This Combined Synopsis/Solicitation opportunity from Department Of State was posted on September 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Backflow Preventers
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The U.S. Embassy Kingston is seeking a commercial supply contract under FAR Part 12 and FAR Part 13 for the procurement of backflow preventers and service kits to be used in fire protection and potable water systems. The requirement includes 14 Double-Check Valve Assemblies in various sizes ranging from 1.5 to 4 inches, as well as one 6-inch Reduced Pressure Zone Backflow Prevention Assembly and associated service kits. All equipment must be lead-free and comply with ASSE 1015/CSA B64.5/cUPC, AWWA C510, and NSF/ANSI/CAN 61 and 372 standards. Technical specifications require a minimum working pressure of 175 psi, a temperature range of 33 to 180 degrees Fahrenheit, and the inclusion of all necessary installation tools, calibration instructions, and certification documentation. The selected contractor must provide a minimum one-year warranty and ensure delivery within 30 calendar days of the award. Shipping is designated as FOB Destination to SUVI Global Services in Doral, Florida, with packaging suitable for subsequent international transport to the U.S. Embassy in Kingston, Jamaica. Interested firms must have an active registration in the System for Award Management and submit quotations in USD, including detailed product specifications and NDAA 889 representations, to the embassy procurement office.
General Info
Place of Performance
Kingston, DC, JAMSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The U.S. Embassy Kingston requires the supply and delivery of backflow preventers and spares for use at the Embassy compound. This is a commercial supply acquisition in accordance with FAR Part 12 and FAR Part 13.
The Contractor shall provide backflow preventers and service kits. The system should be certified to prevent contamination and require limited manual intervention and can be safely operated to minimize the impact on residence. The Contractor shall provide and deliver the following items :
14 Double-Check Valve Assembly (DCVA) Backflow Preventers with Installation Kit
- 2 x 1.5" Lead Free Double Check Valve Assembly
- 2 x 2" Lead Free Double Check Valve Assembly
- 2 x 2.5" Lead Free Double Check Valve Assembly with service kit
- 6 x 3" Lead Free Double Check Valve Assembly
- 4 x Service Kit for 3" Lead Free Double Check Valve Assembly
- 2 x 4" Lead Free Double Check Valve Assembly with service kit
- 1 x 6" Lead Free Reduce Pressure Zone Backflow Prevention Assembly with service kit
All specialized tools, and instructions required to complete installation
All certificates of applicable standards and codes
All calibration and commissioning instructions
The Government reserves the right to reject non-conforming products.
1. Mandatory Standards and Compliance
- ASSE 1015/CSA B64.5/cUPC: The device must meet these standards for double check valve assemblies.
- AWWA C510: Compliant with American Water Works Association standards for double check valve assemblies.
- NSF/ANSI/CAN 61 & 372: Must meet lead-free requirements and safe drinking water standards.
- Hazard Rating: Suitable only for non-health hazard (low hazard) applications.
2. Specifications (Technical Data)
- Assembly Components: Must be factory assembled, including two check valves, two shutoff valves, and four test cocks.
- Working Pressure: Minimum 175 psi (12.1 bar).
- Temperature Range: 33°F to 180°F (0.5°C to 82°C).
- Check Valve Type: Spring-loaded check valves.
- Sizes: 3/4" to 2" bronze bodies, 2-1/2" to 10" epoxy-coated iron.
- Shutoff Valves: Full-port resilient-seated ball valves (for sizes 2" and smaller) or non-rising stem gate valves (for sizes 2-1/2" and larger).
- Replaceable stainless steel seats
- Max Flow at low pressure drops
- Ease of maintenance
- Corrosion resistance of internals
- No special tools required for servicing
- Captured spring assemblies for safety
3. Common Recommended Models
- Watts: Series LF007 (Lead Free) or Series 757.
- FEBCO: Series 850 Small (Lead Free).
- Ames Fire & Waterworks: Series 2000B (Small) or 2000SS
All items must be supplied with a mimum Warranty of 1 year
Delivery Terms
Delivery shall be no more than 30 calendar days after award, FOB Destination - SUVI Global Services - Doral, FL. 33178. US. The Contractor shall be responsible for all costs associated with packaging, handling, transportation and delivery.
The items should be packaged for international shipping to final destination - US Embassy Kingston - Kingston, Jamaica
Response
Quotations should be sent in USD excluding duties or taxes and must include delivery time, warranty information, detailed product specifications and certification documentation .
All firms that respond to this request for quotation must at the time of submitting their quotations must have an active registration in the System for Award Management (SAM). Interested parties should email quotations with completed NDAA889 representations to contact@example.gov no later than the response date.
More opportunities from Department Of State → US Embassy Kingston
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
