2026 Pyramid Spillway Repairs (OM-SFD-2026-001)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 2026 Pyramid Spillway Repairs project, identified by solicitation number OM-SFD-2026-001, is a maintenance contract awarded by the California Department of Water Resources. The scope of work involves performing essential repairs on the Pyramid Dam Spillway and the outside footing of the right wall located in Castaic, Los Angeles County. Technical activities include pressure washing, patching, saw cutting, and sand blasting to address spalls, delamination, cracks, and joint sealant. Additionally, the contractor will use low pressure washing to remove algae and organic growth, with all water from hydro demolition and pressure washing collected in a flip bucket at the bottom of the spillway. All project activities and access are strictly confined to the DWR right of way. The project is classified as exempt under CEQA Class 1 for existing facilities, as it consists of routine maintenance with no anticipated environmental impacts. Administrative oversight is managed by the DWR Division of Operations and Maintenance, with Sara Lowry serving as the Environmental Program Manager and Janine Beck as the Environmental Scientist. The work is categorized under NAICS code 237990.

General Info

DWR contract OM-SFD-2026-001 for Pyramid Dam Spillway repairs and maintenance in Castaic.

Agency

California Water Resources, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Templin Hwy, Golden State Hwy, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for 2026 Pyramid Spillway Repairs OM-SFD-2026-001

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Janine BeckEnvironmental Scientist
Sara LowryEnvironmental Program Manager

Full Description

Show more
Department of Water Resources (DWR) and Contractor will perform maintenance on the Pyramid Dam Spillway and on the outside footing of the right wall. Work will include pressure washing, patching, saw cutting, and sand blasting of spalls, delamination, cracks, and joint sealant. Algae and organic growth may be removed by low pressure washing. Water from hydro demolition and pressure washing will be collected in a flip bucket.at the bottom of the spillway. All access and work is within DWR right of way.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 23 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS