Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on October 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Alternating Current (AC) Distribution Materials

Closed
374951_MRFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the procurement of Alternating Current (AC) Distribution Materials for the Proton Improvement Plan II (PIP-II) project at Fermilab, a DOE contractor located in Batavia, Illinois. The solicitation, issued by Fermi Forward Discovery Group, LLC, is a firm-fixed-price request for proposals (RFP) with the solicitation number 374951_MR, posted on October 30, 2025, and due by November 20, 2025. It emphasizes compliance with specific technical standards, including UL listing requirements for electrical components such as EMT tubing, conduit, fittings, and wiring, ensuring that all materials meet safety and quality specifications outlined in the general specifications documents. The procurement supports upgrades to Fermilab’s accelerator complex, with a focus on acquiring high-quality electrical distribution components like cable trays, conduit connectors, barrier strips, and THHN copper wires, with detailed unit pricing sheets provided for vendors to submit their quotations. The contractual framework includes comprehensive terms and conditions governing supply, including compliance with federal regulations, export/import controls, domestic sourcing preferences, and subcontractor certifications. The documents emphasize the importance of certifications such as the Subcontractor Annual Representations & Certifications (SARC) form, and specify that all proposals must adhere to the outlined technical, legal, and safety standards. The procurement process also incorporates provisions for proposal evaluation, delivery timelines, and the requirement for small business subcontracting plans, reflecting Fermilab’s commitment to compliance, safety, and quality assurance in supporting its scientific infrastructure upgrades.

General Info

NAICS

423610 - Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers

Place of Performance

Batavia, IL, USA

Set-Aside

NONE

Documents

7
PDF, High priority: read this first12 pages · proposal-certifications
High
PDF, High priority: read this first20 pages · contract-document
High
XLSX, High priority: read this first15 pages · other
High
PDF, High priority: read this first8 pages · rfp
High
PDF, High priority: read this first7 pages · sow
High
PDF, Low priority1 page · other
Low
PDF, Low priority6 pages · other
Low

Read all 7 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Electrical Connector Body Receptacles SupplyOpen now, due in 15 days
  • Structural Aluminum Alloy 7075/T-6 Angle SupplyOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts1 person available
OfficeBatavia, IL, 60510, USA

Full Description

Show more

FNAL requires the acquisition of Alternating Current (AC) Distribution Materials

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 236210
New
Federal
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Solicitation # RFP-376508-CD
The Central Utility Building (CUB) Addition and Renovation project, designated as UIP Subproject 1-CUB, involves the expansion and revitalization of the CUB at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope of work includes the construction of a building addition to accommodate new chillers, selective demolition of existing infrastructure, and comprehensive upgrades to the heating hot water, chilled water, and electrical systems, including the installation of medium voltage switches and transformers. The project is critical to Fermilab's mission as the CUB provides essential utility services to various lab buildings. This is a firm-fixed-price contract with no set-aside used. Construction is strictly constrained by the accelerator shutdown window, with on-site efforts anticipated to start on January 1, 2028, and conclude by January 1, 2030, with a final completion deadline of October 1, 2029. Key milestones include the issuance of the Notice to Proceed by December 30, 2027, and the completion of the CUB extension and upgrades by September 28, 2029. Award selection is based on a best-value tradeoff method where technical factors are significantly more important than price. Offerors must meet stringent pass-fail requirements, including a minimum current ratio of 1.20, an aggregate bonding capacity of at least $100 million, and the provision of audited financial statements for the past three fiscal years.
Industrial Building Construction

POSTED

6 days ago

DEADLINE

in 22 days
View Details
NAICS: 332999
Federal
WFE Solenoid/Corrector Magnet Spares
Solicitation # 389116swk
Fermilab, managed by the Fermi Forward Discovery Group (FFDG) for the Department of Energy, is soliciting proposals for the design, manufacturing, fabrication, and delivery of two solenoid magnets with integrated dipole corrector magnets. These components are critical for steering, focusing, and matching a 30 keV H+ beam from an ion source into a Radio Frequency Quadrupole accelerator. The scope of work includes comprehensive quality control, magnetic testing, and the provision of detailed documentation such as final design reports, material certifications, and QC fabrication and inspection plans. Deliverables must be shipped F.O.B. Fermilab in a single batch, with strict packaging requirements to prevent corrosion and structural damage, including the use of shock indicators for loads exceeding 10 G. The procurement utilizes a best value trade-off source selection process, where technical proposals, infrastructure capabilities, schedule (via Gantt chart), and past experience are weighted as significantly more important than cost. Proposals are due by January 5, 2027, at 5pm Central, with a prior question deadline of November 30, 2026. Awardees must undergo a series of program reviews, including an initial kickoff, a Preliminary Design Review at 50% maturity, and a Final Design Review at 90-100% maturity before production begins. There is no specified set-aside status for this solicitation.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

8 days ago

DEADLINE

in about 1 month
View Details
NAICS: 23822
Federal
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Solicitation # 378854_MR
This project involves the fabrication and installation of a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope of work includes the installation of two 50 hp centrifugal pumps, a shell and tube heat exchanger, a 250-gallon expansion reservoir tank, and various process loop equipment such as a deionization skid, particulate filter, and dissolved oxygen removal skid. The contractor is responsible for providing all piping, hardware, process instrumentation, structural supports, and foundation bases, as well as performing electrical installations. The project is unrestricted and will be awarded based on a lowest price-technically acceptable (LPTA) selection process. The period of performance is 180 calendar days from the receipt of the Notice-to-Proceed. Key technical requirements include compliance with ASME B31.3 and B31.9, as well as Fermilab's specific pressure testing and piping manuals. Contractors must provide a project-specific quality control plan and adhere to strict safety standards, including 10 CFR 851 and FESHM Chapter 7010. Proposals must be submitted in two separate parts—technical and business/price—by December 3, 2026, at 2:00 p.m. CDT. Required certifications include the Buy American Act, DEI discrimination compliance, and the provision of performance and payment bonds. Access to the secured DOE site requires U.S. citizenship, a REAL ID, and an access request submitted at least seven days in advance.

POSTED

9 days ago

DEADLINE

in 8 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS