Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on June 2, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

AN/TYQ-23 Modular Control Equipment (MCE)

Closed
FA821711R090511Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Fire Alarm engineering for Lewis County
Solicitation # 2026-RFQ-040
Lewis County is soliciting qualifications under solicitation 2026-RFQ-040 for a professional engineering firm to provide comprehensive design and engineering services for fire alarm systems. The project encompasses several County-owned facilities, including the IT Building, Historic Courthouse, Health Building, and Lewis County Jail. The selected firm will be responsible for conducting on-site evaluations to determine the remaining useful life of existing systems, assessing code compliance with NFPA 72, IBC, and IFC standards, and developing bid-ready construction drawings and technical specifications. All designs must be stamped by a licensed electrical engineer familiar with Washington State fire alarm requirements and must integrate smoothly with existing infrastructure to ensure standardized maintenance and operations. Proposals are due by November 10, 2026, via the OpenGov platform and will be evaluated by a committee of at least three County employees using a points-based system. The evaluation criteria are equally weighted at 20 percent each across four categories: firm qualifications (including NICET certifications and licensed engineer availability), responsiveness and capacity to begin work within 30 days, regulatory compliance and permitting records, and the clarity and detail of blueprint designs. Applicants must provide a statement of qualifications, three public agency references from the last five years, and resumes of key personnel. The contract is administered by Matt Patana, Capital Infrastructure Specialist, based in Chehalis, Washington.
Capital Infrastructure

POSTED

about 16 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
International
Provision of Consulting Services for Regional Basement Flooding Mitigation Program Strategic Plan
Solicitation # P-1353-26
The Region of Halton is soliciting proposals for a consulting firm to conduct a comprehensive review of its existing Basement Flooding Mitigation Program and develop a three-year Strategic Plan. The primary objectives are to reduce basement flooding risks, enhance wastewater system resilience, and decrease wet-weather flows. The project is expected to be completed within nine months of kick-off and includes key deliverables such as a current-state assessment report, a prioritization framework for initiatives, a final strategic plan with an implementation roadmap, and a performance measurement and reporting framework. The selected consultant must provide a Project Manager with PMP certification or equivalent credentials. The contract will be awarded based on a scoring system where the technical proposal accounts for 80 points and the cost proposal accounts for 20 points. Proponents must achieve a minimum technical score of 70% to be considered for award and may be invited to a 30-minute presentation. Mandatory submission requirements include a technical proposal, a signed Vendor Code of Conduct Acknowledgement Form, and a cost proposal submitted via the online bidding system by November 12, 2026. The agreement is governed by a modified Standard Agreement and Supplementary Conditions, requiring the consultant to maintain specific insurance coverages: 5 million dollars for Commercial General Liability, 2 million dollars for Automobile Liability, and 2 million dollars for Professional Liability. Additionally, the consultant must provide a WSIB clearance certificate upon award and with every monthly electronic invoice. All produced materials remain the sole property of the Region of Halton, and deliverables must comply with the Ontario Building Code and the Accessibility for Ontarians with Disabilities Act.
Region of Halton

POSTED

about 17 hours ago

DEADLINE

in 23 days

General Info

Agency

N/A

NAICS

541330 - Engineering Services

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Response deadline changed from Jun 9, 2011 to Jun 16, 2011. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Anthony MonsivaisContract Negotiator
Jody L LindleyContract Specialist

Full Description

Show more
This notification is a request for information to identify potential contractors who have the skills, experience, and knowledge required to successfully complete this effort, and does not constitute a commitment, implied or otherwise, that a procurement will be accomplished. This is not a request for proposal or invitation for bid, and it shall not be construed as a commitment by the Government since the Government will not pay for any cost incurred by the Contractor in providing this information. If a solicitation and award of a contractual document takes place, it may be as a new contract, against an existing delivery order contract, and/or any other contractual vehicle determined appropriate by the Government. To be considered as a potential source for this requirement, a Contractor will be required to submit data in response to any future solicitation (which would include final/official requirements that are more detailed than what is identified in this Sources Sought Synopsis). The Government does not intend to pay for any cost incurred by the Contractor in providing this information. This Sources Sought Synopsis constitutes a Request for Information (RFI) to assist the United States Air Force (USAF) in Market Research of Industry to identify potential sources that may meet requirements for Control and Reporting Center (CRC) Site Support. The CRC was formerly known as Ground Theater Air Control System (GTACS). Description The purpose of this effort is to provide engineering and technical services to design three modifications to the AN/TYQ-23(V)5. These efforts include analysis of the current design, development of the new design, delivery of production representative new design hardware, validation testing within the end item, and delivery of redline revisions to existing government documentation to reflect the new design. The AN/TYQ-23 Modular Control Equipment (MCE) program provides the US Air Force with a transportable automated air command and control system for controlling and coordinating the employment of aircraft and air defense weapons. The AN/TYQ-23(V)5 fielded circa 2004 and the modifications above are to address obsolescence issues that have developed since fielding. These issues have not previously been addressed. The AN/TYQ-23(V)5 contains four Operator Console Units OCUs. Two of the OCUs, are master OCUs, are located on the road side of the Tactical Air Operations Module TAOM, and contain peripheral bay expansion chassis (P/N: BT404-ESY) and a VME card cage (P/N: 11VS-0615-RV21J12A-P750-LDS). The peripheral bay expansion chassis houses four removable mass media storage devices: a hard drive (P/N: TP6MD36S-KS), CD-RW drive (P/N: TP6-MPCDW-00), 8mm-tape drive (P/N: TP6-MP8MM-00), and 3.5 inch floppy drive (P/N: TP6-MPFLP-00). Each drive is removable for secure storage. The VME card cage houses the Tactical Processor Unit (P/N: V5C/N256-850). and the BUS Communications Controller (P/N: 295786-100). The three design modifications address obsolescence issues with the following components of the AN/TYQ-23(V)5: - System Server Unit (SSU) Peripheral Suite Replacement. The purpose of this sub-task is to identify a replacement for the peripheral suite of devices that support the SSU Server Processor. The peripheral suite of devices includes a removable hard disk drive, a CD-RW drive, an 8mm Digital Audio Tape drive, a 3.5 in Floppy Disk drive, the associated peripheral docking bay, and the related power and data cables. The drives in the Peripheral Suite are Small Computer System Interface (SCSI). - Single Board Computer (SBC) Circuit Card Assembly (CCA) Replacement. The purpose of this task will primarily involve identification, integration, and test of a suitable replacement of the current Single Board Computers. Ideally, one SBC would be identified that could perform as either CCA (TPU or DP). - BUS Communication Controller (BCC) CCA Replacement. The BCC CCA is a component of the SSU. It interfaces the Digital Data Bus DDB to the Server CCA to form the primary connection between the Computer units and the SSU. The purpose of this sub-task is to develop a form, fit, function, and interface replacement for BCC (CAGE: 06481, P/N: 8940211). The schedule for performance is 8 months After Receipt of Order (ARO) with the last two months reserved for Government review and contractor rework of deliveries (if required). SSU Peripheral Suite Replacement The SSU peripheral suite replacement shall install within the existing SSU footprint (consisting of the VME rack and peripheral bay area). The design shall ensure that the required capabilities provided by the current suite are provided by the replacement suite. The design should favor the use of the VME backplane connections over front panel connections where practical. SBC CCA Replacement In addition to being a form, fit, function & interface equivalent, the replacement SBC CCA shall be fully interoperable in the AN/TYQ-23(v)5 TAOM system that may contain any combination of the original SBC CCA and the replacement SBC CCA developed under this effort. BCC CCA Replacement In addition to being a form, fit, function & interface replacement, the replacement BCC CCA shall be fully interoperable in the AN/TYQ-23(v)5 TAOM system that may contain any combination of original BCC CCA (P/N 295768-10x), the first redesigned BCC CCA (P/N 88940211-000x), and the replacement BCC CCA developed under this project. Request Each Interested Contractor: Please address each of the following by restating them (one at a time) and providing your response under each specific one: ? Address your capabilities to accomplish the service and provide highlights of successful past experience on similar government contracts within the past 10 years. List name of contract, contract number, and assigned Administrative Contracting Officer (ACO) name and phone number for past experience. ? Address your capabilities of program management, research, engineering, hardware and software analysis and design, and limited procurement and/or production required to develop, produce, test, and document the sub-task designs. ? Address your ability to provide the following: - An Analysis of Alternatives for presentation to the government for final sub-task design selection. - Test procedures and criteria to prove the final sub-task design's suitability based on the baseline OM system's performance, capabilities, and standards. - An overall assembly drawing detailing the final sub-task design. - Production level engineering drawings for all developmental parts included in the final sub-task design. - Specification control drawings for all major non-developmental commercial items included in the final sub-task design. - Redline revisions to the current system engineering drawings reflecting the final sub-task design. - Redline revisions to the current system Technical Orders reflecting the final sub-task design. - A draft installation Time Compliance Technical Order (TCTO) detailing installation of the final sub-task design, written to allow technicians at the USAF organizational level to accomplish the installation. - A recommendation for the composition of a TCTO Kit to support installation of the final sub-task design. - All source code, executable code, and other software products developed for use in the final sub-task design. ? A Rough Order of Magnitude cost estimate for the production/procurement of additional units. ? Describe your current capability and experience with meeting engineering and design requirements such as those identified in this sources sought synopsis. ? Identify company's size and socio-economic status given the above identified NAICS Code, and if contractor is part of a small business/socio-economic program, provide verification. ? If contractor believes that this requirement has a primary purpose of Service (instead of Supply) and identifies the contractor as a Small Business, indicate (with supporting rationale) if/how the contractor would be a Small Business given the restrictions identified in sub-paragraph (b)(1) of FAR Clause 52.219-14 (which states that at least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern (meaning the prime contractor)). Also, identify (with rationale), if the Services Contracting Act would (or would not) be applicable based on the "service employee" definition under FAR 22.1001 and Part 541 of Title 29, Code of Federal regulations. ? Identify (with rationale) if the Services Contracting Act would (or would not) be applicable based on the "service employee" definition under FAR 22.1001 and Part 541 of Title 29, Code of Federal regulations. ? Identify (with rationale) if your company does not find the identified delivery schedule reasonable. ? Identify ability to provide source control/vendor control drawings that provide form, fit, function and specification so that the Government can always identify sources of supply and procure parts in the event that manufacturing sources become scarce or unavailable. ? Verify willingness and capability to deliver form fit function modification in this RFI; including drawings, data and software necessary for the maintenance and/or competitively contracted maintenance, and to have a complete competitive technical data re-procurement package. ? Provide programmatic position. If Contractor disagrees or has questions on programmatic position, please contact the Contracting Officer identified above. The development requirement has "end item" as its primary purpose. ? This requirement is a "Developmental effort." Contractor must state if it agrees or disagrees that this is a developmental effort; along with supporting rational. ? Given the definitions in FAR Part 2.101, identify (with rationale) if you agree with how the RFI Description Section has identified the requirement as either commercial or non-commercial. ? Will the Contractor's solution be a "prototype/pre-production unit." Provide supporting rationale that your company can meet the requirements identified in this sources sought synopsis. Specifically, include a description of (1) company current capability and experience developing similar systems; (2) company current experience with technical requirements identified for this requirement. Responses must clearly indentify all data rights assertions on any and all software, hardware, drawings and data that would be included in the technical data package. The response must identify, as a Rough Order of Magnitude (ROM), what percentage of the total cost/price would be for furnishing all drawings, data, and software in the manner indentified above; this percentage must only include the portion of the drawing-data-software cost/price that is not part of the actual development effort (e.g. intrinsic value for extra rights on proprietary drawings-data-software that the contractor already has). Please Respond by email to: Jody Lindley at jody.lindley@hill.af.mil and Anthony Monsivais at Anthony.monsivais@hill.af.mil Responses are due no later than close of business 16 June 2011. No phone responses will be accepted. All responses shall be unclassified and reviewed (prior to submission to the Government) to ensure that there are no operational sensitivities. Note that a Request for Proposal (RFP) would include requirements that are more detailed than what is identified in this Sources Sought Synopsis. Response Due Date: 16 June 2011 Response Due Time: 1600hrs/4:00PM MST This is not a Request for Proposal (RFP) or Invitation for Bid (IFB), nor is it to be construed as a commitment by the Government; it is only to obtain market capabilities/industry comments and is to be used for informational purposes only. The Government does not intend to make an award on the bases of this sources sought synopsis/request for information, nor will the Government pay for the information solicited herein. Copies of the submitted information will be reproduced and review may be used to develop a Request for Proposal.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS