Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

B Street Resurfacing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → San Joaquin County

Place of Performance

Fourth Street, Ralph Avenue, Stockton, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A
Contacts
Fatima GutierrezAssistant Planner

Full Description

Show more
B STREET RESURFACING Project Description Project Location: B Street: Ralph Avenue to 200 feet north of Fourth Street. See attached Vicinity Maps. Project Justification: B Street’s 24-foot-wide roadway was paved in 1968 with 0.17 feet of asphalt concrete (AC) over 0.66 feet of aggregate base (AB). The roadway was reconstructed and widened to 48 feet in 1983 with 0.25 feet AC over 0.50 feet AB with dike and 5-foot AC walkway on the east side. The Duck Creek Bridge was constructed with vertical curb and gutter in conjunction with the reconstruction. In 2004, the roadway was resurfaced with 0.17 feet AC. Sidewalk improvements to meet Americans with Disabilities Act (ADA) standards, and striping and signing designation of bikeway facilities also occurred in 2004. The roadway has been maintained with periodic slurry seals (1994, 2000, and 2013). The existing roadway varies in width and, in general, consists of two 12-foot traffic lanes, two 5-foot bike lanes, 5-6-foot sidewalks, and two 8-foot parking lanes in areas. The existing pavement exhibits excessive block, transverse, and longitudinal cracking. There is also light weathering, potholes, and alligator cracking. The northeast corner of B Street and Ralph Avenue has a curb ramp that is not ADA compliant and there are various spots of damaged walkway. B Street currently has Class II bicycle lanes, but a Level of Traffic Stress of 3, making it inaccessible for many potential bicyclists. A Level of Traffic Stress of 3 is tolerable for experienced adults who prefer separate bicycle facilities but are confident riding with traffic. Scope of Work: The project will consist of: 1. Cold planing 0.17 feet pavement (48 feet wide) and replacing with 0.17 feet HMA (Type A). 2. Repairing pavement structural failure areas with 0.25 inches HMA (Type A), after planing operation is performed. 3. Adjusting 7 existing survey monument frames and covers to finished grade. 4. Adjusting existing facilities to finished grade. 5. All striping and markings will be included in the contracted work. 6. Replacing 18 traffic signal loops and adjusting 3 detector hand holes to finished grade. 7. Installing corner curb ramp on the northeast quadrant of B Street and Ralph Avenue. 8. Repairing areas of badly damaged sidewalks. 9. Installing one (1) high visibility crosswalk with two (2) rectangular rapid flashing beacons on the south leg of Sixth Street and B Street intersection. 10. Installing two (2) 5-foot class 2 bike lanes with 3-foot buffers. 11. Installing two (2) corner and one (1) midblock bulb out protected street crossings. Environmental Setting: In these portions of the San Joaquin County, land is primarily residential. There are many large trees adjacent to the project area. Nesting and migratory birds, protected by the Migratory Bird Treaty Act, may nest within these trees. Furthermore, the Swainson’s Hawk, a raptor species of concern within the State of California and listed as threatened may nest adjacent to or within the project area. A pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if construction is scheduled to occur from February 15th to September 1st. Beneficiaries: The public will see increased safety and fewer hazards with these pedestrian and bicyclist improvements and well-maintained road. Overall, there will be reduced maintenance concerns and more reliability within the project area.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Idylwood Avenue at East Main Street Intersection Improvements
Solicitation # 8923
The City of Waterbury, Connecticut, is soliciting proposals for the Idylwood Avenue at East Main Street Intersection Improvements project. The primary objective is to realign and simplify the intersection to enhance driver understanding and overall safety. The scope of work includes upgrading pavement markings on East Main Street, adding dedicated turning lanes, reducing lane widths, and improving traffic signal design. Additionally, the project requires the reconstruction of Idylwood Avenue, involving milling and overlaying the first 120 feet and full-depth reconstruction of the final 35 feet, as well as extending the sidewalk. All work must adhere to Form 819 Standard Specifications for Roads, Bridges, Facilities and Incidental Construction. Prospective bidders must attend a mandatory on-site information session on October 13, 2026, at 10 AM to remain eligible for submission. Proposals are due by October 27, 2026, at 3:30 PM and must be submitted to the Director of Purchasing. The project has an anticipated state funding amount of $248,400.00 and includes specific SBE and MBE goals of 29.39% and 15.51%, respectively. For contracts exceeding $50,000.00, a 10% proposal security is required, along with 100% performance and payment bonds upon award. Evaluation will be based on the quality and responsiveness of the proposal, the proposer's qualifications and financial resources, and the ability to meet the required timeline. State of Connecticut prevailing wage rates and ADA compliance are mandatory.
DAS Procurement

POSTED

about 9 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237310
New
SLED
2026-0015
Solicitation # 49221
The City of Centerville, Ohio, is soliciting unit price bids for the Centerville Station Paving and Multi-Use Path project, identified as solicitation 49221. The project scope includes resurfacing Centerville Station from Brainard Woods to the east entrance of Bill Yeck Park and installing a multi-use asphalt path extending from the existing path to the west entrance of Bill Yeck Park and continuing to Park East Court. Additional work involves continuous and isolated curb replacement, catch basin repairs and replacements, thermoplastic pavement markings, and necessary cut and fill along the path alignment. The engineer's estimate for the project is $838,773.00, with funding provided by local sources. All work must be completed by July 30, 2027, with daytime working hours from Monday through Friday, 7:00 AM to 7:00 PM, and road closures on Centerville Station Road restricted to 8:30 AM to 3:30 PM on weekdays. The contract will be awarded to the lowest and best bid based on compliance, bidder and subcontractor qualifications, financial ability, and prior performance. Bidders must adhere to ODOT Construction and Material Specifications, Montgomery County Sanitary Engineering Department Specifications, and ADA compliance standards. Key requirements include the use of virgin materials for asphalt courses, compliance with Ohio Prevailing Wage laws, and adherence to OSHA safety standards. Submissions must be made electronically via Bid Express by October 8, 2026, and must include a bid form, contract affidavits, a bid bond, and a certificate of liability insurance. The City and its designated Engineer will oversee field inspections and material approvals to ensure all work meets the required quality and fitness standards.
City of Centerville

POSTED

about 12 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237310
New
SLED
2026-0014
Solicitation # 49220
The City of Centerville, Ohio, is soliciting unit price bids for concrete repairs on State Route 48 from Loop Road to Whipp Road. The project scope includes the repair of catch basins, curbs, sidewalks, and curb ramps, with a specific requirement for ADA-compliant detectable warning mats and the use of 7350M2 grates. Technical specifications prohibit the use of slag or recycled materials, requiring virgin materials for asphalt courses. The engineer's estimate for the project is $160,455.00, with funding provided by local sources. Bids must be submitted via Bid Express by October 8, 2026, at 3:00 PM, following a pre-bid meeting held on October 1, 2026. The contract will be awarded to the lowest and best bid based on pricing, bidder qualifications, financial ability, and performance history. While the original plan set listed a completion date of October 1, 2027, Addendum #1 modified the deadline to June 25, 2027, to align with the ODOT urban paving program. The successful contractor must comply with Ohio Prevailing Wage laws, OSHA standards, and the Ohio Manual of Uniform Traffic Control Devices. Key constraints include a total work stoppage two days prior to the Americana Festival to ensure the site is clean and safe. Required submission documents include a bid bond, contract affidavits, a proposal form offer, and certificates of liability insurance and workers' compensation. Payment will be processed through the City of Centerville Public Works office, with partial payments made monthly and final payment issued within 31 days of project acceptance.
City of Centerville

POSTED

about 12 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS