Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Andres Duarte School Project

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Andres Duarte School Project encompasses the redevelopment of a six-acre western and seven-acre eastern portion of a site in Duarte, California, involving the relocation of existing school facilities and sports infrastructure to make way for a mixed-use residential and public park complex. The Duarte Preschool and Andres Duarte Arts Academy buildings will be relocated, and the Otis Gordon Sports Park structures, along with an expiring wireless communications facility, will be removed. The residential component includes 169 townhome units distributed across 25 three-story buildings, each with a maximum height of 38 feet, offering configurations ranging from three to four bedrooms and two and a half to three and a half bathrooms. A 3,155-square-foot leasing and recreation building will feature an exercise room, lounge, dining area, restrooms, and an outdoor pool and deck. The project will provide 377 total parking spaces for residents, plus 59 spaces for the redeveloped public park, which includes ADA-compliant parking, bike racks, recreational fields, open turf areas, picnic and barbecue shelters, restrooms, a snack shack, an outdoor gym, a resurfaced tot lot, and internal walkways connecting to residential areas and the pedestrian plaza at Central Avenue and Crestfield Drive. Landscaping with trees, shrubs, and groundcover, along with ambient and safety-focused outdoor lighting, will enhance the site. The development is facilitated through a 99-year ground lease between the Duarte Unified School District and Crestfield Townhomes, LLC, which includes a $1 million upfront payment and annual rent of $450,000, escalating at 2.5% each year. Approximately $4 million in public park improvements are required, and all aspects of the project comply with CEQA standards, the Final Environmental Impact Report, and ADA accessibility requirements. The Duarte Unified School District and City of Duarte serve as the lead agencies responsible for oversight, inspection, and final acceptance, ensuring alignment with approved mitigation measures and environmental conditions. No federal procurement clauses or traditional contract line-item pricing structures apply, as this is a public-private land development arrangement governed by state law and local environmental review processes.

General Info

Duarte School site redeveloped into 169 townhomes and public park via 99-year lease with $1M upfront and $450K annual rent.

Agency

California → City of Duarte

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Duarte, CA, 91010

Set-Aside

NONE

Documents

(3)

Notice of Determination for Andres Duarte School Project

PDFnotice-of-determination

Final Notice of Determination - Andres Duarte School Project 2

PDFnotice-of-determination

Notice of Determination - Andres Duarte School Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Duarte
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Duarte
Office AddressN/A
Contacts
Tiffany BellAssistant Superintendent, Business services
Craig HensleyCommunity Development Director
Crestfield TownhomesProject Applicant

Full Description

Show more
The Project involves demolition, relocation, and/or redevelopment of the existing MIT School buildings and Otis Gordon Sports Park structures, and construction of multifamily residential buildings comprised of 169 units within 25 buildings, 1 leasing office/recreation building, 377 parking spaces, and associated improvements. The Project also involves the approval of a Joint Occupancy Development Agreement and Ground Lease between the District and Crestfield Townhomes, LLC.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Both structures will feature shallow foundations, structural steel framing, standing-seam roofs, and a combination of masonry and metal panel exterior walls. The scope of work is extensive, covering everything from demolition of an existing engineering facility to comprehensive site improvements, including stormwater retention, utilities, landscaping, and parking. Bids are requested across numerous trades, including concrete, masonry, electrical, mechanical, plumbing, and structural steel. The project adheres to Davis Bacon Wage Rates and is exempt from sales tax. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in 2 months
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the construction of the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project involves a comprehensive scope of work over 1828 calendar days, including the construction of six Containerized Long Weapons Storage units and three earth-covered high-explosive magazines equipped with overhead cranes. Additional structures include a new Ordnance Operations building, a Truck Inspection area, and a Sentry building. The project also requires the demolition of 18 existing magazines and two specific buildings, along with extensive site preparation involving rock excavation, grading, and wetland mitigation. Technical requirements include specialized foundation features such as rigid inclusions and load transfer mats, as well as the installation of grounding, lightning protection, and intrusion detection systems. The scope covers a wide array of trades, including structural steel, electrical utilities, plumbing, mechanical systems, and paving for access roads and loading areas. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and documentation.
J & J Contractors, Inc

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS