Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Wisconsin was posted on July 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Basic Preventive Maintenance (PM) for Generators

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract requires annual routine preventive maintenance on between 10 and 28 emergency generators, encompassing inspections, filter replacements, and operational checks to ensure reliability and readiness. The volume of work fluctuates based on the load test cycle, meaning the number of units serviced in a given year may vary depending on testing schedules and operational demands. This is a subcontract under the NAICS code 811411 for general maintenance and repair services, issued by the City of Madison in Wisconsin, with a response deadline set for September 3, 2026. The solicitation was posted on July 31, 2026, and all performance activities are expected to take place within the jurisdiction of the City of Madison.

General Info

Annual maintenance on 10–28 emergency generators in Madison, Wisconsin, per NAICS 811411, with variable workload based on testing cycles.

Documents

This scope was carved out of 15018-0-2026-BP.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Generator Service

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWisconsin → City of Madison
ContactsNo contacts available
OfficeN/A
Organization / AgencyWisconsin → City of Madison
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform routine preventive maintenance annually on 10–28 emergency generators, including inspections, filter changes, and operational checks. Volume varies based on load test cycle.

More opportunities from Wisconsin → City of Madison

Same awarding agency

NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
The Madison LakeWay – SkyLine Improvements project, managed by the City of Madison Parks Division, involves the construction of a green linear parkway along a half-mile stretch of shoreline adjacent to John Nolen Drive in Madison, Wisconsin. Building upon the John Nolen Drive Reconstruction project, the scope includes the installation of two boardwalks, pedestrian-scale site lighting, solar bollards, specialty concrete paving, wayfinding signage, information kiosks, and extensive landscaping. The contract is structured with a Base Bid for the primary improvements and an Alternate Bid Item specifically for the construction of the SkyLine Pier, which includes thermally modified ash wood decking and associated utility work. This is a Best Value Contracting solicitation awarded to the lowest responsive bidder. Bidders must provide a bid bond equal to at least 5% of the bid and submit a Small Business Enterprise Compliance Report to demonstrate adherence to SBE participation goals. The project mandates strict compliance with the Americans with Disabilities Act for all signage and fabrication, as well as adherence to Madison General Ordinance 33.07(7) regarding active apprentice requirements. Quality assurance is managed through required site mockups and inspections of stone and lumber materials by the Architect, with a professional engineer registered in Wisconsin required to certify precast and connection safety. Awarded contractors must execute all documents by January 28, 2027.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS