BAS Integration and Energy Valve Supply/Install
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for Longwood University involves the supply and installation of an energy valve on the AHU-2 chilled water coil at Chichester Hall. The selected contractor is responsible for all wiring and programming necessary to integrate the valve into the existing Building Automation System to enable remote monitoring. A critical requirement for this project is that the contractor must hold the specific BAS certification required for the system utilized at Chichester Hall. The final deliverable is a fully operational integrated energy valve that is successfully communicating within the university's building automation network. Responses are due by October 19, 2026.
General Info
Place of Performance
Longwood University Campus - Chichester Hall, VA, USASet-Aside
Documents
This scope was carved out of LU214-27-003.
The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.
LU214-27-003 Chichester Hall Rooftop AHU Replacement
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Virginia → Longwood University
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS