Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

By-Day Creek and Slinkard Creek Beaver Dam Analog and Streambank Repair Project (Notification of Lake or Streambed Alteration, No. EPIMS-MOO-66314-R6)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS-MOO-66314-R6 for the By-Day Creek and Slinkard Creek Beaver Dam Analog and Streambank Repair Project. Located in Mono County, California, the project focuses on process-based and technical watershed-scale restoration across 1.34 miles and 1.63 acres of By-Day Creek and Slinkard Creek. The primary objective is to improve aquatic habitat for Lahontan Cutthroat Trout populations by stabilizing streambanks, restoring hydrologic connectivity, reestablishing natural geomorphic processes, and enhancing aquatic and riparian habitat complexity. Key project deliverables include the installation of up to 150 beaver dam analogs, streambank stabilization at two locations, the repair of two failed stream-road crossings, culvert removal and gully rehabilitation, and meadow crossing restoration at one location. The project is managed by Lindsay Britton of California Trout, with Dana Scott serving as the Environmental Scientist for the California Department of Fish and Wildlife. This effort is supported by a Notice of Exemption based on categorical exemptions for the protection of natural resources and small habitat restoration projects.

General Info

California Trout authorized to restore 1.34 miles of creeks in Mono County for Lahontan Cutthroat Trout habitat using beaver dam analogs and geomorphic repairs.

Agency

California → Fish and Wildlife, Region 6 - Inland Deserts, Ontario

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 6 - Inland Deserts, Ontario
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 6 - Inland Deserts, Ontario
Office AddressN/A
Contacts
Lindsay BrittonProject Manager
Dana ScottEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MOO-66314-R6, pursuant to Section 1602 of the Fish and Game Code to California Trout. The project is limited to process-based and technical watershed-scale restoration designed to stabilize streambanks, restore hydrologic connectivity, reestablish natural geomorphic processes, and enhance aquatic and riparian habitat complexity across 1.34 miles of By-Day Creek and Slinkard Creek to improve aquatic habitat for Lahontan Cutthroat Trout (LCT) populations. The project includes installation of 1) up to 150 beaver dam analogs (BDAs); 2) streambank stabilization in two locations; 3) repair of two failed stream-road crossings; 4) culvert removal and gully rehabilitation; and 5) meadow crossing restoration at one location.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS