Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Terminal Island Maritime Support Facility

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Terminal Island Maritime Support Facility Project involves the development and operation of a chassis support facility on an approximately 89-acre site at 740 Terminal Way, San Pedro, California, within the Port of Los Angeles. The project scope includes the construction of office trailers, maintenance and repair facilities, and chassis stalls, along with the installation of necessary water and electrical infrastructure. Additionally, the project entails the refurbishment of the vacant Eldridge Street office building at 750 Eldridge Street to support facility operations. The facility is intended to operate for up to 25 years, with a critical requirement that all cargo handling equipment on-site must be zero-emissions by January 1, 2030. The project has undergone extensive environmental review under the California Environmental Quality Act (CEQA), resulting in a Final Environmental Impact Report. Key environmental considerations include the management of contaminated soil and groundwater through a formal Soil Management Plan, as well as the mitigation of greenhouse gas emissions and air quality impacts, specifically regarding nitrogen oxides. Compliance with the California Coastal Act and South Coast Air Quality Management District regulations is required. Contractors must adhere to strict safety and health standards, including HAZWOPER and OSHA Hazard Communication training for personnel, the implementation of a Health and Safety Plan, and the use of specific personal protective equipment. Site operations must also include rigorous dust control measures and strict hazardous waste transport, marking, and labeling protocols.

General Info

Port of Los Angeles to build chassis support facility on 89-acre site in San Pedro, refurbish office building.

Agency

California → Los Angeles, Port of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Navy Way, Ferry Street, Terminal Way, and State Route 47, Los Angeles, CA, 90731

Set-Aside

NONE

Documents

(40)

Section 3.4 Hazards and Hazardous Materials Summary

PDFsow

Chapter 3 Environmental Analysis - CEQA Impact Evaluation

PDFenvironmental-impact-report

Appendix B1 - Air Quality and Greenhouse Gas Calculations

PDFsupporting-document

Port of Los Angeles Terminal Island Maritime Support Facility Energy Section

PDFenvironmental-impact-section

Port of Los Angeles Terminal Island Maritime Support Facility Air Quality and Health Risk Section

PDFenvironmental-impact-section

Appendix C-CCA Consistency Analysis for Terminal Island Maritime Support Facility

PDFother

Los Angeles Harbor Department Chassis Support Facility Environmental Impact Report

PDFenvironmental-impact-report

Los Angeles Harbor Department Final Environmental Impact Report Chapter 10 Responses to Comments

PDFfinal-eir

Environmental Impact Report Table of Contents

PDFenvironmental-impact-report

Chapter 8 List of Preparers and Contributors - Los Angeles Harbor Department Environmental Document

PDFother

DEIR PDFs

ZIP

Terminal Island Maritime Support Facility Project Air Quality and Health Risk Section

PDFenvironmental-impact-report-section

Los Angeles Harbor Department Environmental Analysis Document

PDFother

Chapter 7 Growth-Inducing Impacts Environmental Report

PDFenvironmental-impact-report

Port of Los Angeles Terminal Island Maritime Support Facility Project Description

PDFproject-description

Section 3.3 Greenhouse Gas Emissions Analysis for Terminal Island MSF Project

PDFenvironmental-impact-report-section

Final Environmental Impact Report for Terminal Island Maritime Support Facility

PDFenvironmental-impact-report

Acronyms and Abbreviations Reference

PDFother

Appendix B1 - Air Quality and Greenhouse Gas Calculations

PDFsupporting-document

SCH 2023120181 Terminal Island Maritime Support Facility Partially Revised Draft EIR

PDFenvironmental-impact-report

Caltrans Comments on Terminal Island Maritime Support Facility DEIR

PDFcomment

Appendix B2 Health Risk Assessment for Diesel Particulate Matter

PDFhealth-risk-assessment

Notice of Availability - Terminal Island Maritime Support Facility Project RDEIR

PDFspecial-notice

Summary Form for Terminal Island Maritime Support Facility EIR

PDFenvironmental-summary

Terminal Island Maritime Support Facility Project Draft Environmental Impact Report

PDFother

Chapter 5 Comparison of Alternatives - Environmental Impact Report

PDFenvironmental-impact-report

DTSC Comments on Terminal Island Maritime Support Facility DEIR

PDFcomment

Chapter 4 Cumulative Analysis for Port of Los Angeles Project

PDFenvironmental-impact-report-section

SCH #2023120181 Terminal Island Maritime Support Facility Final EIR

PDFfinal-eir

Appendix A - Notice of Preparation/Initial Study for Terminal Island Maritime Support Facility Project

PDFnotice-of-preparation

Terminal Island Maritime Support Facility Project Greenhouse Gas Emissions Section

PDFenvironmental-impact-report-section

Appendix B2 Health Risk Assessment for Diesel Particulate Matter

PDFhealth-risk-assessment

Chapter 9 References for Draft Environmental Impact Report

PDFother

Appendix D - Soil Management Plan for Terminal Island Maritime Support Facility

PDFsow

Partially Revised and Recirculated Draft Environmental Impact Report (RDEIR) Acronyms and Abbreviations

PDFother

Final Environmental Impact Report for Terminal Island Maritime Support Facility Project

PDFenvironmental-impact-report

Chapter 6 Significant Irreversible Changes Analysis

PDFenvironmental-impact-report-section

Partially Revised and Recirculated Draft Environmental Impact Report for Terminal Island Maritime Support Facility

PDFenvironmental-impact-report

SCH 2023120181 Terminal Island Maritime Support Facility Notice of Completion

PDFceqa-notice-of-completion

Notice of Determination for Terminal Island Maritime Support Facility Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles, Port of
Contacts2 people available
OfficeN/A
Organization / Agency
California → Los Angeles, Port of
Office AddressN/A
Contacts
Nicole EncisoMarine Environmental Supervisor
Lisa BlewittPhysical Sciences Group Manager

Interested Companies (1)

Show more
Aspen Environmental Group
Agoura Hills, CA

Full Description

Show more
The proposed Terminal Island Maritime Support Facility Project (Project) involves the development and operation of a chassis support facility on an approximately 89-acre site at 740 Terminal Way, San Pedro, CA 90731 at the Port of Los Angeles. The Project would construct and install office trailers, maintenance and repair facilities, chassis stalls, and appurtenant water and electrical infrastructure. The existing vacant Eldridge Street office building (750 Eldridge Street, San Pedro) would also be refurbished to support operations. This document is a Partially Revised and Recirculated Draft EIR, which reflects a revised opening year of 2029 and full build-out year of 2049 and updates the air quality emission calculations to reflect new assumptions relating to greater potential truck travel distances and on-terminal time frames, including idling times, during operations.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The scope of work includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, vegetation clearance, and stone rework for the revetted mole. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a price evaluation preference. Bidders must submit physical sealed envelopes by the deadline, as electronic submissions are prohibited. Required documentation includes SF 1442, the CLIN schedule, representations and certifications, and a bid guarantee. The contractor must provide key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Performance will be measured through pre- and post-dredge multi-beam surveys conducted by a third-party surveyor, and the contract includes liquidated damages of 2,297 dollars per calendar day of delay. Compliance with the Davis-Bacon Act and strict environmental and safety standards is required throughout the execution of the work.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 10 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price construction contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include demolition, clearing and grubbing, excavation, placing embankment, installing separator geotextiles, placing graded stone, and turf establishment and maintenance. Bids are due by October 19, 2026, at 10:00 a.m., with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on unit prices, provided they are reasonable and balanced. The contractor must adhere to EM 385-1-1 safety standards and the Davis-Bacon Act for prevailing wages. Performance requirements include submitting a preliminary project schedule within 15 days and an initial schedule within 42 days of the Notice to Proceed. The contract includes liquidated damages of $4,295.00 per calendar day of delay and requires the use of approved testing laboratories for quality control. A project labor agreement is not required for this acquisition.
W07V Endist New Orleans

POSTED

about 11 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS