Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 27, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Armor OSUT 1

Awarded
W911SF-19-R0018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 5 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Solicitation W911SF-19-R0018 is a 100 percent small business set-aside award notice for the Armor OSUT 1 project at Fort Benning, Georgia, managed by the W6QM MICC-Ft Benning. The project involves comprehensive repairs and construction across the Warner, Oscar 14, and Oscar 15 ranges. The scope of work includes the design and construction of several key facilities, such as a small arms range control tower, a C2 facility, a single ammunition point building, a covered mess, a flushable latrine with a leach field, and covered bleachers. Additionally, the contract covers extensive civil and site work, including grading, erosion control, the installation of high-security chain link fencing, and improvements to firing lines and access lanes. The project is executed as a design-build effort, requiring the contractor to advance government-provided conceptual designs from approximately 35 percent to 100 percent completion. Technical specifications are exhaustive, covering demolition and hazardous waste removal, structural concrete and masonry, steel framing, HVAC, electrical distribution, telecommunications, and interior finishes. Strict compliance is required for quality control, safety and occupational health, and environmental protection, including storm water pollution prevention and construction waste management. Project management is governed by critical path method scheduling, with liquidated damages of 1,495.68 dollars per day for late completion.

General Info

Contract Value

$2,425,419.39

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

GA, USA

Set-Aside

NONE

Award Issued Date

Documents

127

01 74 19 Construction and Demolition Waste Management

PDF, High priority: read this first6 pages · sow
High

Ammunition Point Building (Single) - Fort Benning, GA

PDF, High priority: read this firstspecifications
High

Armor OSUT 1-5 General Questions

PDF, High priority: read this first11 pages · q-and-a
High

ARMOR OSUT Pre Award Amendments / Addendum 1

PDF, High priority: read this first52 pages · amendment
High

AR OSUT #1 General Requirements - Project 44039

PDF, High priority: read this first1 page · sow
High

Control Tower - Small Arms (CMU Option) - Fort Benning, GA

PDF, High priority: read this firstspecifications
High

Covered Mess - Fort Benning, Georgia

PDF, High priority: read this firstspecifications
High

Lafayette Pool Oscar 15 Grading Plan Sheet 2

PDF, High priority: read this firstspecifications
High

Lafayette Pool Oscar 15 Nad 83 Grading Plan Sheet 1 Amended 12 July 2019

PDF, High priority: read this firstspecifications
High

Lafayette Pool/Oscar 15 Site Plan Sheet 1

PDF, High priority: read this firstspecifications
High

OSUT_1_02_41_00 Demolition Specification

PDF, High priority: read this first12 pages · sow
High

OSUT-1-23 00 00 40 General Mechanical Provisions

PDF, High priority: read this first6 pages · sow
High

OSUT 1 44026 Stevon Booker Oscar 14 Nad 83 Site Plan Mod

PDF, High priority: read this firstspecifications
High

OSUT 1 C2 Facility Combined - Fort Benning

PDF, High priority: read this firstspecifications
High

OSUT 1 Lafayette Pool Oscar 15 Nad 83 Grading Plan Sheet 1

PDF, High priority: read this firstspecifications
High

OSUT_1_Latrine_Combined - Latrine Floor Plan and Work Notes

PDF, High priority: read this firstspecifications
High

OSUT-AR Range Projects FY19 Project Schedule

PDF, High priority: read this first16 pages · sow
High

OSUT-AR Range Projects FY19 Section 01 33 00 Submittal Procedures

PDF, High priority: read this first11 pages · sow
High

OSUT-AR Range Projects FY19 Section 01 45 01 Quality Control

PDF, High priority: read this first11 pages · sow
High

OSUT-AR RANGE PROJECTS FY19 - Section 01 50 00 Temporary Construction Facilities and Controls

PDF, High priority: read this first9 pages · sow
High

OSUT-AR Range Projects FY19 - Section 01 50 61 Dust Control

PDF, High priority: read this first7 pages · specifications
High

OSUT-AR Range Projects FY19 Section 04 20 00B Masonry

PDF, High priority: read this first29 pages · specifications
High

OSUT-AR Range Projects FY19 Section 05 50 13 Miscellaneous Metal Fabrications

PDF, High priority: read this first11 pages · sow
High

OSUT-AR Range Projects FY19 - Section 07 42 13 Metal Wall Panels

PDF, High priority: read this first22 pages · sow
High

OSUT-AR Range Projects FY19 Section 08 14 00 Wood Doors

PDF, High priority: read this first6 pages · specifications
High

OSUT-AR Range Projects FY19 - Section 31 32 11 Soil Surface Erosion Control

PDF, High priority: read this first20 pages · specifications
High

OSUT-AR Range Projects FY19 - Sources for Reference Publications

PDF, High priority: read this first41 pages · sow
High

OSUT-AR Range Projects – Section 01110 Summary of Work

PDF, High priority: read this first4 pages · sow
High

OSUT FY19 Section 09 90 00 Paints and Coatings

PDF, High priority: read this first25 pages · specifications
High

OUST-AR Range Product FY19 - Section 07 60 00 Flashing and Sheet Metal

PDF, High priority: read this first10 pages · sow
High

OUST-AR Range Project #1 Warner, Oscar 14 & 15 Specifications

DOCX, High priority: read this first5 pages · sow
High

OUST-AR Range Project FY19 – Section 08 11 13 Steel Doors and Frames

PDF, High priority: read this first7 pages · specifications
High

OUST-AR Range Project FY19 - Section 13 34 19 Metal Building Systems

PDF, High priority: read this first36 pages · sow
High

OUST-AR Range Project FY19 - Section 23 82 02 Unitary Heating and Cooling Equipment

PDF, High priority: read this first19 pages · specifications
High

OUST-AR Range Project FY19 - Section 31 23 00.00 20 Excavation and Fill

PDF, High priority: read this first18 pages · sow
High

OUST-AR Range Projects FY19 - Basic Electrical Materials and Methods

PDF, High priority: read this first6 pages · sow
High

OUST-AR Range Projects FY19 - Closeout Submittals

PDF, High priority: read this first11 pages · sow
High

OUST-AR Range Projects FY19 - Concrete Reinforcement Spec

PDF, High priority: read this first5 pages · specifications
High

OUST-AR Range Projects FY19 - Environmental Protection

PDF, High priority: read this first4 pages · sow
High

OUST-AR Range Projects FY19 - High-Security Chain Link Fences and Gates

PDF, High priority: read this first9 pages · specifications
High

OUST-AR Range Projects FY19 - Laminate Clad Architectural Casework

PDF, High priority: read this first13 pages · sow
High

OUST-AR Range Projects FY19 Section 02 84 16 PCB Ballasts and Hazardous Waste Lamp Removal

PDF, High priority: read this first5 pages · sow
High

OUST-AR Range Projects FY19 – Section 03 15 13.00 10 Expansion Joints, Contraction Joints, and Waterstops

PDF, High priority: read this first9 pages · specifications
High

OUST-AR Range Projects FY19 Section 05 30 00 Steel Decks

PDF, High priority: read this first13 pages · specifications
High

OUST-AR Range Projects FY19 Section 05 52 00 Metal Railings

PDF, High priority: read this first9 pages · sow
High

OUST-AR Range Projects FY19 - Section 06 20 00 Finish Carpentry

PDF, High priority: read this first9 pages · sow
High

OUST-AR Range Projects FY19 - Section 06 61 16 Solid Polymer Fabrications

PDF, High priority: read this first8 pages · sow
High

OUST-AR Range Projects FY19 - Section 08 71 00 Door Hardware

PDF, High priority: read this first9 pages · specifications
High

OUST-AR Range Projects FY19 Section 08 81 00 Glazing

PDF, High priority: read this first10 pages · sow
High

OUST-AR RANGE PROJECTS FY19 - Section 09 29 00 Gypsum Board

PDF, High priority: read this first10 pages · specifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Ft Benning
Contacts1 person available
OfficeFORT BENNING, GA, 31905-5182, USA
Office AddressFORT BENNING, GA, 31905-5182, USA
Contacts
Crystal L. ProvencherContract Specialist

Full Description

Show more
Armor OSUT 1, Repair ranges Oscar 14, 15, and Warner.

More opportunities from Department Of Defense → W6QM Micc-Ft Benning

Same awarding agency

NAICS: 541370
Federal
Installation Geographic Information System (GIS) SupportThe contract is for ongoing maintenance, updates, and technical support of the Installation Geographic Information System GIS at Fort Benning, Georgia, to ensure seamless functionality in facility planning, asset tracking, and infrastructure management. This subcontract, classified under NAICS code 541370 for other scientific and technical consulting services, is administered by the Department of Defense through the W6QM Micc-Ft Benning office and is focused on sustaining critical geospatial capabilities essential to military base operations. The work will support accurate data representation, system reliability, and timely responses to evolving spatial data needs within the installation’s operational environment. The contract was posted on June 27, 2026, with performance centered at Fort Benning, zip code 31905, and is intended to provide continuous technical assistance to maintain the integrity and usability of the GIS platform. There is no specified set-aside type or solicitation number, indicating this is likely a follow-on or direct award under an existing master agreement. The scope requires specialized expertise in geospatial technologies, including system upgrades, data integration, user support, and troubleshooting to ensure the GIS remains a dependable tool for installation planning and resource management.
Surveying and Mapping (except Geophysical) Services

POSTED

4 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS