avenue to Warner Lagoon. Key activities include the removal of concrete, native plant restoration, storm sewer improvements, and the potential removal, salvage, and reinstallation of existing bridges. The project is supported by a Pre-Disaster Flood Resilience Grant from the Wisconsin Department of Military Affairs totaling 1,842,719.55 dollars and requires compliance with permits from the US Army Corps of Engineers and the Wisconsin Department of Natural Resources. Bidders must be pre-qualified by the Board of Public Works, specifically in category 246 for Ecological Restoration if the prime contractor does not hold that qualification. The solicitation mandates a 12 percent Small Business Enterprise goal and requires a 5 percent bid bond. Proposals must include a lump sum bid and detailed unit prices submitted electronically via Bid Express by November 5, 2026. Award criteria are based on a best value determination, and the successful contractor must adhere to strict erosion control standards and a one-year guarantee for seeded areas. Construction is required to commence within seven calendar days of a written notice to proceed.
City of Madison

POSTED

about 5 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Alder Ridge Trail Restoration project, solicitation number Ag-05GG-S-08-0041, was awarded on July 31, 2008, by the USDA Forest Service's Okanogan-Wenatchee National Forest. Located in Leavenworth, Washington, within the Lake Wenatchee Ranger District, the project focuses on the restoration of existing trails and the implementation of specific infrastructure improvements. The scope of work includes general trail restoration, the construction of drainage dips, and the reinstallation of grid pavement approach blocks. Technical specifications mandate a trail width of 30 inches, a 3-inch crown for restored sections, and specific grade dip requirements to ensure proper drainage and stability. The contract includes a base bid for primary restoration tasks and mobilization, along with a separate pricing option for the Option 1 Area involving Trail 1548. Project documentation highlights the necessity of obtaining a pass from the Wenatchee River Ranger District for access to upper trail sections due to seasonal closures above Faultline Road. The procurement process involved multiple amendments to correct the schedule of items and provide updated bidding tables to ensure accurate offeror submissions.

General Info

USDA Forest Service contract for Alder Ridge Trail restoration and infrastructure in Leavenworth, Washington.

Contract Value

$21,000

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

This project is located north of Leavenworth, Washington and northeast of Lake Wenatchee in Chelan County. From Leavenworth he, LEAVENWORTH, WA, 98826, USA

Set-Aside

NONE

Award Issued Date

Documents

10
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
DOC, High priority: read this firstrfq
High
PDF, High priority: read this first2 pages · amendment
High
PDF, High priority: read this first2 pages · amendment
High
PDF, High priority: read this first1 page · sow
High
DOC, High priority: read this first3 pages · specifications
High
PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Jul 31, 2008 to Jul 30, 2008. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Okanogan-Wenatchee National Forest
Contacts2 people available
OfficeWENATCHEE, WA, 98801, USA
Office AddressWENATCHEE, WA, 98801, USA
Contacts
Mariah R MorrisContract Specialist
Ellen A KinamonProcurement Technician

Full Description

Show more
The Alder Ridge Trail Restoration project will consist of trail machine maintenance of existing trail drainage structures, adding new drainage structures, the removal of trail slough and berm, and trail trenching where needed, on approximately 8 miles of the Alder Ridge Trail. Items of work will include: removing slough and berm, filling ruts and troughs, restoring an estimated 60 existing trail-way drainage structures, and the construction of an estimated 500 new trail-way drainage structures. This project is located north of Leavenworth, Washington and northeast of Lake Wenatchee near the Alder Ridge Trailhead, Chelan County. The performance period is 100 calendar days. The Government's cost estimate is between $25,000 and $100,000. A 100% payment bond or irrevocable letter of credit is required after award. The NAICS code is 237990. No set asides will be utilized. No formal site visit is anticipated. The upper portions of the Alder Ridge will have snow until mid-July therefore visits to this portion should be made after this time.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS