Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on July 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Berth 5 Maintenance

Closed
25-57State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

Solicitation 25-57, titled Berth 5 Maintenance, is an awarded project issued by the Port of Vancouver USA in Washington. The scope of work involves comprehensive construction and maintenance activities within the street right-of-way, specifically focusing on a pedestrian curb retrofit program. Key deliverables include the removal and construction of sidewalks, installation of ADA pedestrian curb ramps and detectable warning surfaces, asphalt and concrete paving for driveways and curbs, tree removal and installation, and the implementation of erosion and sediment control measures. All work must adhere to Statewide Urban Design and Specifications and Code of Iowa Chapter 73, with inspections and final acceptance occurring at the project site. The procurement process utilized a trade-off evaluation basis, considering price, bidder responsibility, experience, financial stability, and technical compliance. Required submission documents included a bid bond for projects exceeding 100,000 USD, certificates of insurance, and DBE subcontractor contact forms. The contract structure includes provisions for term extensions up to five years by mutual agreement and strict Organizational Conflict of Interest certifications. While the solicitation lists 40 detailed line items for materials and labor, the provided data indicates the contract follows a local government template rather than federal FAR standards.

General Info

Port of Vancouver USA awarded Berth 5 maintenance for pedestrian curb retrofit construction.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Port of Vancouver USA
Contacts1 person available
OfficeWA, USA

Full Description

Show more
Return to Bid List Bid NUMBER 25-57 TITLE Berth 5 Maintenance PROCESS Offline BASE CURRENCY USD STATUS Awarded DESCRIPTION BIDDERS RESULTS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.
BID EVENTS TITLE ATTENDANCE REQUIRED TO BID DESCRIPTION LOCATION REGISTRATION CUTOFF DATE EVENT START DATE EVENT END DATE CANCELLED ATTACHED FILE FILE DESCRIPTION BID CATEGORIES CODE TITLE FULL NAME

More opportunities from Washington → Port of Vancouver USA

Same awarding agency

NAICS: 237110
SLED
Terminal 4 Pond Polishing System
Solicitation # 26-64
The Port of Vancouver is soliciting bids for Project 26-64, the Terminal 4 Pond Polishing System, which involves retrofitting the existing T4 Pond stormwater treatment system. The scope of work includes the installation of a permanent aboveground polishing system featuring a lift station with two submersible pumps, a valve vault, a concrete equipment pad, and associated water conveyance piping. The project requires excavation, trenchless trenching, dewatering, and electrical improvements to treat runoff in accordance with SWMMWW BMP C251 and ISGP requirements before discharging into the Columbia River. Additionally, chemical addition infrastructure per C250 BMP requirements will be installed for future use. The engineer's estimate for the project ranges from 4,370,000 to 4,830,000 USD. Bids are due by November 19, 2026, at 2:00 PM, and will be awarded to the lowest responsible bidder. Bidders must provide a bid deposit of 5 percent of the bid amount via cashier's check or surety bond and must comply with Washington State Prevailing Wage Rates for Clark County. Mandatory requirements include a signed Safety Affidavit, contractor registration per RCW 18.27, and state excise tax registration. The contract is a unit price agreement and incorporates WSDOT, APWA, and Port of Vancouver General Special Provisions. Performance and payment bonds are required, and a 5 percent retainage will be held from progress payments, which are processed within 30 days of approval.
Water and Sewer Line and Related Structures Construction

POSTED

about 1 month ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS