This Solicitation opportunity from North Carolina was posted on August 26, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Architectural Design Services for New Automotive Building at RCCC North Campus
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves providing comprehensive architectural design services for the development of a new automotive education facility at Rowan-Cabarrus Community College’s North Campus in Salisbury, North Carolina, with an estimated project budget of $25 million. The proposed single-story, 45,000-square-foot building will accommodate classrooms, laboratories, offices, and support spaces tailored to advanced automotive programs, including auto-body, paint, and heavy diesel technology. The design emphasizes flexibility and adaptability, featuring high bay spaces with large access doors, and will incorporate modern utilities such as power, cooling, ventilation, and compressed air to support evolving automotive technologies. The facility will be constructed using a pre-engineered metal building with a facade blending metal and brick to match the campus aesthetic, and will include extensive site development, utility extensions, a large working yard, and a fenced vehicle storage area. The project aims to support increased enrollment driven by dual enrollment initiatives with local high schools and to enhance automotive training capabilities aligned with industry needs. The scope of work encompasses all phases from conceptual design through construction close-out, including site planning, building design, bidding, and construction administration under a Construction Manager at Risk delivery model, adhering to State Construction Office standards. Funding is planned for planning in fiscal year 2025 and construction in fiscal year 2026, with the architect responsible for securing approvals, managing bidding processes, and ensuring the project meets all technical and aesthetic requirements. The solicitation was posted on August 26, 2024, with a response deadline of September 24, 2024.
General Info
Place of Performance
NC, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
This new building will house Classrooms, Labs, Offices, and Support Spaces necessary to support the growth of automotive programs allowing them to support the local automotive industry's workforce needs with state-of-the-art educational opportunities located on North Campus adjacent to the planned Technology Building. The plan calls for existing Automotive programs to relocate into spaces configured to support the latest in automotive technologies. Space Program includes expansion space to allow for expected increased enrollment resulting from dual enrollment with Rowan-Salisbury Schools planned CTE High School, new auto-body and paint booth capabilities, and a new Heavy Diesel Technology program. The building is envisioned to be a 45,000-square-foot, single-story building with high bay spaces with large access doors, and adequate power, cooling, ventilation, and compressed air to facilitate the frequent upgrade of the evolving automotive industry. The building is planned to be located on an undeveloped parcel on North Campus in Salisbury, NC. It is envisioned to be a pre-engineered metal building with a front facade enhanced with metal and brick to integrate into the design aesthetic of North Campus. It will be a high-performing building. The project assumes the extension of all utilities (power, data, water, sewer) to the site from the Technology Building. It will have a large concrete paved working yard and an associated 30-vehicle fenced storage area. This estimate assumes Planning funding in FY 2025 and Construction Funding in FY 2026.
Specific goals for the project are addressed in the Draft Technology Education Complex Owners Project Requirements dated August 26, 2024. The scope of work for this selection will include conceptual design, schematic design, design development, construction documents, construction administration, and project close-out. The project will include site development, building construction, and fit-out yielding a fully functional facility. This Architect shall seek all required approvals, handle bidding, and administer the construction under a CM at Risk delivery model. The project will be designed and administered under State Construction Office requirements.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
