Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on May 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

AM26-91 Stream Crossing Restoration – Peoa, UT

Closed
AM26-91State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 15 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The State of Utah Division of Purchasing, in coordination with the Division of Wildlife Resources, is soliciting bids for the restoration of a low-water stream crossing located at 40.707130, -111.330229 in Peoa, Utah, under solicitation number AM26-91. The project requires the complete rehabilitation of a 50-foot section of degraded stream crossing, including excavation, installation of 6 GEOWEB GW30V geocell panels with a 4-inch cell depth and 8' by 29' dimensions, placement of 7.6 to 9.1 tons of 1.5–4" minus gravel, and 12 tons of 4–6" coarse aggregate. Work must comply with strict erosion and sediment control BMPs to protect the spring channel and downstream Sage Creek, and all equipment must be suitable for riparian environments, including data-logging GPS for tracking. The contractor must mobilize and remain on-site full-time during normal working hours until all phases—earthwork, armoring, and capping—are fully complete, with no job hopping permitted. A mandatory site visit is scheduled for June 5, 2026, at 11 a.m., and a pre-work conference is required before any ground disturbance. All work must be completed and invoiced by June 30, 2026, with time being of the essence. The contract will be awarded to the lowest cost responsive and responsible vendor, with no weighted evaluation factors—responsiveness and responsibility are pass/fail gates. Bids must strictly conform to the solicitation requirements; any conditional proposals, modifications to scope, added terms or conditions, or deviations from the standard terms will result in immediate disqualification. The contractor must guarantee pricing for the entire project duration and is responsible for securing all necessary permits and complying with state and federal regulations, including Utah Code provisions on forced labor, restricted foreign entities, anti-boycott conduct, and public records under GRAMA. Mandatory insurance requirements include workers’ compensation and commercial auto liability coverage with a minimum of $1 million per occurrence. Contractors must register with Utah’s Status Verification System and require subcontractors to do the same, under penalty of perjury. Invoices must be submitted within 30 days of delivery and must reference the purchase order number; payments are due within 30 days of receipt of a correct invoice, with interest allowed under the Utah Prompt Payment Act

General Info

Utah seeks lowest-cost vendor for Peoa stream crossing restoration; mandatory site visit June 5.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

4

AM26-91 Stream Crossing Restoration Scope of Work

DOCX, High priority: read this firstsow
High

AM26-91 Stream Crossing Restoration Scope of Work

DOCX, High priority: read this firstsow
High

Attachment A-PO Terms and Conditions

DOCX, High priority: read this first5 pages · contract-terms-and-conditions
High

Vendor Prerequisites for IFB Agency Solicitation

PDF, Low priority7 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jun 12, 2026 to Jun 10, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
Contacts
Albert Mosley

Full Description

Show more
Issuing Procurement Unit: State of Utah Division of Purchasing Conducting Procurement Unit: Division of Wildlife Resources
The purpose of this IFB is to enter into a contract to provide: Restoration work on a low-water stream crossing. Mandatory Site Visit: on Friday, June 5th at 11 am .
It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor.
The methodology or formula that will be used to determine the number of contract awards is: Lowest Cost.
Length of Contract: Duration of the Project.
Vendor must guarantee its pricing for the duration of the project.

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

1 day ago

DEADLINE

in 9 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS