American Eagle Avenue Pavement Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The American Eagle Avenue Pavement Rehabilitation Project, identified by solicitation number 50-2025-159, involves comprehensive roadwork on a 0.6-mile segment of American Eagle Avenue from Ward Avenue to Shearwater Drive in Patterson, California. Managed by the City of Patterson, the project focuses on pavement rehabilitation within the city right-of-way. Key technical requirements include full depth reconstruction, overlay with dig-outs as needed, curb ramp upgrades, and the raising of all manhole and valve covers to the final grade. The scope also includes cold planing at existing road and gutter tie-ins, as well as the removal of old markings and the installation of new thermoplastic striping and markings following the overlay. The project is categorized as a forecast under NAICS code 237310 and is led by City Engineer Tiffany Rodriguez. From an environmental standpoint, the project is categorically exempt from the California Environmental Quality Act under Class 1 - 15301(c), as it constitutes preventive maintenance of existing public facilities. The official notice of exemption was filed on August 29, 2025, with the project posted on October 9, 2025.

General Info

Pavement rehabilitation of 0.6 miles on American Eagle Avenue in Patterson, California.

Agency

California → City of Patterson

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

American Eagle Avenue between Shearwater Drive and Ward Avenue, Patterson, CA, 95363

Set-Aside

NONE

Documents

(1)

NOE American Eagle Avenue Pavement Rehabilitation Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Patterson
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Patterson
Office AddressN/A
Contacts
Tiffany RodriguezCity Engineer

Full Description

Show more
This project consists of a pavement rehabilitation, including full depth reconstruction, overlay with dig-outs as needed, curb ramp upgrades, and striping along American Eagle Avenue from Ward Avenue to Shearwater Drive. The road segment where construction will occur spans approximately 0.6 miles. The existing road will be cold planed where tying into the existing road sections and along existing gutter sections. All existing striping and markings will be removed in preparation of an overlay, disposed of in accordance with regulations, and replaced with thermoplastic striping and markings after the completion of an overlay. All existing manhole and valve covers are required to be raised to the final grade. All improvements are located within the City of Patterson right-of-way.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS