Big Creek to Carmel Drainage Restoration

Forecast
EPIMS-MON-61596-R4State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Big Creek to Carmel Drainage Restoration project, identified by Agreement Number EPIMS-MON-61596-R4, is a Lake or Streambed Alteration Agreement executed by the California Department of Fish and Wildlife for the California Department of Transportation District 5. Located on State Route 1 in Monterey County at highway post miles 30.10, 30.86, and 33.87, the project focuses on improving drainage infrastructure. The scope of work includes replacing degraded culverts, headwalls, and drainage inlets, installing rock slope protection, removing vegetation for construction access, and implementing temporary stream diversions and erosion control treatments. The project is governed by Fish and Game Code section 1602 and requires adherence to a specific Mitigation Reporting or Monitoring Plan adopted by the California Department of Fish and Wildlife. Initial approval was granted on January 26, 2026, with a subsequent Amendment No. 1 approved on July 14, 2026, which introduced provisions for night work and modified geotextile fabric inspection periods. The project has been determined to have no significant environmental effect within the jurisdiction of the California Department of Fish and Wildlife, provided that the adopted mitigation measures are followed. Key administrative contacts include Lara Bertaina for the lead agency and Mindy Trask for the responsible agency.

General Info

CDFW agreement for Caltrans District 5 to restore drainage infrastructure on State Route 1.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 5 - San Luis Obispo/Santa Barbara
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Mindy TraskSenior Environmental Scientist, Specialist
Lara BertainaLead Agency

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake or Streambed Alteration Agreement (EPIMS-MON-61596-R4), pursuant to Fish and Game Code section 1602, to the project Applicant, California Department of Transportation (Caltrans). The Project includes activities related to replacing degraded culverts and associated features such as headwalls and drainage inlets and installing rock slope protection, as well as vegetation removal for construction access, temporary stream diversion, and installing erosion control treatments.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 23 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 24 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 24 hours ago

DEADLINE

in about 1 year
View Details

More opportunities from California → Caltrans, District 5 - San Luis Obispo/Santa Barbara

Same awarding agency

NAICS: 237310
SLED
Vandenberg Village Pavement Preservation Project (CAPM)
Solicitation # 05-1N890
The Vandenberg Village Pavement Preservation Project (CAPM), managed by Caltrans District 5 under solicitation 05-1N890, focuses on the rehabilitation of approximately 27 lane miles of pavement on State Route 1 in Santa Barbara County, specifically from post mile 23.000 to 29.891. The scope of work includes the application of Rubberized Hot Mix Overlay, cold planing, shoulder widening and backing, drainage restoration, and guardrail upgrades. Additionally, the project will implement bicycle conflict markings and the rehabilitation of 21 curb ramps to ensure ADA compliance. Construction is anticipated to take place between the summer and winter of 2027, with an estimated duration of 170 to 200 working days. The project is governed by a Mitigated Negative Declaration under CEQA, ensuring that no significant environmental effects will occur provided that specific mitigation measures are followed. Key regulatory requirements include adherence to the Caltrans 2023 Standard Specifications for emissions reduction, air pollution control, solid waste disposal, and temporary traffic control. Necessary permits to be obtained before construction include a Nationwide Permit from the U.S. Army Corps of Engineers, a Streambed Alteration Agreement from the California Department of Fish and Wildlife, and Water Quality Certification from the Regional Water Quality Control Board. A comprehensive Transportation Management Plan and a Mitigation and Monitoring Plan will be developed during the design phase to manage traffic and protect jurisdictional waters and riparian habitats.
Highway, Street, and Bridge Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
San Benito U.S. Route 101 Pavement Rehabilitation Project
Solicitation # 05-1J840
The California Department of Transportation (Caltrans) District 5 is implementing the San Benito U.S. Route 101 Pavement Rehabilitation project (EA 05-1J840). The project involves the rehabilitation of 30.290 lane miles of pavement along a 7.55-mile section of U.S. Route 101, extending from the Monterey-San Benito County line to the San Benito-Santa Clara County line. Key deliverables include the application of a 0.15-foot rubberized hot mix asphalt overlay, the restoration of 28 culverts across 12 locations, and the installation of a wildlife undercrossing with directional fencing and escape ramps. Additionally, the scope includes upgrading concrete barriers, metal beam guardrails, and end treatments to meet Manual for Assessing Safety Hardware standards, as well as replacing one traffic census station and repairing two others. Construction is expected to begin in July 2030 with an anticipated completion date of January 2034. The project has undergone environmental review under CEQA and NEPA, resulting in a Mitigated Negative Declaration. Mitigation measures are in place to protect biological resources, specifically special-status species such as the western burrowing owl, Monterey hitch, and central California coast roach, and to manage risks associated with abandoned oil and gas wells. The project is funded through the Roadway Preservation Program for delivery in Fiscal Year 2029-2030 and adheres to Title VI of the Civil Rights Act and ADA accessibility requirements.
Highway, Street, and Bridge Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
State Route 68 Drainage ImprovementsThe State Route 68 Drainage Improvements project, managed by Caltrans District 5 in San Luis Obispo, involves comprehensive infrastructure repairs and upgrades along State Route 68 in Monterey County, specifically between postmiles 0.2 and 15.7. The scope of work includes the replacement of seven culverts, installation of headwalls, flared end sections, and rock slope protection, as well as electric system upgrades and lighting improvements. Additionally, the project requires the installation of Transportation Management System traffic monitoring equipment at 27 locations. Support services include vegetation trimming and removal, equipment access and staging, and temporary stream diversion and dewatering. Environmental compliance is a critical component of the project, as it is subject to the California Environmental Quality Act and holds a California Endangered Species Act Incidental Take Permit. The project is authorized for the incidental take of the threatened California tiger salamander, with identified impacts including permanent and temporary loss of upland habitat. Project approval is contingent upon the implementation of specific mitigation measures and a monitoring plan to ensure no significant environmental effects occur. The lead agency for this effort is the California Department of Transportation, District 5, with administrative oversight provided by the California Transportation Commission.
Highway, Street, and Bridge Construction

POSTED

11 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Alamo Pintado Bridge Replacement
Solicitation # EA 05-1M420
The Alamo Pintado Bridge Replacement project, identified by solicitation number EA 05-1M420, involves the replacement of the scour-critical Bridge Number 51-0130 on State Route 246 in Santa Barbara County, specifically from post miles 30.173 to 30.435. Managed by Caltrans District 5, the scope of work includes the construction of a 120-foot 8-inch long and 59-foot wide three-span concrete deck bridge. Key infrastructure improvements include the installation of straight abutment walls, rock slope protection for embankments and nearby structures, and the upgrade of four outdated ADA curb ramps at the Alamo Pintado Road intersection. Additionally, the project will feature a 14-foot-wide Class 1 Bikeway with two-foot-wide barriers and a northeast retaining wall to ensure continuous pedestrian and cyclist access. Environmental compliance is a primary focus, with the project having completed reviews under CEQA and NEPA, resulting in a Mitigated Negative Declaration. Contractors must adhere to strict biological protections, including inspections by a qualified biologist for American badgers and other wildlife within three days of any ground-disturbing activities. Operational requirements mandate that field work occur between 8:00 am and 3:00 pm, Monday through Friday, with no overnight storage of equipment permitted on site. The project also emphasizes non-discrimination in accordance with Title VI of the Civil Rights Act of 1964 and requires adherence to Caltrans Standard Specifications for the disposal of electrical equipment and the marking of environmentally sensitive areas.
Highway, Street, and Bridge Construction

POSTED

12 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement