Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from West Virginia was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ARFQ-0608-DCR2700000011-3 | Underground Stormwater Culvert Pipe Project

Closed
ARFQ-0608-DCR2700000011-3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers and manholes, a generator, odor control equipment, stormwater facilities, and site fencing. The project has an estimated value of $16,690,000 and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts forms. The agreement is governed by EJCDC standard forms, requiring performance and payment bonds and proof of insurance. Performance begins upon a Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments due 30 days after presentation to the owner. Final acceptance is contingent upon a joint inspection by the Owner, Contractor, and Engineer, the completion of a punch list, and the Engineer's written recommendation for final payment.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of the bid for reimbursement. Quotes are due by November 17, 2026, at 2:00 PM PT, with the general bid date following on November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 pipelines for the Butterfield Dual Force Main. Additionally, the project requires modifications to the RP-2 Lift Station to accommodate Prado Basin flows, which includes replacing existing pumps with smaller units and constructing an elevated electrical platform to protect equipment from 100-year flood levels. Key electrical deliverables include new SCE electrical services and the installation of a standby generator. Filanc is seeking quotes across a wide range of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids and proposals are due by October 29, 2025, at 2:00 PM. Primary contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 2 hours ago

DEADLINE

in about 3 hours

AI Contract Overview

Show more

The West Virginia Division of Corrections and Rehabilitation is soliciting lump sum bids for a design-build project to replace failing underground stormwater infrastructure at the Parkersburg Correctional Center and Jail. The project is required due to a collapsed galvanized culvert pipe that created a sinkhole and damaged the facility's access road. The scope of work involves removing approximately 80 feet of 8-foot wide galvanized culvert pipe, installing new piping connected to existing underground round precast concrete, and restoring disturbed grass areas. The new access road must be engineered to support the weight of loaded tractor trailers. The contract will be awarded to the lowest qualified responsible bidder based on the total bid amount. The project must be completed within 120 calendar days from the receipt of the notice to proceed and includes a one-year warranty on all parts and labor. Bidders must provide a bid bond for 5 percent of the total bid, while the successful awardee must provide performance and labor/material payment bonds for 100 percent of the contract value. All work must comply with federal, state, county, and city codes, and vendors are required to pay applicable Davis-Bacon wage rates. The final deadline for bid submission is October 2, 2026, at 10:30 AM. Payments will be made in arrears via electronic funds transfer or P-Card.

General Info

Design-build project replacing stormwater infrastructure at Parkersburg Correctional Center by October 2, 2026.

Documents

6

ARFQ 0608 DCR2700000011 - Addendum No. 1

DOWNLOAD, High priority: read this first3 pages · amendment
High

ARFQ 0608 DCR2700000011 - Addendum No. 2 (Underground Stormwater Culvert Pipe Project)

DOWNLOAD, High priority: read this firstamendment
High

ARFQ 0608 DCR2700000011 - Underground Stormwater Culvert Pipe Project

DOWNLOAD, High priority: read this first4 pages · rfq
High

ARFQ 0608 DCR2700000011 - Underground Stormwater Culvert Pipe Project

DOWNLOAD, High priority: read this first88 pages · rfq
High

ARFQ 0608 DCR2700000011 - Underground Stormwater Culvert Pipe Project

DOWNLOAD, High priority: read this first4 pages · rfq
High

ARFQ 0608 DCR270000011 - Underground Stormwater Culvert Pipe Project

DOWNLOAD, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWest Virginia
Contacts2 people available
OfficeWV, USA
Organization / AgencyWest Virginia
Office AddressWV, USA
Contacts

Interested Companies (12)

Litman Excavating
Benchmark Construction
Famco

See All 12 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Underground Stormwater Culvert Pipe Project

More opportunities from West Virginia

Same awarding agency

NAICS: 541720
New
SLED
ARFQ-0402-EDD2700000004-2 | Statewide Evaluation for the 21st CCLC Program
Solicitation # ARFQ-0402-EDD2700000004-2
The West Virginia Department of Education is seeking a statewide evaluator for the 21st Century Community Learning Centers program, authorized under Title IV, Part B of the Federal Elementary and Secondary Education Act. The selected contractor will be responsible for collecting, validating, and analyzing evaluation data, which includes conducting at least one annual on-site visit to five selected subgrantees and delivering one in-person presentation of findings in Charleston, West Virginia, each contract year. Services are anticipated to begin in January 2027, with a Statewide Evaluation Plan due within 60 calendar days of the effective start date. This fixed-amount agency contract will be awarded to the vendor that meets all minimum qualifications and mandatory requirements for the lowest overall total cost, calculated as the sum of the initial contract year and three optional renewal years. Deliverables must be provided in accessible formats, including Microsoft Word, searchable PDFs, and nonproprietary machine-readable datasets. Due to the nature of the work, the contractor must adhere to strict data privacy standards, including FERPA compliance and the execution of confidentiality and non-disclosure agreements. Bids must be submitted electronically via wvOASIS or delivered to the agency by November 12, 2026, at 10:30 AM EDT.
Research and Development in the Social Sciences and Humanities

POSTED

about 17 hours ago

DEADLINE

in 15 days
View Details
New
SLED
ARFQ-0512-WSH2700000006-1 | CHILLER AND VENTILATION MAINTENANCE
Solicitation # ARFQ-0512-WSH2700000006-1
The West Virginia Office of Shared Administration, on behalf of the William R. Sharpe Jr. Hospital in Weston, is soliciting bids for an Agency Master Agreement to provide chiller and ventilation maintenance. The scope of work encompasses both regularly scheduled preventive maintenance and as-needed corrective maintenance for equipment including Bryan Boilers, AutoFlame Controls, and Systecon Pumps. Corrective maintenance projects are capped at 25,000 dollars per project, and any replacement parts exceeding 500 dollars require advance agency approval. The contract is effective for one year upon award with the possibility of renewal through mutual written consent. The award will be granted to the lowest responsible bidder who meets all technical specifications and manufacturer authorizations. Performance requires strict adherence to the National Electric Code, NFPA standards, and UL-916-PAZX listing for products. Vendors must provide a performance bond and a labor/material payment bond, each for 100 percent of the contract value, and must hold valid West Virginia Plumbers and Electricians licenses. Response times for corrective maintenance are strictly defined, requiring a response within four hours for standard requests and a site arrival within two hours for emergency requests. Compliance with federal funds requirements, including Davis-Bacon prevailing wage rates and equal employment opportunity standards, is mandatory.

POSTED

about 17 hours ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS