Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Bear Creek Bridge Replacement (Streambed Alteration Agreement EPIMS Notification No. CAL-67928-R2)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Streambed Alteration Agreement EPIMS Notification Number CAL-67928-R2 for the replacement of a bridge over Bear Creek on Stockton Box Road in Calaveras County, California. The project, involving applicant Barbara Schirato, is conducted pursuant to Section 1602 of the Fish and Game Code and is exempt under California Code of Regulations Title 14. The scope of work includes the removal of existing concrete footings from the banks and eroding concrete from the creek channel, followed by the installation of a new 40-foot span bridge aligned perpendicular to the creek. The new bridge structure is engineered to support equipment weighing 135,000 pounds and must maintain specific channel dimensions, with the Bear Creek channel measuring 12 feet wide at the creek, 23 feet wide at the bottom of the bridge, and 11 feet tall. Administrative oversight is provided by Environmental Scientist Griffin Capehart and Environmental Program Manager Tanya Sheya. The project is designed to meet current public health and safety standards without increasing the capacity or purpose of the existing structure.

General Info

California permits bridge replacement over Bear Creek with new 40-foot structure supporting 135,000-pound loads.

Agency

California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Office AddressN/A
Contacts
Barbara SchiratoProperty owner
Griffin CapehartEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number CAL-67928-R2, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Barbara Schirato. The project is limited to the replacement of a bridge over Bear Creek on Stockton Box Road. The new bridge will have a total span of 40 feet and will be re-aligned to be perpendicular to Bear Creek. The Project includes the removal of existing concrete footings on the banks in addition to eroding concrete located in the channel of Bear Creek. The new bridge structure is engineered to support a 135,000-pound piece of equipment. After replacement of the old structure with the new design as described above, the channel of Bear Creek will be 12 feet wide at the creek, 23 feet wide at the bottom of the bridge, and 11 feet tall.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 19 days
View Details
NAICS: 237310
New
Federal
TX FW LGA 10(5) Steve Thompson Wildlife Drive
Solicitation # 6982AF27B000006
Solicitation 6982AF27B000006 is a firm fixed price, small business set-aside contract issued by the Federal Highway Administration for the rehabilitation of Steve Thompson Wildlife Drive and Bayside Drive at the Laguna Atascosa National Wildlife Refuge in Cameron County, Texas. The project covers approximately 12.33 miles of roadway and involves full-depth reclamation of existing chip seal and gravel surfaces, the installation of a new aggregate base course and gravel surfacing, roadway realignment, and widening. Additional scope includes the installation of an aluminum gate, a small concrete pad, safety improvement signs, and 13 brand-name Rubberform Recycled Products modular speed bumps. The estimated project value ranges between 2 million and 5 million dollars. The contract will be awarded to the lowest responsive and responsible bidder based on the total price for Schedule A, which includes Alternate 2. Bidders must also provide pricing for Alternate 1 and Alternate 3, as the government reserves the right to award Schedule A in combination with one of these alternates. Performance must begin within 10 calendar days of the notice to proceed. Compliance requirements include the Davis-Bacon Act for wages, the Buy American Act, and adherence to FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. Bidders must be registered in the System for Award Management under NAICS 237310 and provide original bid bonds and resumes for key personnel.
6982AF Central Federal Lands Divisi

POSTED

about 5 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237310
New
Federal
Jake Rocks Road Reconstruction
Solicitation # 127EAX27Q0003
Solicitation 127EAX27Q0003 is a Request for Quotation issued by the USDA Forest Service for the Jake Rocks Road Reconstruction project in the Bradford Ranger District of the Allegheny National Forest, located in Warren, Pennsylvania. This total small business set-aside under NAICS 237310 requires a contractor to provide all equipment, labor, and materials to rehabilitate approximately 2.97 miles of designated roads, specifically Forest Road 492 and 492A, as well as two recreational parking areas, two overlook parking areas, and two pull-off areas. The scope of work includes milling and overlaying asphalt, full depth replacement and spot repairs, culvert removal and installation, ditch work, guide rail replacement, the installation of erosion and sedimentation controls, and the construction of accessibility features. All work must adhere to FP-14 Standard Specifications, Forest Service Supplemental Specifications, and MUTCD standards for signage. The contract period of performance runs from November 2, 2026, to September 30, 2027, with a delivery requirement of 135 days after the notice to proceed. Award will be based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach, performance schedule, and a record of three similar projects completed within the last three years. Proposals must be submitted as separate PDF files via email to the designated points of contact by October 26, 2026, at 1:00 PM Eastern Time. Required submission documents include a signed SF1442, a priced Schedule of Items, a technical proposal, and a bid guarantee. The project is subject to the Davis-Bacon Act and requires compliance with Buy American requirements and specific environmental protocols, including the cleaning of equipment to prevent the spread of invasive species on Forest Service lands.
Csa Southwest 7 Usda-Fs

POSTED

about 5 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS