Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Asphalt Pavement Repair and Resurfacing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Forty Niners Stadium Management Company LLCView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Santa Clara, CA, 95054, USA

Set-Aside

NONE

Documents

This scope was carved out of RFB-FY26-0099.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Levi’s Stadium Asphalt Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Forty Niners Stadium Management Company LLC
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Forty Niners Stadium Management Company LLC
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Remove and replace damaged asphalt in parking and access areas at Levi’s Stadium, including milling, base prep, paving, compaction, and striping coordination.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract entails the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water supplies. The project requires integrated engineering solutions to meet regulatory standards for drinking water safety, with scope covering all phases from site preparation to system commissioning, ensuring seamless integration with existing infrastructure. All work must comply with industry best practices and performance benchmarks for PFAS mitigation. Interested parties must submit responses by September 3, 2026, under solicitation number lacsd-surface-water-pfas-removal-project-no-251-ca, with the project designated for Disadvantaged Business Enterprise participation under Department of Transportation guidelines. The North American Industry Classification System code is 237310, reflecting wastewater and sewage system construction. The contracting entity is Pyramid Building & Engineering, Inc., and inquiries should be directed to John Garrison at estimating@pyramidbuilding.net or 760-949-9005. Performance is limited to California locations, with no specified city or zip details provided for the worksite.
Pyramid Building & Engineering, Inc.

POSTED

about 4 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
2026/2027 Street Rehabilitation
Solicitation # 20260811030
The City of Yucaipa is soliciting bids for the 2026/2027 Street Rehabilitation project, identified as Project No. 11256. This public works construction project involves the rehabilitation of various street segments, including Fremont Street and Calimesa Boulevard. The scope of work encompasses asphalt concrete paving, full width milling, full depth removals and patching, AC overlays, and geogrid installation. Additional requirements include the adjustment of sewer manholes and water utility valve covers to grade, construction of asphalt concrete dikes, installation of new signage, and the application of pavement striping and markings. All work must adhere to the Standard Specifications for Public Works Construction (Greenbook), Caltrans standards, and City Engineer specifications. The contract will be awarded to the lowest responsible bidder based on the total bid amount for Base Bid Schedule A. Bidders must provide proof of a valid California Contractor’s License, comply with California Labor Code prevailing wage and apprenticeship requirements, and maintain comprehensive insurance coverages, including General Liability and Automobile Liability of 5 million dollars per occurrence. Required surety bonds include bid, performance, payment, and maintenance bonds. The successful contractor must start work within 15 calendar days of the Notice to Proceed and complete all activities within 40 working days. Proposals must be submitted as physical hard copies in sealed envelopes to the Yucaipa Public Works Department by the specified deadline.
City of Yucaipa

POSTED

about 5 hours ago

DEADLINE

in 14 days
View Details

More opportunities from California → Forty Niners Stadium Management Company LLC

Same awarding agency

NAICS: 237310
SLED
Levi’s Stadium Asphalt Project
Solicitation # RFB-FY26-0099
The Levi’s Stadium Asphalt Project is a construction contract for the repair and resurfacing of Gold Lots 4 and 5 and the south access road, Bill Walsh Way, located at Levi’s Stadium in Santa Clara, California. The scope of work includes crack sealing, application of slurry seal across the entire asphalt surface, and installation of new striping that matches existing conditions. The contractor is responsible for providing all labor, materials, equipment, tools, transportation, and permits, as well as the demolition, removal, and recycling of old materials. Work must be coordinated with Stadium Manager personnel to avoid disruptions to scheduled events and must comply fully with the Contract Documents, including Exhibit B (Plans and Specifications), Caltrans Standard Specifications and Plans (2025), and The Greenbook, while adhering to Cal/OSHA regulations, California environmental laws, and state recycling mandates. The project has a 60-calendar-day performance period beginning on the Notice to Proceed date, with all work required to be completed on-site at the stadium. The solicitation follows a Lowest Price Technically Acceptable (LPTA) evaluation model, where the award is made solely to the lowest responsive and responsible bidder after confirming technical acceptability—no qualitative scoring or trade-offs between cost and non-cost factors are used. Bids must be submitted electronically through the Stadium Manager’s e-Procurement Portal by the September 1, 2026 deadline, using only the official bid forms provided; substitutions or non-conforming formats will be rejected. Required submissions include a bid bond, payment and performance bonds, insurance documentation, certified payroll records, and a list of subcontractors responsible for more than 0.5% of the bid amount. Contractors must be registered under California labor laws, pay prevailing wages, and submit weekly certified payrolls and compliance forms. No contract value is stated due to blank pricing fields in the bid schedule, and no specific contracting officer, COR, or COTR is named, with oversight delegated to the Stadium Manager’s Representative. All work is subject to final inspection and acceptance at the project site, and the contractor bears full responsibility for corrections or rework at their expense.
Highway, Street, and Bridge Construction

POSTED

9 days ago

DEADLINE

in 21 days
View Details
NAICS: 236220
SLED
Levi’s Stadium Main Kitchen Equipment Project
Solicitation # 20260702026
The project involves the complete replacement of aging kitchen service equipment in the main kitchen at Levi’s Stadium in Santa Clara, California, including demolition and disposal of existing units, procurement and installation of new food service equipment, and all necessary modifications to electrical and plumbing systems to ensure full integration and functionality. The contractor is responsible for all aspects of the work, from obtaining required permits to coordinating with other trades and adhering to strict jobsite rules outlined in Exhibit H, which governs access, safety, conduct, and operational protocols—including no smoking or alcohol, mandatory PPE, daily cleanup, and restrictions on work near major events. All work must comply with the latest edition of The Greenbook, the project’s Plans and Specifications, and Special Conditions, while meeting California labor laws, environmental regulations, and OSHA standards. Performance is measured by adherence to the 90-calendar-day schedule beginning upon Notice to Proceed and successful final inspection and acceptance at the stadium site. Bid submissions must be made electronically through the Bonfire e-Procurement Portal and include mandatory certifications and exhibits: Workers’ Compensation Certification, Public Works Contractor Registration with DIR, Payment and Performance Bonds, Procurement Integrity Guidelines, and Levi’s Stadium Jobsite Rules compliance. The evaluation and award process follows a Lowest Price Technically Acceptable (LPTA) methodology, where technical acceptability is determined by responsiveness and responsibility, and award is made solely to the lowest-priced bidder meeting minimum requirements. No CLIN or pricing breakdown is provided, as bids are submitted as a single lump sum. Contractors must also comply with non-collusion declarations, Iran contracting prohibitions, and strict social media policies, with no federal accountability codes or military standards referenced; instead, state-level compliance and stadium-specific procedures govern all contractual obligations.
Commercial and Institutional Building Construction

POSTED

about 1 month ago

DEADLINE

in 15 days
View Details