Berths 212-224 [YTI] Container Terminal Improvements Project

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Berths 212-224 Container Terminal Improvements Project, managed by the Port of Los Angeles in California, involves a permit amendment with a term of up to 31 years to support the continued operations of an existing marine container terminal. This project allows YTI to complete the remaining components of a previously approved Environmental Impact Report and updates the Mitigation Monitoring and Reporting Program to align with the 2017 Clean Air Action Plan and current federal, state, and local regulations. These modifications include updated environmental requirements and changes to the shipping company name within the lease measures. Although the project is noted to have a significant effect on the environment, the modifications themselves have not introduced new significant impacts or substantially increased the severity of previously identified effects. To address these impacts, the Los Angeles Harbor Department has adopted a Final EIR and Addendum, which include specific mitigation measures, a mitigation monitoring and reporting plan, and a statement of overriding considerations. The project is officially recorded for public filing as of August 27, 2026.

General Info

Port of Los Angeles permit amendment for YTI container terminal improvements through 2057.

Place of Performance

New Dock Street & Pier S Avenue, Los Angeles, CA, 90731

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles, Port of
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Celia Sanchez ZelayaAssistant Planner

Full Description

Show more
The Addendum would issue a permit amendment with a term of up to 31 years to allow for continued operations of an existing marine container terminal and for YTI to complete the remaining components of the previous approved Environmental Impact Report (EIR). It would also modify the Mitigation Monitoring and Reporting Program (MMRP) into the permit amendment, which modifies the timing, updates the environmental requirements consistent with the 2017 Clean Air Action Plan update and applicable federal, state, and regional/local rules and regulations, and changes the name of the shipping company in lease measures contained in the MMRP. No new significant environmental impacts or substantial increase in the severity of previously identified significant effects have been identified from these Project modifications.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Bayou Grande Watershed Management Plan
Solicitation # PD 26-27.007
Escambia County is soliciting proposals for the development of a comprehensive Watershed Management Plan for the Bayou Grande Watershed, covering approximately 11,000 acres in the Warrington neighborhood of Pensacola. The project focuses on surface-water and contributing-watershed areas identified by WBID #548F and #740. The selected consultant will synthesize existing data to address critical vulnerabilities including sediment contamination from trace metals and PCBs, water quality impairments, shoreline erosion, and coastal resiliency. Key deliverables include a stakeholder engagement plan, a diversified funding and implementation strategy, and adaptive management recommendations. The consultant must coordinate with various partners, including NAS Pensacola and the Pensacola and Perdido Bay Estuary Program, while adhering to Best Available Science and Best Management Practices. The project is funded through the RESTORE Direct component (Pot 1) and a Florida Department of Environmental Protection Resilient Florida Grant, with an initial RESTORE Act authorization of 550,000 dollars. Compliance requirements include adherence to 2 C.F.R. Part 200, the Davis-Bacon Act for applicable construction services, and Florida's Public Records Act. Award selection will be on an all-or-none total basis, evaluated based on responsiveness, responsibility, qualifications, and delivery time. Required security and financial assurances include a five percent bid guarantee, as well as performance and payment bonds for 100 percent of the contract price. Proposals must be submitted via the OpenGov portal by the specified deadline, including a detailed pricing estimate and a draft workplan with key milestones.
Natural Resources

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Los Angeles, Port of

Same awarding agency

NAICS: 237990
SLED
Terminal Island Maritime Support Facility
Solicitation # 230131-011
The Terminal Island Maritime Support Facility Project involves the development and operation of a chassis support facility on an approximately 89-acre site at 740 Terminal Way, San Pedro, California, within the Port of Los Angeles. The project scope includes the construction of office trailers, maintenance and repair facilities, and chassis stalls, along with the installation of necessary water and electrical infrastructure. Additionally, the project entails the refurbishment of the vacant Eldridge Street office building at 750 Eldridge Street to support facility operations. The facility is intended to operate for up to 25 years, with a critical requirement that all cargo handling equipment on-site must be zero-emissions by January 1, 2030. The project has undergone extensive environmental review under the California Environmental Quality Act (CEQA), resulting in a Final Environmental Impact Report. Key environmental considerations include the management of contaminated soil and groundwater through a formal Soil Management Plan, as well as the mitigation of greenhouse gas emissions and air quality impacts, specifically regarding nitrogen oxides. Compliance with the California Coastal Act and South Coast Air Quality Management District regulations is required. Contractors must adhere to strict safety and health standards, including HAZWOPER and OSHA Hazard Communication training for personnel, the implementation of a Health and Safety Plan, and the use of specific personal protective equipment. Site operations must also include rigorous dust control measures and strict hazardous waste transport, marking, and labeling protocols.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS