Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

ASA shower and commode

Active
169041State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the complete renovation of a shower and commode area in a 4-bedroom, 2-bathroom brick home with a slab-on-grade foundation and shingle roof, totaling approximately 1800 square feet. All existing plumbing fixtures must be removed and replaced, including installation of a new low-entry shower base and surround made from Swan-Stone or an equivalent material with a minimum thickness of 1/4 inch; FRP is prohibited. The shower must include a Delta or comparable handle and mixing valve, two ADA-compliant adjustable grab bars, an adjustable handheld shower faucet with its own guide rod separate from the grab bars, and a portable shower seat. The existing toilet, which has a malfunctioning flush mechanism, must be replaced with a new ADA comfort height model along with a new wax ring, shut-off valve, and supply line. Necessary repairs to the drain or flange must be made to resolve the slow-flushing issue, while ensuring all other fixtures continue to drain properly. All associated drywall, trim, subflooring, finish flooring, and painting necessary to complete the work must be repaired or replaced. All work must comply with the 2019 International Residential Code and require all applicable licenses, permits, and line locates to be secured by the contractor. Prospective bidders are required to conduct a site visit prior to submission, and no change orders will be permitted for conditions that could have been observed during that visit. The contractor is responsible for accurate material measurements, full cleanup, removal of all debris, and restoration of the yard to mowing condition. Color selections for finishes are to be determined by the homeowner or property manager. The project is managed by the Choctaw Nation Housing Authority in Poteau, Oklahoma, with final bids due by August 11, 2026. Contact for inquiries is available through Case Manager Ferne Gunn or Inspector Kevin Mings, and all submissions must align with the solicitation number 169041.

General Info

Renovate shower and commode in 1800 sq ft home with ADA-compliant fixtures, new plumbing, and code-compliant finishes.

Agency

Oklahoma → Choctaw Nation Housing AuthorityView Agency

NAICS

236118 - Residential RemodelersView NAICS

Place of Performance

Poteau, OK, 74953, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOklahoma → Choctaw Nation Housing Authority
Contacts3 people available
OfficeN/A
Organization / Agency
Oklahoma → Choctaw Nation Housing Authority
View Agency Profile
Office AddressN/A
Contacts
Choctaw Nation Housing Authority Procurement TeamProcurement Team
Ferne GunnCase Manager
Kevin MingsInspector

Full Description

Show more
ASA shower and commode
Special Instructions: Home is a 4-bed 2 bath, brick home approx. 1800 sq. ft. shingle roof. Slab on grade. All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. Any questions please contact (Case Manager) Ferne Gunn at 580-642-6318 or (Inspector) Kevin Mings at 580-317-3244
Plumbing: Remove and replace tub/shower. Install new low entry shower base and surround, with Swan-Stone or comparable, must be a minimum of 1/4” thickness. Replace shower handle and mixing valve with Delta or comparable. Install 2 ADA grab bars, adjustable height handheld shower faucet with its own adjustable guide rod apart from the grab bars. and portable seat. FRP will not be accepted as a tub/shower surround. Repair/replace any all drywall, trim, sub and finish flooring, and paint needed due to repairs. Remove and replace the toilet with a new ADA comfort height toilet, install a new wax ring, shut off and supply line. The existing toilet does not flush properly, make any needed repairs to the drain or toilet flange to fix the problem with the slow flushing toilet, all the other fixtures drain fine in the bathroom.
Special Instructions: All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed.

Similar Contracts

Same NAICS industry code

NAICS: 236118
New
Federal
Kitchen Renovation
Solicitation # 19FR6326Q0097
The U.S. Embassy in Paris is soliciting bids for the renovation of a single kitchen within a U.S. government building located at 2 Avenue Gabriel, Paris, under solicitation number 19FR6326Q0097. The contract will be awarded on a lowest price technically acceptable basis to a responsible contractor who submits a responsive offer by the August 20, 2026 deadline. All offers must be submitted electronically via email to ParisContracting@state.gov and require prior registration in the System for Award Management (SAM), including submission of the UEI number. The contract will be fixed price, with performance to commence within 15 working days of the Notice to Proceed and must be completed within 45 working days thereafter. Work must comply with French and U.S. standards, including NF DTU 60.1 for plumbing, EM 385-1-1 for safety, and the French Labor Code, while also adhering to specific contractual clauses covering whistleblower rights, trafficking in persons, subcontractor debarment, and labor dispute notification. The scope includes demolition, installation of kitchen furniture and appliances, plumbing and electrical rough-ins, tiling, ventilation systems, and final cleanup, with deliverables requiring submission of a bar chart schedule, health and safety plan compliant with French PPSP requirements, a subcontracting plan, proof of insurance, and CONSUEL certification for electrical work. Subcontractors must meet the same compliance obligations, and all personnel on-site must have authorization under U.S. Department of State policies. A bilingual English-French supervisor must be present at all times, and a security clearance process mandates submission of worker identification details within ten days of award. Proposals must be structured into four volumes covering standard forms, pricing breakdowns, performance schedules, and technical and administrative documentation including product data sheets, quality assurance plans, and evidence of past performance. Contract execution is subject to the Government’s right to terminate for convenience, inspection under FAR 52.246-12 and 52.246-21, reporting of nonconforming items, and warranty coverage for construction. Invoicing must be emailed to ParisFMCDBO1@state.gov, with no electronic invoicing systems like WAWF or IPP used. Compliance with foreign labor, tax, licensing, and environmental regulations is mandatory, and offers must demonstrate capability to meet all specifications in Attachment 1 and drawings in Attachment 2, with no deviations permitted without prior
US Embassy Paris

POSTED

6 days ago

DEADLINE

in 21 days
View Details