Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Arcade-Cripple Creek Trail (Sylvan Road to Stock Ranch) Extension Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Citrus Heights plans to construct a 0.5-mile extension of the Creek Corridor Trail, connecting the existing Stock Ranch Trail behind the Costco/Walmart shopping center to Sylvan Road. This segment is part of a larger 16-mile trail network designed to improve regional pedestrian and bicycle connectivity. The project will replace existing dirt and narrow concrete pathways with a new Class I multi-use trail that meets Americans with Disabilities Act standards, ensuring safe and accessible use for all community members. The extension will run through the Arcade Creek greenbelt, enhancing recreational opportunities and providing a continuous, protected route for non-motorized transportation. This initiative aims to strengthen the trail system by filling a critical gap in the corridor, promoting active lifestyles, and improving access to natural areas within the city. The project is currently in the forecasting stage, with no solicitation issued yet, and is managed by the City Engineer’s office. All correspondence and inquiries should be directed to Leslie Blomquist, City Engineer, via email or phone provided in the public record. The planned construction site is located within Citrus Heights, California, in the 95621 ZIP code, and further details can be accessed through the project’s official link on the CEQA Net database.

General Info

City to build 0.5-mile ADA-compliant trail extension connecting Stock Ranch Trail to Sylvan Road through Arcade Creek greenbelt.

Agency

California → City of Citrus Heights

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Citrus Heights, CA, 95621

Set-Aside

NONE

Documents

(1)

Notice of Determination for Arcade Cripple Creek Trail Extension Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Citrus Heights
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Citrus Heights
Office AddressN/A
Contacts
Leslie BlomquistCity Engineer

Full Description

Show more
The City proposes to construct a 0.5-mile addition to the planned 16-mile Creek Corridor Trail in Citrus Heights. The Project will extend east from the existing Stock Ranch Trail behind the Costco/Walmart shopping center to Sylvan Road. The purpose of this Project is to construct one of the several planned segments by replacing dirt and narrow concrete paths with an Americans with Disabilities Act-compliant Class I multi-use trail. This trail extension is needed to enhance pedestrian and bicycle connectivity, provide a safe recreational facility, and improve access through the Arcade Creek greenbelt.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The scope of work involves mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and the installation or reworking of stone to fill voids. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The project is located in Haleiwa, Oahu, Hawaii, and is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certified entities under NAICS code 237990. The contract requires a rigorous quality control and inspection process consisting of preparatory, initial, and follow-up phases, culminating in punch-out, pre-final, and final acceptance inspections. Contractors must adhere to specific ASTM standards for stone materials and comply with USACE EM 385-1-1 safety regulations, including the appointment of a Site Safety and Health Officer with an OSHA 30-hour certification. Key personnel, such as the Project Manager and Quality Control System Manager, are subject to approval by the Contracting Officer. Financial terms include monthly invoicing and a liquidated damages penalty of 2,297 dollars per calendar day of delay. Bidders must provide a bid guarantee and subsequent performance and payment bonds to ensure contract fulfillment.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is serving as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19,300,000.00 dollars, the project scope involves the design and removal of existing trailer-mounted electrodialysis reversal, slab-mounted membrane filtration, and reverse osmosis units. These will be replaced with new slab-mounted membrane filtration and reverse osmosis units to create a demineralization facility at the South Bay Water Reclamation Plant aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks subcontractors for various trades including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. All subcontractors must utilize union labor and be prepared to provide a 100 percent payment and performance bond from a US Treasury listed surety company, though Garney will reimburse the bond premium. The project strongly encourages participation from SLBE, ELBE, DBE, MBE, WBE, and SBE certified firms, and offers assistance to these firms in obtaining bonding lines of credit or insurance. Bids are due by August 27, 2026, at 2:00 PM PT, and will be based on Garney Standard Purchase Order and Subcontract forms.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 2 days
View Details