Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

East Harbor Island Redevelopment/Topgolf and Waterfront Park Project (formerly East Harbor Island Redevelopment/Topgolf Project and Port Master Plan Amendment)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Diego Unified Port District is advancing the redevelopment of East Harbor Island to transform a currently underutilized industrial area into a vibrant mixed-use destination centered on public access and entertainment. The project will demolish three existing rental car facilities and airport staging structures to clear the site for new development, including a 9.8-acre Topgolf attraction featuring a three-story, 67,030-square-foot facility with 108 hitting bays, dining, lounges, a rooftop entertainment space, and retail components. This facility will be accompanied by a 4.5-acre enclosed turf outfield supported by netting poles reaching up to 170 feet in height and a 289-space parking lot to accommodate visitors. Concurrently, Liberator Way will be realigned to improve traffic flow and pedestrian connectivity, with associated upgrades to intersections at North Harbor Drive and Harbor Island Drive, including new sidewalks, planting buffers, and parking adjustments. Alongside the Topgolf development, a 10.1-acre waterfront park and promenade will be constructed to provide the public with direct coastal access and recreational amenities. The park will include a 20-foot-wide promenade, plaza areas, a pavilion, playgrounds, cultural programming spaces, seating, shade structures, public art installations, and a public restroom. This green space is designed to enhance community engagement and offer passive and active recreation opportunities along the waterfront. The entire project requires coordinated infrastructure modifications and environmental compliance, with key stakeholders from the Port District, Topgolf, rental car operators, and engineering teams actively involved. The initiative is part of a broader strategy to revitalize East Harbor Island into a publicly accessible, economically vibrant, and environmentally thoughtful urban edge for San Diego.

General Info

Topgolf and waterfront park development on East Harbor Island with realigned roads, parking, and public amenities.

Agency

California → San Diego Unified Port District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Harbor Drive and Liberator Way, San Diego, CA, 92101

Set-Aside

NONE

Documents

(26)

Appendix B East Harbor Island Redevelopment Topgolf and Waterfront Park Project DRAFT PMPA July 2026

PDFport-master-plan-amendment

Appendix C Technical Lighting Analysis for East Harbor Island TopGolf

PDFtechnical-analysis

Appendix J2 Stormwater Quality Management Plan for East Harbor Island Public Infrastructure Development

PDFsow

Appendix O1 Vehicle Miles Traveled Assessment for East Harbor Island Redevelopment

PDFvmt-assessment

East Harbor Island Public Infrastructure Improvements Sewer Study May 2024

PDFstudy-report

Appendix P3 Utility Impact Study for East Harbor Island Redevelopment

PDFutility-impact-study

SDG&E Will Serve Letter for 3180 Liberator Way

PDFwill-serve-letter

Police Will Serve Letter for East Harbor Island Redevelopment

PDFother

Appendix L Noise Technical Memorandum for East Harbor Island Redevelopment

PDFtechnical-memorandum

Appendix E Biological Resources Technical Report for East Harbor Island Redevelopment

PDFtechnical-report

Phase I Environmental Site Assessment Former Harbor Drive Test Facility

PDFenvironmental-site-assessment

Appendix O2 Parking Analysis for East Harbor Island Redevelopment/Topgolf Project

PDFtechnical-memorandum

Notice of Availability of Draft Environmental Impact Report for East Harbor Island Redevelopment Project

PDFspecial-notice

Appendix K Sea-Level Rise Technical Memorandum for East Harbor Island Redevelopment

PDFtechnical-memorandum

East Harbor Island Redevelopment Project - Public Water Line Sizing Recommendations

PDFrecommendation-memorandum

Appendix D Air Quality Technical Memorandum for East Harbor Island Redevelopment

PDFtechnical-memorandum

Appendix H Greenhouse Gas Emissions Technical Memorandum

PDFtechnical-memorandum

Appendix G1 Geology and Soils Technical Study for East Harbor Island Redevelopment

PDFtechnical-study

Notice of Completion for East Harbor Island Redevelopment/Topgolf and Waterfront Park Project SCH# 2023110463

PDFnotice-of-completion

Appendix M1 Fire Will Serve Letter for East Harbor Island Redevelopment

PDFother

Appendix G2 Geotechnical and Fault Rupture Hazard Investigation for Topgolf Harbor Island

PDFgeotechnical-report

Appendix N Tribal Outreach Confidential

PDFother

30% Drainage Study for East Harbor Island Public Infrastructure Development

PDFstudy-report

Draft Environmental Impact Report for East Harbor Island Redevelopment July 2026

PDFenvironmental-impact-report

Revised Notice of Preparation for East Harbor Island Redevelopment/Topgolf Project EIR

PDFpresolicitation

Appendix F Energy Technical Memorandum for East Harbor Island Redevelopment

PDFtechnical-memorandum

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts7 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Megan HamiltonSenior Planner
Devon BeachDistrict Engineering-Construction
Todd WaldoDirector of Real Estate and Development
Andre JaksichRegional Director
Kevin ChenPlanning and Design Manager
William BettisonGroup Property Development

Interested Companies (1)

Show more
Harris and Associates
San Diego, CA

Full Description

Show more
The Project proposes the redevelopment of a portion of East Harbor Island (EHI) within the San Diego Unified Port District's (District's) jurisdiction in the City of San Diego. Project components include the demolition of three rental car facilities and airport construction staging facilities, realignment of Liberator Way, redevelopment of 9.8 acres for a Topgolf visitor-serving attraction, and development of an approximately 10.1-acre waterfront park and promenade offering public coastal access along the waterfront. The Topgolf visitor-serving attraction would include a three-story, 46-foot-high, 67,030-gross-square-foot building that would include 108 hitting bays, as well as restaurants, bars, lounges, a rooftop entertainment area, and retail uses. A 4.5-acre turf outfield would be enclosed by netting supported by poles ranging from 90 to 170 feet high. A Topgolf parking lot would provide 289 parking spaces. The Liberator Way realignment would include parking, pedestrian sidewalks, and planting buffers and would require reconfiguration and/or modification of the North Harbor Drive and Harbor Island Drive intersections. The waterfront park recreational features would include a 20 foot-wide waterfront promenade and active and passive uses, such as plaza areas, a pavilion, playgrounds, cultural uses, seating, shade structures, public art, and a restroom.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Sanitary Sewer & Recycled Water Project in CA
Solicitation # sanitary-sewer-recycled-water-project-ca
The Sanitary Sewer and Recycled Water Project in Colusa, California, involves the installation of approximately 13,000 linear feet of new sewer gravity mains, recycled water mains, and sewer force mains. The scope of work also includes the construction of sewer manholes and necessary surface restoration through pavement grinding and overlay. Garney Pacific, Inc. is acting as the contracting entity for this project, which is owned by the City of Colusa. The solicitation, categorized under NAICS code 237990 for heavy and civil engineering construction, is specifically designed to solicit subcontractor quotes and emphasizes participation from various small and disadvantaged business enterprises, including WOSB, HUBZone, VOSB, and SDVOSB firms. Subcontractors interested in bidding must submit their quotes electronically through the Garney Pacific website by the deadline of September 1, 2026, at 3:00 PM PT. Key contractual requirements include the mandatory use of union labor and the provision of 100% payment and performance bonds from a U.S. Department of the Treasury Circular 570 listed surety company, though the prime contractor has agreed to reimburse bond premiums. Bidders are required to use Garney’s standard purchase order and subcontract forms, with the option to submit redlines for review. While specific evaluation factors and total contract value are not disclosed in the solicitation, the project places a strong emphasis on meeting or exceeding Disadvantaged Business Enterprise (DBE) participation goals.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project is a firm-fixed-price solicitation issued by the U.S. Army Corps of Engineers Honolulu District. The scope of work includes mobilization and demobilization, dredging and ocean disposal of approximately 4,260 cubic yards of material, and repairs to the revetted mole involving clearing, grubbing, stone rework, and the installation of new stone. The project is located in Haleiwa, Oahu, Hawaii, and has an estimated contract value between $1,000,000 and $5,000,000. The performance period is set for 200 calendar days from the date of the Notice to Proceed. This solicitation is a sealed bid process intended for small businesses, including various set-asides such as Small Disadvantaged Business, Women-Owned Small Business, HUBZone, and Veteran-Owned Small Business. Contractors are required to provide several key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom are subject to government approval. Strict adherence to safety standards, specifically USACE EM 385-1-1, is mandatory, and contractors must submit an Accident Prevention Plan and monthly exposure reports. Quality control is managed through a three-phase inspection process, and materials like stone must meet specific ASTM international standards. Additionally, bidders must furnish a bid guarantee and provide performance and payment bonds. The contract is subject to the Davis-Bacon Act regarding prevailing wages, and liquidated damages are set at $2,297 for each calendar day of delay.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is soliciting subcontractor bids for the SBWRP Reverse Osmosis System project located in San Diego, California. The project, owned by the City of San Diego, involves the design and removal of existing trailer-mounted Electrodialysis Reversal (EDR), slab-mounted Membrane Filtration (MF), and Reverse Osmosis (RO) units. These will be replaced with new slab-mounted MF and RO units to create a demineralization facility at the South Bay Water Reclamation Plant, specifically aimed at reducing the total dissolved solids in reclaimed water. The estimated bid value for this project is $19,300,000.00. Garney Pacific is seeking quotes for a wide range of trades, including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. As a general contractor, Garney Pacific, Inc. is actively seeking participation from SLBE and ELBE firms, including those with DBE, MBE, WBE, or SBE certifications. The solicitation includes various set-aside categories such as Small Business, Women-Owned Small Business, and Veteran-Owned Small Business. All selected subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. While Garney will reimburse subcontractors for required bond premiums, bidders must provide their bond rate at the time of their quote. The basis of contracting will be the Garney Standard Purchase Order and Subcontract forms. The deadline for bid submissions is August 27, 2026, by 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 4 days
View Details