Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Utah was posted on June 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Asphalt Paving and Site Surfacing

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil and infrastructure works. Key scopes of work include underground construction such as tunneling, boring, jacking, and micro tunneling; site preparation including land surveying, site clearing, shoring, and subgrade roadbed work; and environmental and support services including storm water pollution prevention (SWPPP), traffic control, and quality control. Required materials and services also include precast concrete, ready mix supply, cathodic protection, and the installation of traffic signs, signals, and lighting. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Additionally, bidders must demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 11 days
NAICS: 237310
New
SLED
ADA Improvements at Cannonsburgh Village
Solicitation # ITB-10-2027
The City of Murfreesboro, Tennessee, is soliciting sealed bids for ADA Improvements at Cannonsburgh Village under solicitation number ITB-10-2027. The project scope involves establishing an accessible path from adjacent buildings to the visitors center toilets, which includes ramp modifications, hardscape improvements from the street to new accessible parking spaces, and minor interior toilet facility upgrades such as the installation of ADA grab bars and adjustments to fixtures and countertops. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and accepted alternates. Bids must be submitted via the OpenGov portal by November 19, 2026, at 8:00 PM CST. Key contractual requirements include a 5% bid security, with performance and payment bonds required for 100% of the contract sum from a Tennessee-licensed bonding company. The contractor must submit an initial construction schedule within 21 days of the award and a quality-control plan within 10 days of the Notice to Proceed. Liquidated damages for failure to achieve substantial completion are set at 500 dollars per calendar day. Bidders must provide a lump sum base bid, a 5% contingency allowance, and unit pricing for the demolition and repouring of exposed aggregate concrete sidewalk. Required submission documents include a bid bond, a contractor responsibility questionnaire, and various certifications regarding Tennessee licensing, drug-free workplaces, and international divestment acts.
Parks and Recreation

POSTED

about 6 hours ago

DEADLINE

in 13 days
NAICS: 237310
New
SLED
LAP Project - Gardens Parkway New Sidewalk and Bicycle Lanes
Solicitation # ITB2025-172CE
The City of Palm Beach Gardens, FL, is soliciting sealed responses for the LAP Project - Gardens Parkway New Sidewalk and Bicycle Lanes under solicitation number ITB2025-172CE. The project focuses on enhancing pedestrian and cyclist safety through the construction of 5-foot bicycle lanes on both the north and south sides of Gardens Parkway between Alternate A1A and Prosperity Farms Road, as well as a new 8-foot wide sidewalk on the south side between Fairchild Gardens Avenue and Prosperity Farms Road. The contract will be awarded to the responsive and responsible bidder who offers the lowest total aggregate price. Bidders must be certified general contractors in the State of Florida and must be prequalified by the Florida Department of Transportation for contracts exceeding $250,000. The project has a maximum performance duration of 410 calendar days, and bids exceeding this timeframe will be rejected. Contractors must adhere to strict technical specifications, including FDOT Standard Plans for traffic control, OSHA safety standards, and ADA requirements for installation patterns. Key legal and labor requirements include compliance with the Davis-Bacon and Related Act, the Build America Act (BABA) for sourcing steel and iron, and the maintenance of a drug-free workplace. The contract requires a minimum one-year warranty from the date of acceptance and mandates that all offers be accompanied by a bid bond, certified check, cashier's check, or surety bond. Submissions must include a detailed work schedule, evidence of experiential qualifications from the past five years, and a list of available staff and equipment.
City Engineer

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
Fairgrounds Passenger Platform Improvements
Solicitation # 26-16
Ben Franklin Transit is soliciting bids for the Fairgrounds Passenger Platform Improvements project located at the west gate of the Benton County Fairgrounds in Kennewick, Washington. The project involves the reconstruction and expansion of the existing passenger loading and staging area to create a larger transit platform. The scope of work includes site preparation, demolition and salvage of existing fencing and pavement, grading, and the construction of a passenger platform with specific slope requirements. Key infrastructure improvements consist of hot mix asphalt paving, reinforced cement concrete tall curbs, stormwater dispersion systems, electrical work, landscaping, and the installation of high-visibility fencing. The contract will be awarded to the most responsive and responsible bidder offering the lowest overall bid cost. Bids are due electronically by November 17, 2026, at 1:00 pm PST and must include a bid security of 5 percent of the bid amount. The successful contractor must provide performance and payment bonds for 100 percent of the contract value and adhere to Washington State Prevailing Wages. The estimated period of performance is 70 calendar days from the Notice to Proceed. While the project is estimated to be under 1.5 million dollars, the contractor is responsible for obtaining necessary City of Kennewick business licenses and permits for public works construction and commercial fencing.
Procurement

POSTED

about 7 hours ago

DEADLINE

in 11 days
NAICS: 237310
New
SLED
MS1-00005 Massachusetts St 14th St to 23rd St Multimodal Improvements Project
Solicitation # CIFB-2600030
The Massachusetts St 14th St to 23rd St Multimodal Improvements Project (CIFB-2600030 / MS1-00005) is a street maintenance and reconstruction effort in Lawrence, Kansas. The scope of work includes reconstructing the outer 8 feet of travel lanes into bicycle lanes, milling and overlaying the center of the road, replacing existing sidewalks, and implementing stormwater improvements at the 19th and Mass Streets intersection. Key deliverables involve the installation of MMA and PTP pavement markings, the placement of 10,599 SY of aggregate base, and various pedestrian and traffic signal upgrades. The project requires coordination with AT&T and Black Hills Energy for concurrent relocations. The contract will be awarded to the lowest responsible bidder, with responsiveness contingent upon a current Kansas Tax Clearance Certificate and proper DBE certification. Bidders must provide a 5% bid bond and submit a Statement of Qualifications, financial statements, and a proposed equipment list. Performance timelines are set at 340 calendar days for substantial completion and 365 calendar days for final completion following the Notice to Proceed, with liquidated damages of $1,000 per day. Due to FTA-required NEPA clearance delays, a 90-day disallowance on bid withdrawal has been implemented. Significant modifications were made through nine addenda, including the extension of the bid closing date to November 10, 2026. Key technical adjustments include the finalization of bicycle chevron quantities to 46, the conversion of materials testing to a $10,000 force account item, and the adjustment of petroleum-contaminated soil disposal to a force account item of $12,852.50. The project is subject to federal requirements, including the Build America Buy America Act, Davis-Bacon wage standards, and FTA-required provisions for Access, Innovation, and Collaboration grant funds.
MSO - CMED

POSTED

about 7 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This contract involves the installation of asphalt pavement specifically for parking lots, access roads, and site circulation areas, focusing on improving infrastructure surfaces. It is categorized under NAICS code 237310, which pertains to highway, street, and bridge construction. The work will be performed for the state of Utah, although the exact location within the state is not specified. The opportunity was posted on June 9, 2026, with a response deadline set for June 25, 2026, indicating a relatively short window for submission. This subcontract does not specify any set-aside requirements or targeted organization types. Interested parties can find additional information and submit responses through the Utah procurement portal provided in the contract details.

General Info

Asphalt pavement installation for Utah parking lots and access roads, response due June 25, 2026.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

This scope was carved out of JF26-027-IFB-REBID.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction: Fire Alarm Upgrade at Churchill Jr High REBID

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeN/A
Organization / AgencyUtah
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of asphalt pavement for parking lots, access roads, and site circulation areas.

More opportunities from Utah

Same awarding agency

NAICS: 237110
New
SLED
DFCM Construction - Prequalified Mechanical & Site Civil Stage II - Weber State University - WSU Waterline Replacement, Phase 3 - Project #20417810
Solicitation # CS27028
The State of Utah Division of Facilities Construction and Management is soliciting bids for the Weber State University Waterline Replacement, Phase 3, located along 4100 South at the south end of the main campus in Ogden, Utah. This project involves the replacement of culinary water and secondary irrigation mains, including the installation of associated valves, vaults, and hydrant connections, as well as comprehensive surface restoration. The estimated construction cost for the project is $1,400,000.00. This is a low bid procurement where eligibility is strictly limited to contractors who have been prequalified under a Stage I Prequalification and are currently on the DFCM Prequalified Contractors list. Bids must be submitted via the U3P website by December 22, 2026, and must include a bid bond for 5% of the bid amount using the AIA Document A310 - 2010 form. Technical requirements include the use of ACI certified finishers for concrete work, adherence to ADA grade and slope standards, and a one-year warranty for vegetation establishment. Materials such as seed, fertilizer, and blankets must be delivered in original packaging with specific manufacturer certifications. Project acceptance is managed by the Resident Engineer and the Engineer, with specific quality standards for concrete and gradation based on UDOT requirements. The contractor is required to maintain a stable project team and provide bid, performance, and payment bonds.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS