Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Bella Oaks Winery Use Permit Minor Modification (P23-00032-MM) and Administrative Permit (P25-00284-ADMIN)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bella Oaks Winery project, located at 1271 Manley Lane in Napa, California, involves a Winery Use Permit Minor Modification (P23-00032-MM) and an Administrative Permit (P25-00284-ADMIN). The primary scope of work is the replacement of an existing 8,177 square foot winery and 3,740 square foot crush pad with a new two-story, 17,192 square foot facility. This new structure will include 12,288 square feet of production space, featuring a 2,750 square foot covered crush pad and 9,538 square feet for fermentation, barrel storage, and a lab, alongside 4,903 square feet for accessory uses such as a tasting room, offices, and employee break rooms. Supporting infrastructure improvements include the installation of new water storage and distribution systems for domestic use and fire protection, the replacement of wastewater treatment systems, and the upgrade of driveways to Napa County Road and Street Standards. Site enhancements involve adding eight parking spaces (six standard and two accessible), 12 valet overflow spaces, two EV charging stations, and bike racks, as well as replacing 14 trees with a refreshed landscape of sycamore trees, grasses, and shrubs. Operationally, the winery will increase its full-time staff from four to ten and extend daily visitation hours to 10:00 a.m. to 6:00 p.m. While maintaining a 25-vehicle daily limit, the winery is permitted an average of 60 visitors per day and a maximum of 75. The project replaces full-sized tour buses with sprinter-van style vehicles and establishes a marketing plan for ten annual events of up to 40 attendees and one annual event for up to 80 attendees. The project is subject to a Mitigated Negative Declaration, with specific compliance requirements for noise and biological resources, and must adhere to ASTM D6299-2007 for construction environmental air quality.

General Info

Bella Oaks Winery expanding facility infrastructure, staffing, and hours in Napa County.

Agency

California → Napa County

Place of Performance

Manley Lane and St. Helena Highway/State Route 29, CA, 94573

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Napa County
Office AddressN/A
Contacts
Katherine PhilippakisAttorney

Full Description

Show more
Request for a Winery Use Permit Minor Modification and Administration Application to allow the winery to: 1) replace the existing +/-8,177 square foot winery and 3,740 square foot crush pad with a two-story, +/-17,192 square foot facility that features a main production building and an auxiliary building joined by a covered crush pad, allocating +/-12,288 square feet to production space (includes a 2,750 square foot covered crush pad and 9,538 square feet of enclosed space for expanded fermentation area, barrel storage, and a lab), and +/-4,903 square feet to accessory uses (including tasting room space, employee break rooms, and offices); 2) install new water storage and distribution systems for domestic use and fire protection, and replace existing wastewater treatment systems; 3) add six (6) standard and two (2) accessible parking spaces, plus 12 valet overflow spaces; 4) install two (2) EV charging stations and bike racks, and upgrade existing driveways to Napa County Road and Street Standards; 5) modify existing landscaping by replacing 14 trees with a refreshed landscape of new sycamore trees, grasses, shrubs, and perennials; 6) increase full-time staff from four (4) to ten (10) and extend daily visitation hours to 10:00 a.m.–6:00 p.m.; 7) maintain a 25-vehicle daily limit while clarifying the winery is permitted an average of 60 visitors per day (420/week) and a maximum of 75 visitors per day (525/week); 8) eliminate full-sized tour buses in favor of "sprinter-van" style vehicles; and, 9) establish a marketing plan allowing ten (10) annual events for up to 40 attendees and one (1) annual event for up to 80 attendees. No changes are proposed to existing permitted production capacity, production hours, or maximum daily visitation limits.

Similar Contracts

Same NAICS industry code

NAICS: 312130
SLED
Arrow and Branch Winery, Use Permit Major Modification #P23-00057-MOD
Solicitation # P23-00057-MOD
The Arrow and Branch Winery Use Permit Major Modification (P23-00057-MOD) was approved by the Napa County Board of Supervisors on April 28, 2026. Located on a 10.09-acre site in Napa, California, the project authorizes an increase in annual wine production from 30,000 to 45,000 gallons. The scope of work includes expanding the winery building to create a total of 13,797 square feet of production space and 4,308 square feet of accessory space. Additional site improvements involve the construction of a balcony, a covered terrace for outdoor tasting, the installation of an 81,000-gallon process water storage tank, and the reconfiguration of existing parking to include twelve spaces, one of which is designated for ADA access. Operationally, the modification allows for increased employment, more marketing events, and an increase in daily tours and tastings by appointment only. The project has undergone extensive environmental and technical review, resulting in a Mitigated Negative Declaration under CEQA. Key assessments include a Tier 3 Water Availability Analysis confirming that groundwater pumping will not impact the nearby Dry Creek, and a biological assessment concluding that no suitable habitat for the Northern Spotted Owl exists on-site. The project must adhere to strict lighting requirements to minimize impact on adjacent properties and comply with Napa County General Plan noise standards. Infrastructure requirements include the classification of the onsite water system as a transient noncommunity public water system and the implementation of a Mitigation Monitoring and Reporting program to protect biological and noise resources. Projected annual operational and maintenance expenses for the water system are estimated to range from approximately 22,024 dollars in 2023 to 23,483 dollars by 2027.
Napa County

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 312130
SLED
Promise Winery
Solicitation # P22-00384
The Promise Winery project, located at 2000 Sage Canyon Road in St. Helena, California, involves a comprehensive request for a Use Permit, a Variance, and an Exception to Napa County Road and Street Standards. The development is structured in two distinct phases on a 62.56-acre parcel. Phase I focuses on establishing winery operations by converting and expanding an existing barn into a 2,794 sq. ft. production space and repurposing an accessory dwelling unit into a tasting room, with an initial production capacity of 5,000 gallons per year and a staff of five. Phase II expands the facility's capabilities to 30,000 gallons of annual production through the construction of a 5,000 sq. ft. production cave, a 1,235 sq. ft. covered crush pad, a 1,040 sq. ft. mechanical enclosure, and a 900 sq. ft. parking structure with an ADA restroom. Operational activities include daily tours and tastings limited to 15 visitors per day, as well as specific private marketing events. The project requires significant site improvements and mitigation strategies to address environmental and safety concerns. Infrastructure plans include widening the driveway, installing intervisible turnouts for emergency vehicle access, and implementing vegetation management to maintain sightlines. To address environmental impacts, the project includes a Mitigated Negative Declaration addressing biological and tribal cultural resources, alongside a plan to mitigate vegetation loss through a 3:1 acreage ratio. Water and wastewater management are critical components, with studies confirming groundwater availability and a plan for wastewater reuse in vineyard irrigation to comply with state discharge requirements. The development is subject to oversight by various agencies, including Napa County, Caltrans, and the Water Quality Control Board, with public hearings scheduled to address the proposed variances and environmental mitigations.
Napa County

POSTED

10 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS