Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on June 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Belmondo Levee Repair

Closed
001445State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Belmondo Levee Repair project involves repairing up to 100 feet of damage on the levee, an existing engineered log jam, and a rock barb located at River Mile 10.4 on the Cedar River. In addition to structural repairs, the project includes habitat enhancement efforts in the adjacent floodplain to promote aquatic habitat health. The primary objective is to restore flood protection for critical infrastructure such as State Route 169, King County’s Cedar River Regional Trail, and Verizon’s buried interstate fiber optic line, ensuring continued safety and service reliability. The project aims to balance flood risk mitigation with ecological improvements, contributing to both community safety and environmental conservation. The contract, posted by King County in Washington, has a project value estimated between $500,000 and $1,500,000. The solicitation was made available on June 9, 2025, with a response deadline set for June 26, 2025. The project is managed by King County’s SLED organization, and interested parties can contact Brian Pinney via email for further details. The project emphasizes timely and effective repair work combined with habitat enhancement to achieve its dual goals of flood protection and ecological restoration.

General Info

Documents

1

KC001445-itb-documents.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → King County
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → King County
Office AddressN/A
Contacts

Full Description

Show more
The Belmondo Levee Repair will repair up to 100-feet of damage on the levee, existing engineered log jam (ELJ) and rock barb located at River Mile 10.4 on the Cedar River. The project will also include habitat enhancement in the floodplain adjacent to the damaged section of levee. The goal of the project is to repair damages to continue providing flood protection to State Route 169, King County’s Cedar River Regional Trail, and Verizon’s buried interstate fiber optic line, while also enhancing aquatic habitat.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS