This Sources Sought opportunity from Department Of Defense was posted on April 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
B369 Boiler
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the supply and installation of a new NTI model LX-600 hydronic gas boiler with a 600,000 BTU input capacity. The boiler must feature an ASME stainless steel heat exchanger, be floor-mounted, and include a factory-provided ASME relief valve. It is required to have a minimum 4:1 turndown ratio, achieve 95% combustion efficiency, and possess 4-inch exhaust vent and fresh air intake connections. Additionally, the boiler must come equipped with an outdoor sensor, CSD-1 controls, an integrated electronic controller with touchscreen access, as well as a factory-installed condensate trap and condensate drain kit. The boiler's physical specifications restrict its size to no larger than 24 inches wide, 47.5 inches deep, and 55 inches high, with specific water, gas, and air connections positioned on the left-hand length side and top or length side respectively. The contractor is responsible for providing a minimum one-year comprehensive warranty for all new materials supplied. The contract is a total small business set-aside under NAICS code 332410, issued by the Department of Defense at Offutt Air Force Base in Nebraska, with responses due by May 11, 2026. Key points of contact are available for inquiries, ensuring clear communication channels for successful contract execution.
General Info
Agency
NAICS
Place of Performance
St Columbans, NE, 68113, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The scope of work is to provide a new NTI model LX-600 boiler; 600,000 BTU input, with ASME SS heat exchanger, floor-mount, factory-provided ASME relief valve, at least 4 to 1 turn down, 95% combustion efficiency, 4” exhaust vent and 4” fresh air intake, with outdoor sensor, CSD-1 controls, integrated electronic controller with touch screen access, and factory-installed condensate trap and included condensate drain kit.
The hydronic gas boiler must be at least 600 MBH capacity, with at least 4:1 turndown on natural gas, and dimensions no larger than 24"wide x 47.5"deep(long) x 55" high, with water (2") and gas (1") connections along the left-hand length side and air inlet/exhaust (4") connections along the top or left-hand length side.
The Contractor shall provide at least a 1-year comprehensive warranty on all new materials.
