Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from North Carolina was posted on September 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Belk Greenway Connector, Phase 1

Closed
269-2027-031State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Construction On State Highway In Lake County Near Lower Lake On Route 29 From Coyote Creek Bridge To Diener Drive/Road 543 And On Route 53 At Route 29
Solicitation # 01-0J9304
Solicitation 01-0J9304 is a construction project managed by the California Department of Transportation for state highway improvements in Lake County. The scope of work focuses on Route 29 from Coyote Creek Bridge to Diener Drive/Road 543 and Route 53 at Route 29, involving cold planing of AC pavement and the installation of Rubberized Hot Mix Asphalt Gap Graded overlay and Hot Mix Asphalt Type A surfacing. The project has an estimated cost of 14,400,000 USD, with bidding requirements specifying a bidder's security of at least 10 percent and a performance timeline between 100 and 140 working days. The contract is governed by the 2025 Standard Specifications and specific Special Provisions, including strict Buy America/Build America requirements and environmental mandates. Contractors must ensure equipment is pressure washed to prevent invasive species and provide environmental product declarations for concrete and asphalt. Key personnel requirements include a safety representative with specific certifications from the Board of Certified Safety Professionals or the National Association of Safety Professionals, as well as valid first aid and CPR certifications. Job site activities must commence within 55 days of contract approval, and all work must adhere to local codes, MASH Test Level 3 safety standards, and RWQCB water quality objectives.
California Department of Transportation

POSTED

about 8 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
Ten Mile Road and Deer Flat Road
Solicitation # CT227-10
Solicitation CT227-10 is an invitation for bids from the Ada County Highway District (ACHD) for infrastructure improvements at the intersection of Ten Mile Road and Deer Flat Road in Kuna, Idaho. The scope of work includes site preparation, vegetation clearing, the demolition of a building on the southwest corner, and the installation of storm drains, water mains, and irrigation sleeves. Pedestrian improvements consist of five-inch thick concrete sidewalks, vertical curbs, gutters, and ADA-compliant ramps with detectable warning domes. To maintain traffic flow during construction, the contractor must implement a phasing plan that includes a shoofly and the maintenance of at least one 11-foot minimum lane in each direction on Ten Mile Road. The contract will be awarded to the lowest cost and responsive bidder. Proposals must be submitted as electronically sealed bids via the ACHD eProcurement Portal by November 18, 2026, at 3:00pm. Submissions must include a completed vendor questionnaire, bid schedules, an electronically signed authorized signature form, and bid security in the amount of 10% of the total proposal. The successful bidder must provide performance and payment bonds, as well as insurance documentation. Performance is subject to liquidated damages of 2,000 dollars per calendar day of delay. Payment is processed monthly based on verified quantities and backup documentation submitted by the 25th of each month. Quality control is the responsibility of the contractor, while ACHD manages quality assurance and final project acceptance.
Projects

POSTED

about 9 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Belk Greenway Connector, Phase 1 (Project No. PMES171510, Solicitation No. 269-2027-031) is a City of Charlotte infrastructure project located in Mecklenburg County, North Carolina. The scope of work involves the construction of a cycle track with a monolithic island buffer, removal and replacement of the median, and the installation of pedestrian safety features including curb ramps, push buttons, poles, and signals. Additional requirements include drainage structure conversions, resurfacing, pavement markings, and the relocation of traffic signals. The project is estimated to cost between $1,000,000 and $5,000,000, with a performance period of 270 calendar days following the Notice to Proceed. Work will impact several corridors in the uptown area, including McDowell Street, Brooklyn Village Avenue, MLK Jr. Blvd, Baxter Street, and Pearl Park Way. The contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted electronically via the Bonfire Procurement Portal by October 27, 2026, at 1:00 PM. For bids equal to or exceeding $100,000, a 5% bid security is required, and the successful bidder must provide performance and payment bonds for 100% of the contract amount within ten calendar days of the award. The project must adhere to the January 2024 NCDOT Standard Specifications for Roads and Structures, ADA and PROWAG accessibility guidelines, and Build America Buy America domestic-content requirements. Bidders must also provide certifications regarding non-discrimination, non-collusion, and debarment, while demonstrating good faith efforts to meet Disadvantaged Business Enterprise (DBE) goals.

General Info

Charlotte infrastructure project for cycle track and safety features costing $1M to $5M.

Documents

11
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first18 pages · bid-form
High
PDF, High priority: read this firstitb
High
XLSX, High priority: read this first5 pages · rfq
High
PDF, High priority: read this first213 pages · project-manual
High
PDF, Low priorityplan-holders-list
Low
PDF, Low priority7 pages · bid-bond
Low
PDF, Low priorityindustry-day
Low

Read all 11 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 27, 2026 to Nov 3, 2026.

Deadline changed

Response deadline changed from Nov 3, 2026 to Nov 10, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → City Of Charlotte
Contacts1 person available
OfficeNC, USA

Full Description

Show more
This project includes construction of a cycle track with a monolithic island buffer; removal and replacement of the median; replacement of curb ramps and pedestrian push buttons, poles, and signals; relocation of traffic signals; drainage structure conversions; resurfacing; and pavement markings.

More opportunities from North Carolina → City Of Charlotte

Same awarding agency

NAICS: 811114
New
SLED
ENGINE DIAGNOSTIC SUPPORT, REPAIR, OVERHAUL OR REPLACEMENT
Solicitation # 269- 2026-2254
The City of Charlotte is soliciting proposals for a qualified vendor to provide engine diagnostic support, repair, overhaul, and replacement services for the Charlotte Area Transit System (CATS) diesel and hybrid buses equipped with Cummins engines. All services must adhere to Cummins OEM standards to ensure vehicles are returned to safe operational condition. The contract includes a three-year initial term with options for one-year renewals, with pricing requirements covering standard, after-hours, weekend, and holiday labor rates, as well as specific Cummins software licenses including Insite Pro, Insite Basic, and Quick Service. Proposals must be submitted electronically via the Bonfire procurement portal by December 14, 2026. Awarded vendors must comply with extensive federal and local regulations, including FTA Circular 4220.1F, Title VI non-discrimination acts, and ADA accessibility standards. Key requirements include maintaining specific insurance coverages, such as hired/non-owned auto liability of at least 1 million dollars, and adhering to Disadvantaged Business Enterprise (DBE) and Small Business Enterprise (SBE) utilization commitments. The City maintains strict audit rights over billing records and requires that all personnel deemed key to the project be approved by the City. Payment for undisputed invoices is issued within 30 days of receipt.
Specialized Automotive Repair

POSTED

3 days ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
SLED
Idlewild Road/Rama Road/Monroe Road Intersection Improvement
Solicitation # PM51216009
The City of Charlotte is soliciting bids for the Idlewild Road, Rama Road, and Monroe Road Intersection Improvement project, identified by solicitation number PM51216009. This infrastructure project covers 0.954 miles and aims to enhance safety and accessibility for all users through pavement widening for dual left-turn lanes, the installation of bicycle lanes, pedestrian refuge islands, and new sidewalks. The scope of work includes extensive earthwork, grading, asphalt concrete base course installation, concrete sidewalk and driveway construction, and the installation of thermoplastic pavement markings and traffic signal infrastructure. Bids must be submitted electronically by December 16, 2026, before 1:00 PM. Requirements include an itemized bid and several mandatory certifications, including Buy America (Domestic Steel and Iron), Federal-Aid Contracts (NCDOT, SP1 G85), and a Commercial Non-Discrimination Certification. The project must adhere to NCDOT Standard Specifications and comply with federal regulations such as the Davis-Bacon Act, the Anti-Kickback Act, and Occupational Safety and Health Standards. Failure to provide required certifications may result in civil penalties ranging from $10,000 to $100,000, and false non-discrimination certifications may lead to bid rejection or disqualification from City contracts for up to two years.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 29 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS